Reduced Receiving Inspection - Now What

harry

Super Moderator
#11
EN 10204 3.1 Certification

3.1 is a certificate issued by the mill which declares that the plates are in compliance with the specification and includes the test results.

Test results are validated by the mill’s in–house test department which has to be independent of the manufacturing department.


EN 10204 3.2 Certification

3.2 Certification is more rigorous and the certificate is prepared jointly by the mill’s inspection department and an independent 3rd party inspectors such as TUV or Lloyds Register. The certificate states that the plates are compliant with the relevant specification and the mill test certificate is included.
1. You have to understand and find out why you are keeping the certificates and the need to review it. Is it to meet contractual requirements, customer requirements, in-house requirements or design requirements.

2. You also have to know what are the items to review and their criteria

3. With regards to the 2 types of certificates, it is again a requirement. If none, either one should be acceptable. Again depending on requirements, you may have to send samples for independent testing to make sure.
 
Elsmar Forum Sponsor
G

Greenapple

#12
Hi Mr. Harry,

Please correct me if im wrong, we're reviewing it to verify whether the items meet our customer requirement and complies as per the required standards.
Since we have these Mechanical Equipments (Pumps, Vessels, Valves, etc), I really want to know where should I concentrate or where to put an emphasis on reviewing such Documents. Since it is not possible to read all what is written in dossiers.
And for a file of final dossier for pumps as an example, what Documents are required to be included on it?
Thanks Mr. Harry...
 
S

ssz102

#13
in my opinion, if you want to reduce time on inspect products, you can determine which the material is critical or commonly parts firstly; for the commonly material, you may be to ask the supplier provide with Certificate of Conformity or quality test report and MSDS;
if the defect parts was found on produce line, you would request vendor repair it come to company or pay for working time
 
Thread starter Similar threads Forum Replies Date
R Reduced sampling plan for sterial products APQP and PPAP 0
A Reduced Testing of Pharmaceutical Raw Materials Pharmaceuticals (21 CFR Part 210, 21 CFR Part 211 and related Regulations) 2
B Integrating ISO 9001/27001 External Audits - Audit Time Reduced? Discounts? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
I Is risk acceptability really needed if all risks must be reduced as far as possible? ISO 14971 - Medical Device Risk Management 6
E Number of medical device clinical trials has reduced by 20% in Korea Other Medical Device Regulations World-Wide 1
T Reduced Audit days when UPGRADING from AS9100 to TS16949 - Is it possible? IATF 16949 - Automotive Quality Systems Standard 2
Q Reduced Device License Fee was rejected for being sent in too early Canada Medical Device Regulations 2
G Reduced Insurance Premium with ISO 14001 or ISO 9001 Certification ISO 14001:2015 Specific Discussions 3
S How to make reduced sampling plan Inspection, Prints (Drawings), Testing, Sampling and Related Topics 6
W Reduced Sampling Plan - Going from a Normal to a Reduced Sampling Plan Inspection, Prints (Drawings), Testing, Sampling and Related Topics 4
Z Tracking Lots for Reduced and Tightened Inspection Inspection, Prints (Drawings), Testing, Sampling and Related Topics 2
Z Reduced Sampling based on Process Capability (AS9100 Standard) Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
ScottK Maintaining an SPC program with reduced staffing Statistical Analysis Tools, Techniques and SPC 8
M AQL vs. Cpk - Sample Size and Reduced Sample Size AQL - Acceptable Quality Level 16
D Successful Validation = Reduced Inspection? No Inspection?? ISO 13485:2016 - Medical Device Quality Management Systems 7
L ANSI/ASQ Z1.4-2003 - Page 13 in reduced sampling code "M" sample size Inspection, Prints (Drawings), Testing, Sampling and Related Topics 0
L Layout and flow improvements - Reduced walking time? Cost savings? Lean in Manufacturing and Service Industries 11
N To Register to ISO 9001 or Not To Register? Will customer audits be reduced if we do? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
Marc Quality In Tourism And Demand From People With Reduced Capabilities Service Industry Specific Topics 5
L Reduced Inspection & SPC Inspection, Prints (Drawings), Testing, Sampling and Related Topics 5
C Skip-Lot Testing and the FDA - Reduced Testing Plan for Raw Materials Statistical Analysis Tools, Techniques and SPC 8
B FMEA - Reduced Detection Ranking by Use of Preventative Maintenance FMEA and Control Plans 6
M WI vs SOP - Shipping/Receiving Document Control Systems, Procedures, Forms and Templates 3
R AS9100 - 8.4.2 - Receiving Inspection Requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
Skooma Receiving Inspection - Boss trying to save money AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 7
J Requirements for Layered Process Audits including Maintenance, Shipping, Receiving IATF 16949 - Automotive Quality Systems Standard 4
I Receiving Inspection Requirement in IATF IATF 16949 - Automotive Quality Systems Standard 3
D Incoming (Receiving) Inspection - General form for incoming part inspection Document Control Systems, Procedures, Forms and Templates 17
D Minor non-conformance for not receiving a CofC from a heat treater Manufacturing and Related Processes 10
V Receiving Inspection AQL - Am I allowed to just pick a AQL? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 10
M Controls for Suppliers of Translation Services - Receiving and Verification Supplier Quality Assurance and other Supplier Issues 5
C Receiving Gage Design Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
J Receiving Inspection for Metal Strips & Wires Inspection, Prints (Drawings), Testing, Sampling and Related Topics 7
T Example Training Checklist for Receiving Inspector Training - Internal, External, Online and Distance Learning 3
L Objectives for Receiving Inspection (Resources) ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
A Receiving Goods Inwards - Identification Records and Data - Quality, Legal and Other Evidence 8
J Hardware Receiving Inspection AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 12
N Receiving Inspection - Who should receive raw material Inspection, Prints (Drawings), Testing, Sampling and Related Topics 12
J ISO 17025 testing laboratory - Receiving lab supplies - What really needs a C of A? ISO 17025 related Discussions 2
kedarg6500 Use of safety glasses at receiving inspection Occupational Health & Safety Management Standards 7
L How do you specify your receiving inspection parameters? Misc. Quality Assurance and Business Systems Related Topics 2
R Warehouse and shipping/receiving activities need to be part of our scope? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 28
A Receiving paper from the customer and never knowing when it will arrive Quality Manager and Management Related Issues 1
D Receiving Inspection Training Materials Inspection, Prints (Drawings), Testing, Sampling and Related Topics 7
S So Annoyed with Receiving Inspection! Inspection, Prints (Drawings), Testing, Sampling and Related Topics 16
A MIL STD 105 D or ISO 2859-2? Receiving Metal Sheets Quality Tools, Improvement and Analysis 6
C ISO13485 Incoming Receiving Parts Verification ISO 13485:2016 - Medical Device Quality Management Systems 13
R Minimum Essential Receiving Inspection (M.E.R.I.) Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
M Definition Receiving Inspection of Parts, finished products, service parts etc. Definitions, Acronyms, Abbreviations and Interpretations Listed Alphabetically 6
kedarg6500 Receiving Inspection Documentation Best Practices Supplier Quality Assurance and other Supplier Issues 2

Similar threads

Top Bottom