S
Sandy S
I work for an injection molding company. I am revising our control plans. I am making it more general because they are not really used except for during PPAP. Then only used as a required document. The reason is because we have so many other controls. I am still following AIAG Format. Except where I would normally list the control item specification I am putting " Refer to daily inspection standard" or "refer to packing standard". Under packing I am replacing the actual information and putting W/I numbers and "refer to packing standard". Will this be acceptable for a TS Audit? Please Help!!