S
Looking for some guidance. I feel that you can get a bit silly with control plans and start referencing every procedure prior to production if you want. I am trying to understand best practicies. Do you need to reference "General Recieving", "Receiving Inspection" and "Warehouse" procedures on a production control plan. The parts come in the door, skip lot inspection is the next step and then parts are warehoused before moving to production. Do we need to reference Recieving, Recieving/Inspection, and Warehous Procedures on the control plan? Thank you in advance.