I'd like to be able to use Risk to guide my car system and next steps, but we currently dont have FMEA's set up. Is there an alternative way to be able to implement a standardized system without them, or do I need the FMEA to guide any Risk based system?
 
Elsmar Forum Sponsor

yodon

Staff member
Super Moderator
#3
I'd like to be able to use Risk to guide my car system and next steps,
That's a good idea.

but we currently dont have FMEA's set up.
I don't see the relationship. An FMEA might be helpful to understand the underlying causes of the nonconformity but not, I don't believe, in determining the risk.

Is there an alternative way to be able to implement a standardized system without them, or do I need the FMEA to guide any Risk based system?
Generally, risk is the product of severity and likelihood (probability). So keep it simple. A 5x5 matrix (severity x probability) is pretty typical. You would need to define your levels of both severity and probability (based on the answer to the question @indubioush posed) and then use that as a guide to drive your subsequent actions.
 

marcusja2002

Involved In Discussions
#4
indubioush

Manufacturing / Assembly

yodon

You actually see the relationship better then you realize. The FMEA will develop an RPN number which consists of Severity, Likelihood of Occurance and Detectability. I'm used to having a detailed FMEA to guide every possible failure and if a new failure shows up, the FMEA is updated with eventual controls put in place through the corrective action process. The FMEA is supposed to be a living document.

Problem is that is a very alien idea to my current company and would be an elephantine task to push through at time time. That is why I'd like to develop a CAR system without the need for the FMEA's and then use the CAR system to help develop them slowly.

Then over time with new development introduce fresh FMEA's. Chicken vs Egg.

The problem is our product has 1000's of parts with multiple failure modes, so I'm having a difficult time visualizing just a Severity and Probability chart.

This actually was an ad that popped us as I was typing. Connecting this to injurying or the ability to function is where I have the tough time still seeing.

1572894732969.png
 

Tagin

Trusted Information Resource
#5
I'm used to having a detailed FMEA to guide every possible failure and if a new failure shows up, the FMEA is updated with eventual controls put in place through the corrective action process. The FMEA is supposed to be a living document.
If I understand correctly, are you essentially looking for some kind of risk model for the CAR system to feed into, in a manner similar to how you describe CARs feeding into an FMEA model in your previous experience?
 

marcusja2002

Involved In Discussions
#6
If I understand correctly, are you essentially looking for some kind of risk model for the CAR system to feed into, in a manner similar to how you describe CARs feeding into an FMEA model in your previous experience?
Yes

Using Yodons Idea, I believe if I can get Management to set these limits I might be able to get this system moving.

Set a defect limit 3,5,10 etc. and a Severity which may not be a number but a type of action, shutting down the line, prevention of specific functions, etc.

If I have that list created I believe I can make this work.

1573240752153.png
 

Attachments

yodon

Staff member
Super Moderator
#7
Just be careful about getting too complex.

I tend to go for simplicity. Is the NC systemic? If yes, then CAPA. If not, then fix it.

If you have a systemic, low-severity NC, it would appear that you might not consider it eligible for a CAPA.

If you have a process that is only done every other quarter and it consistently produces NCs, it might be excluded based on question 3.

Not saying this won't work for you; just making sure you're thinking it through and considering the effects.
 

Tagin

Trusted Information Resource
#8
I agree w/Yodon. That kind of algorithmic decision tree is restrictive if used as a rule. It might be useful as an aid, but I wouldn't be constrained by it.

- Management's option for an 8D doesn't even show up unless all the other preceding decisions pass.
- The defect qty in most cases needs to be related to the volume processed in a timeframe. In other cases, the defect qty might be unique by specific product.

You might be better off to have something that simply says something like:
"The quality person/team will consider defect qty (or percentage), defect trends, severity, customer and management input in determining if an 8D should be initiated.
If within the scope of an existing 8D, then the issue will be handled under that 8D." etc., etc.
 

Bill Levinson

Industrial Statistician and Trainer
#9
Re: "Problem is that is a very alien idea to my current company and would be an elephantine task to push through at time time. That is why I'd like to develop a CAR system without the need for the FMEA's and then use the CAR system to help develop them slowly. "

The new AIAG FMEA manuals are excellent, and improve greatly on the approach from 15 or 20 years ago. They provide much better guidance on the Occurrence and Detection rating.

I have however been looking at a simpler option for organizations that are not required to do formal FMEAs and do not want to use them. The Army uses DD2977 (Deliberate Risk Assessment Worksheet) which is in the public domain as a publication of the U.S. Government. It uses only a Severity rating and a combined probability rating (which seems to merge Detection and Occurrence) and a risk matrix very similar to what you included above. The Army's Risk Management Process also raises the point that the risk of something happening includes not only its probability (the FMEA occurrence rating) but also the frequency with which we are exposed to the risk.

This can still be connected to a control plan for each potential failure mode, but the assessment process is simpler than for traditional FMEA.
 

Attachments

Thread starter Similar threads Forum Replies Date
Ashok sunder Is it possible to reduce Risk likelihood and impact Post control Ranking after corrective action taken for risk? FMEA and Control Plans 1
I Fault Tree Analysis (FTA) - Application - Preventive, Corrective or Risk Analysis? Quality Tools, Improvement and Analysis 10
B Risk Analysis - Voiding CPAR's (Corrective Preventive Action Request) Nonconformance and Corrective Action 17
H Risk Analysis and Probability of Occurrence ISO 14971 - Medical Device Risk Management 3
B Risk analysis for defective measuring or measuring equipment out of calibration General Measurement Device and Calibration Topics 2
P Benefit risk analysis on pFMEA ISO 14971 - Medical Device Risk Management 9
B AS9102 - 3D printing a special tool required for assembly (counterfeit risk?) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 12
K Defining risk control measures IEC 62304 - Medical Device Software Life Cycle Processes 14
U Supply risk management Manufacturing and Related Processes 4
T Biological Evaluation (10993) & Risk Management ISO 14971 - Medical Device Risk Management 9
D Cybersecurity and Risk Management: Loss of confidentiality IEC 62304 - Medical Device Software Life Cycle Processes 5
Q FMEA and Risk assessment in Microsoft Access FMEA and Control Plans 6
I Realization processes input into overall risk ISO 14971 - Medical Device Risk Management 2
M Need Help With Information Security Asset Risk Register IEC 27001 - Information Security Management Systems (ISMS) 2
thisby_ Post Market/Production Risk Assessment ISO 14971 - Medical Device Risk Management 0
S Risk Management Review ISO 14971 - Medical Device Risk Management 4
D Low risk IVD study in the UK, do I need MHRA approval? UK Medical Device Regulations 1
S Risk Management and other Files ISO 14971 - Medical Device Risk Management 8
silentmonkey Overall Benefit/Risk Analysis - Risk Management VS Clinical Evaluation ISO 14971 - Medical Device Risk Management 3
N ISO 27001 for Jumb Burger - Risk Assessment sheet IEC 27001 - Information Security Management Systems (ISMS) 11
C Risk Assessment Tools ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
qualprod Examples to mitigate risk from Covid ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
G Risk of stopping your customer's line IATF 16949 - Automotive Quality Systems Standard 4
C Risk Matrix vs FMEAs ISO 14971 - Medical Device Risk Management 12
S IVD risk class II devices for Brazil and MDSAP Other Medical Device Regulations World-Wide 0
M ISO 14971:2019: Criteria for overall residual risk ISO 14971 - Medical Device Risk Management 11
M ISO14971:2019 - Verification of implementation and effectiveness of risk control ISO 14971 - Medical Device Risk Management 3
Aymaneh Medical Device Cybersecurity Risk Management IEC 27001 - Information Security Management Systems (ISMS) 2
S Traceability of requirements to design and risk Design and Development of Products and Processes 3
R Risk control measures as per ISO 14971 ISO 14971 - Medical Device Risk Management 6
D Deciding whether or not pre-market clinical investigation is required for low risk device EU Medical Device Regulations 5
R The term "Benefit Risk Ratio" in EU MDR, do I need to present benefit risk analysis as a RATIO Risk Management Principles and Generic Guidelines 4
_robinsingh Security Risk Assessment Tool IEC 27001 - Information Security Management Systems (ISMS) 0
A 21 CFR 820 - Risk Management - Looking for some guidance US Food and Drug Administration (FDA) 3
bryan willemot Contract Review and risk managment AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
D Risk Analysis using Monte Carlo Simulation instead of Scoring and Heat Map Risk Management Principles and Generic Guidelines 2
Sravan Manchikanti Software Risk Management & probability of occurrence as per IEC 62304 IEC 62304 - Medical Device Software Life Cycle Processes 8
E Normal Condition Hazards in Risk Analysis ISO 14971 - Medical Device Risk Management 3
silentmonkey Rationalising the level of effort and depth of software validation based on risk ISO 13485:2016 - Medical Device Quality Management Systems 10
R Risk assessment on IT containers and the information they contain IEC 27001 - Information Security Management Systems (ISMS) 4
B Threat/Vulnerability Catalogue for risk assessment IEC 27001 - Information Security Management Systems (ISMS) 4
R Opportunity For Improvement vs Opportunity (Positive Risk) ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 18
R FOD Risk Assessment - What tools would you recommend for assessing FOD risk? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
R Identify Medical Device characterstics as Annex C of ISO 14971 Risk Management ISO 14971 - Medical Device Risk Management 5
A ISO 14971 PFMEA Manufacturing Risk ISO 14971 - Medical Device Risk Management 2
Q Example of the Risk Template Document Control Systems, Procedures, Forms and Templates 1
K Overall residual risk according to ISO 14971:2019 ISO 14971 - Medical Device Risk Management 5
A Risk Number for each software requirement IEC 62304 - Medical Device Software Life Cycle Processes 7
A IEC 60601 11.2.2.1 Risk of Fire in an Oxygen Rich Environment, Source of Ignition IEC 60601 - Medical Electrical Equipment Safety Standards Series 0
D Importing a general wellness low risk product Other US Medical Device Regulations 3