Sorry for the length of this post. I would like to enlist the expertise on this forum to help define the proper extent to which risks should be distinctly identified. First, let me lay the ground work by defining the elements of risk:
This ambiguity leads evaluators to have to choose between a few different techniques:
So my questions are:
- Harm: Physical injury or damage to the health of people, or damage to the property or the environment.
- Hazard: Potential source of harm
- Severity: Measure of the possible consequences of a hazard
- Risk: Combination of the probability of occurrence of harm and the severity of that harm
This ambiguity leads evaluators to have to choose between a few different techniques:
- Define harm in a generic sense (e.g., as “electric shock” instead of cardiac arrest, severe burn, minor burn, etc…) and then assign probability as the likelihood of the hazardous situation.
- The risk is difficult to assess due to ambiguity in the harm. This also potentially omits a mitigation that would have been necessary if each harm had been considered individually.
- Define harm to be the most likely consequence of the hazard and assign probability accordingly.
- This ignores the worst case outcome. Maybe this is OK if that outcome is highly improbable, but you won’t know unless you consider each outcome.
- Define harm to be the worst case outcome and assign probability only for that harm.
- The most probable harm may not be properly addressed.
- Define harm to be the worst case outcome and assign probability as the likelihood of the hazardous situation.
- The resulting risk may not represent an actual scenario and may force risk control measures that aren’t actually necessary.
- Exhaustively cover all possible harms that could result from the hazard.
- All possible scenarios are properly addressed but the resulting analysis may challenge War and Peace for length which, in turn, puts everybody in a foul mood.
So my questions are:
- Which technique do you think is most correct? If not one of these five, then what?
- Which technique most closely resembles your current practice and how has that been viewed by auditors?