SBS - The Best Value in QMS software

Root Cause for Missed Audits

#1
I have a Customer audit observation- Why Internal audit of Purchase and MR function not conducted in December as per plan ?
What can be the root cause and corrective action for such a observation.
Regards,
Deepak Sharma
 
Elsmar Forum Sponsor

AMIT BALLAL

Trusted Information Resource
#2
I have a Customer audit observation- Why Internal audit of Purchase and MR function not conducted in December as per plan ?
What can be the root cause and corrective action for such a observation.
Regards,
Deepak Sharma
You'll need to do why-why analysis in order to reach to the root cause analysis. Why the audit was not done as planned?
 
Thread starter Similar threads Forum Replies Date
qualprod What is exactly the root cause? Nonconformance and Corrective Action 9
M Test failure Root cause not found Customer Complaints 10
Tagin You're Gonna Need a Bigger Root Cause Coffee Break and Water Cooler Discussions 12
Q IATF audit - Root Cause Analysis results IATF 16949 - Automotive Quality Systems Standard 5
qualprod D5 of 8D clarification, how to verify root cause Problem Solving, Root Cause Fault and Failure Analysis 26
T Tactics for Root Cause Analysis Problem Solving, Root Cause Fault and Failure Analysis 4
W Misinterpretation of requirement acceptable as root cause? Problem Solving, Root Cause Fault and Failure Analysis 19
T Root Cause Failure Analysis - Not following Customer packaging Specification Problem Solving, Root Cause Fault and Failure Analysis 9
qualprod Always one root cause? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 35
I Root Cause Analysis as Training ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
F Struggling with a root cause analysis - Customer Returns - Escape issue Problem Solving, Root Cause Fault and Failure Analysis 15
G Working on a Root Cause Problem Solving, Root Cause Fault and Failure Analysis 11
I Root Cause Analysis when someone simply stops performing a task? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 16
C Neglect or legitimate deferral? Is excessive workload or lack of resources in a department or a team a valid root cause for a non-conformance? Problem Solving, Root Cause Fault and Failure Analysis 12
E CAR (Corrective Action Report) with questionable Root Cause ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 16
S Root cause analysis - The system of developing a work instruction is not effective Problem Solving, Root Cause Fault and Failure Analysis 1
I What if your root cause analysis is -- they just didn't do it?" Nonconformance and Corrective Action 3
Ed Panek Root Cause CAPAs from internal audit ISO 13485:2016 - Medical Device Quality Management Systems 16
A Interesting Discussion Human Factors as Root Cause AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 13
D Root Cause on Non-Conformity Against Quality Manual Problem Solving, Root Cause Fault and Failure Analysis 9
A CAR from 3rd party AS9100D auditor - Root cause dilemma AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 45
P Examples of Nonconformance, Corrective Action Requests, and Root Cause Analysis Nonconformance and Corrective Action 2
Q Loss of Personnel - Root Cause Analysis ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 8
P Root Cause for a Process Validation Batch Failure 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 2
H How to define Root Cause when some points are out of control chart Statistical Analysis Tools, Techniques and SPC 6
K What is supposed to happen when a CA cannot be closed out or the root cause... General Auditing Discussions 1
T Human Error vs Technique Root Cause (Categories) Human Factors and Ergonomics in Engineering 9
Q Several Nonconformances with same Root Cause with just one CA ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 15
D Customer Audit - Root Cause Help - ISO 9001:2008 Cl. 7.5.3 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
Q Risk Tools in ISO 31010 - Root Cause Analysis vs. Cause-and-effect Analysis ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
E Root Cause Analysis - Is Insufficient Understanding an acceptable Root Cause? General Auditing Discussions 9
N Root Cause Challenge: The guy at the top ... Problem Solving, Root Cause Fault and Failure Analysis 4
V Root Cause help needed - Sheet metal breaking at press Problem Solving, Root Cause Fault and Failure Analysis 9
W Root Cause Analysis Requirements per TS 16949:2009 Problem Solving, Root Cause Fault and Failure Analysis 8
S Preparing a Root Cause Report - Possible Root Causes Document Control Systems, Procedures, Forms and Templates 11
J Required on-site training on writing deviations & root-cause analysis Training - Internal, External, Online and Distance Learning 3
P Is it a rule to fill in all the 5 why in order to get the actual root cause? Quality Tools, Improvement and Analysis 5
D Root Cause Analysis done on the wrong observation Problem Solving, Root Cause Fault and Failure Analysis 9
H Root Cause Corrective Action Examples Nonconformance and Corrective Action 4
I What's special about your RCAs (Root Cause Analysis)? Problem Solving, Root Cause Fault and Failure Analysis 11
R Root Cause for "Simple" External Audit Findings ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
U Root Cause for a Form not having all info (traceability standard and the gage number) Problem Solving, Root Cause Fault and Failure Analysis 14
K Quality Manual Problem Root Cause Analysis Nonconformance and Corrective Action 8
J Root Cause Determination Training for Production Managers Nonconformance and Corrective Action 6
E Using Facebook to discuss Root Cause Analysis (8D) ! Nonconformance and Corrective Action 3
C Must we identify steps taken to identify the Root Cause of a failure Nonconformance and Corrective Action 15
F Need advise on Root Cause analysis for printing issue Problem Solving, Root Cause Fault and Failure Analysis 3
S Can you suggest a Root Cause supporting Out of Specification Process AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 7
L Root Cause for Minor Non-conformance regarding Supplier Delegation Nonconformance and Corrective Action 5
P What do you think is the most common root cause of NCRs in a construction project? Quality Manager and Management Related Issues 3

Similar threads

Top Bottom