Hi to everibody

is there any RPN under which can be any recommendation or corrective action?

Is there any regulation about it?

Thanks in advance

Sergio ?vila
 
Elsmar Forum Sponsor

Jim Wynne

Staff member
Admin
#2
I think what you're asking is whether there is threshold or limit where recommended actions become mandatory, and the answer is "no." The 4th edition PFMEA manual specifically advises against RPN thresholds.
 

John Broomfield

Staff member
Super Moderator
#3
Hi to everibody

is there any RPN under which can be any recommendation or corrective action?

Is there any regulation about it?

Thanks in advance

Sergio ?vila
Sergio,

If your RPNs come from your assessment of adverse risks then you are driving preventive action.

You will be removing the root causes of potential nonconformity according the the priorities indicated by your RPNs.

You may choose not to invest in preventive action when such action exceeds the price of the future nonconformity.

Depending on the criteria in your RPN tables (severity, frequency, ability to detect) this should coincide with adverse risks that management is willing to accept. You could then ask a top manager to sign-off on this acceptance of risk.

If the top manager is unwilling to sign then invoke the preventive action and reconsider your RPN criteria or the RPN at which your procedure specifies the need for preventive action.

Residual adverse risks must be known by those who are responsible so they may be managed, accepted or insured.

John
 
Thread starter Similar threads Forum Replies Date
W Is the RPN (risk priority number) in the PFMEA really a RPN without the detectability ISO 14971 - Medical Device Risk Management 4
K RPN/ KC) per AIAG FMEA and Control Plans 0
T RPN Thresholds and How Detection Fits In ISO 14971 - Medical Device Risk Management 5
N Timing for Closing High FMEA RPN Items FMEA and Control Plans 4
Moncia Recalculating RPN (FMEA Risk Priority Number) - Customer Request APQP and PPAP 10
M Requiring action on factors alone of RPN in FMEA APQP and PPAP 7
C PFMEA RPN - Feedback regarding adjusted RPN FMEA and Control Plans 3
N How to reduce RPN of Visual Inspection Process FMEA and Control Plans 6
S PFMEA RPN - At what RPN level do you take actions in the FMEA? APQP and PPAP 4
C How to handle Action Results in a new FMEA Review once we have a new RPN? FMEA and Control Plans 1
L FMEA - Calculating RPN = S*O*D FMEA and Control Plans 3
Q Why is the FMEA RPN = S*O*D? FMEA and Control Plans 10
G Determining the "Detection" Number Component of the FMEA RPN FMEA and Control Plans 5
K How do you determine what is acceptable base on an FMEA RPN FMEA and Control Plans 6
M Changing PFMEA (Process FMEA) RPN Values based on a Rejection FMEA and Control Plans 5
I PFMEA RPN Numbers Medical Device Risk Management FMEA and Control Plans 1
A PFMEA (Process FMEA) Detection Rating - Actions to Reduce RPN FMEA and Control Plans 3
K Do you have to use RPN in Medical Device Risk Analysis? Identification of Hazards ISO 14971 - Medical Device Risk Management 6
R When to take action if an FMEA RPN number is high? FMEA and Control Plans 43
G Relation b/n Process Failure Mode RPN Value and the associated Process Failure Cost FMEA and Control Plans 3
B Formula to calculate the Process Sigma from an RPN Six Sigma 17
E FMEA Action Plan Threshold (RPN) - Auditor says Action Plan for an RPN > 84 IATF 16949 - Automotive Quality Systems Standard 21
Howard Atkins FMEA RPN Reduction Process FMEA and Control Plans 4
M FMEA RPN Recalculation after Actions are (or are not) Taken FMEA and Control Plans 6
C PFMEA RPN rankings - Preventative action must be opened if RPN over 100 ISO 14971 - Medical Device Risk Management 9
R If two processes have same RPN NUMBER - which should have priority over the other? FMEA and Control Plans 3
T RPN of Action Results per the AIAG FMEA manual FMEA and Control Plans 5
N How to Calculate RPN in Design FMEA (DFMEA) vs. Process FMEA (PFMEA) FMEA and Control Plans 9
F What is a usual RPN level for requiring actions? FMEA and Control Plans 4
V Emphasizing Severity more than Occurrence and Detection vs. Overall RPN FMEA and Control Plans 20
L PFMEA (Process FMEA) issue about lower RPN - AIAG 3rd edition page 55 FMEA and Control Plans 13
B Corrective Actions Priority - Process FMEA (PFMEA) RPN Limits - Recommended Actions FMEA and Control Plans 20
R FMEA review, RPN reduction - Any "rule of thumb" as to what makes an RPN too high? FMEA and Control Plans 12
K RPN reduction - Occurrance Reduction - Reducing occurance of defect on line FMEA and Control Plans 1
A Does anyone actually do a Pareto of the Top 5 (highest) RPN's of PFMEA? FMEA and Control Plans 8
A Is there an established RPN number or score for a DFMEA? FMEA and Control Plans 1
S RPN Ranking - Put a formula in an access database or Excel .xls spreadsheet Excel .xls Spreadsheet Templates and Tools 12
G Assignation of RPN rating (Detection) on Visual Inspection where subsequent operation FMEA and Control Plans 18
D Ranking Audit Effectiveness with RPN General Auditing Discussions 3
R PFMEA - RPN - Severity, Occurrence and Detection - Which one does not change? FMEA and Control Plans 67
A Quick question about RPNs - Any RPN over 100 should be actioned? FMEA and Control Plans 9
J FMEA RPN Number and When to Recommend to Take Action FMEA and Control Plans 3
T Process FMEA (Failure Modes Effects Analysis) Severity Rating and RPN IATF 16949 - Automotive Quality Systems Standard 17
S FMEA - Reject a PPAP because the RPN number is not shown? QS-9000 - American Automotive Manufacturers Standard 6
S Process FMEA (PFMEA) RPN Corrective Action Plan FMEA and Control Plans 6
S FMEA RPN Corrective Action Plan QS-9000 - American Automotive Manufacturers Standard 1
R Defining the RPN cut off number - Working on the top 3- 5 high RPNs? FMEA and Control Plans 4
Kevin Mader FMEA Severity Index - Leading contributor to the RPN value FMEA and Control Plans 9
J RPN numbers in FMEA - It is not correct to go only by the RPN numbers when doing FMEA FMEA and Control Plans 12
T IMDS submission without supplier's input? RoHS, REACH, ELV, IMDS and Restricted Substances 0

Similar threads

Top Bottom