Please help,
We've been having discussions within my origanization regarding the necessity of ongoing analysis of data / capability studies on Safety Characteristics. Are these studies necessary for ongoing monitering? We currently have controls in our process that 100% verifies the welds and we also do destruct tests daily. Is this acceptable if the weld is an SC?
If it is acceptable to do 100% verification in liau of ongoing SPC/ Capability studies, could you please tell me where this is defined?
Thanks so much for you help.
Jen
We've been having discussions within my origanization regarding the necessity of ongoing analysis of data / capability studies on Safety Characteristics. Are these studies necessary for ongoing monitering? We currently have controls in our process that 100% verifies the welds and we also do destruct tests daily. Is this acceptable if the weld is an SC?
If it is acceptable to do 100% verification in liau of ongoing SPC/ Capability studies, could you please tell me where this is defined?
Thanks so much for you help.
Jen