smryan
Perspective.
Hi all. Long time..... 
I am revamping our D&D documentation to match existing process. For satisfying the ISO 9001:2008 7.3.5 Design & Development Verification requirement I am wondering how an Auditor would feel about something worded somewhat like this:
We build capacitors. Tiny. Big. Largest one in regular production is 35 lbs. They need to fit in their spots, but tolerances are relatively large in most cases.

I am revamping our D&D documentation to match existing process. For satisfying the ISO 9001:2008 7.3.5 Design & Development Verification requirement I am wondering how an Auditor would feel about something worded somewhat like this:
Dimensional verification occurs periodically through the process. Passing marks are not documented unless specifically requested by the customer. Failing marks and resulting actions are handled & recorded through our existing Non-Conforming procedure.
We build capacitors. Tiny. Big. Largest one in regular production is 35 lbs. They need to fit in their spots, but tolerances are relatively large in most cases.