My brother in-law is seeking help in writing (reviewing) an audit report that can stand on the court regarding the repair/renovation of their school building. The Office of the City Engineer issued a Certificate of Completion. It says that the project/work is 100% completed per plans, specification and program of work as per inspection their office and recommended the same for acceptance of the City Mayor.
Here are brother in-law’s Audit Findings:
The following materials/items existed only on paper (Bill of Materials and Cost Estimates)..in reality, on the ground, it did not exist:
Doors and Windows
a) 1 set 0.90x2.10 Panel Door w/ 2”x6” Jamb, Hinges, Door Knob
Cost of Material: @ P 5,195.20
Electrical Works
a) 2 sets 1X40W Flourescent Lamp with Louver
Tile Works
a) Existed on paper is 230 pcs Ceramic Floor Tiles 40X40, in reality, 10 pcs of tiles only.
Cost of Material: 18,400
Cost of Labor: 12,301.10
Electrical Work
a) 2 sets 1x40W Fluorescent Lamp w/ Louver
Cost of Material: P 2,971.40
b) 2 pcs CFL, 2U 15W
Cost of Material: P 220.00
Ceiling
The “Interior ceiling” 37.50 sq. m was declared as 100% completed, but it is leaking.
Cost of Materials: P 25,740.00
Cost of Labor: P 9,009.00
Here are brother in-law’s Audit Findings:
The following materials/items existed only on paper (Bill of Materials and Cost Estimates)..in reality, on the ground, it did not exist:
Doors and Windows
a) 1 set 0.90x2.10 Panel Door w/ 2”x6” Jamb, Hinges, Door Knob
Cost of Material: @ P 5,195.20
Electrical Works
a) 2 sets 1X40W Flourescent Lamp with Louver
Tile Works
a) Existed on paper is 230 pcs Ceramic Floor Tiles 40X40, in reality, 10 pcs of tiles only.
Cost of Material: 18,400
Cost of Labor: 12,301.10
Electrical Work
a) 2 sets 1x40W Fluorescent Lamp w/ Louver
Cost of Material: P 2,971.40
b) 2 pcs CFL, 2U 15W
Cost of Material: P 220.00
Ceiling
The “Interior ceiling” 37.50 sq. m was declared as 100% completed, but it is leaking.
Cost of Materials: P 25,740.00
Cost of Labor: P 9,009.00