(QS)4.9.g.1 Preventive Maintenance
The supplier shall identify key process equipment and provide appropriate resources for machined/equipment maintenance and develop an effective planned total preventive maintenance system. At a minimum, this system shall include: * A Procedure That Describes Planned Maintenance Activities * Scheduled Maintenance Activities * Predictive Maintenance Methods, these methods should include a review of appropriate items, such as the manufacturer’s recommendations, tool wear, optimization of uptime, correlation of SPA data to preventive maintenance activities, correlation of SPC data to preventive maintenance activities, important characteristics of perishable tooling, fluid analysis, infrared monitoring of circuits and vibrations analysis * A Procedure Providing for Packaging and Preservation for Equipment, Tooling and Gauging * Availability of Replacement Parts for Key Manufacturing Equipment * Documenting, Evaluation and improving Maintenance Objectives.
(TS)7.5.1.4 Preventive and Predictive Maintenance
The organization shall identify key process equipment and provide resources for machine/equipment maintenance and develop an effective planned total preventive maintenance system. As a minimum, this system shall include the following: * Planned Maintenance Activities * Packaging and Preservation of Equipment, Tooling and Gauging * Availability of Replacement Parts for Key Manufacturing Equipment * Documenting, Evaluating and Improving Maintenance Objectives. The organization shall utilize predictive maintenance methods to continually improve the effectiveness and the efficiency of production equipment.