Hello
During the production the product is 100% visual checked by the operator and if he find a piece with a aesthetic defect he scrap it. No sorted required, no decrease line speed and no added manpower required.
in FMEA AIAG VDA the severity rank says:
Liv. 3 "A portion of the production run may have to be reworked in-station before it is processed" → the word "reworked" means also "scarp"?