tonyjj
hello everyone,
i am currently working with a HVAC contractor implementing ISO 9001:2008.Can any one adivse me on how to approach site installation inspection both in-process and final, air-conditioning/refrigeration on a commerical scale.
does anyone have an example of an inspection sheet for same?
the service engineers use temperature measuring instuctments and pressure gauages do these have to be calibrated?
Many thanks in advance
i am currently working with a HVAC contractor implementing ISO 9001:2008.Can any one adivse me on how to approach site installation inspection both in-process and final, air-conditioning/refrigeration on a commerical scale.
does anyone have an example of an inspection sheet for same?
the service engineers use temperature measuring instuctments and pressure gauages do these have to be calibrated?
Many thanks in advance