Hi all,
I have just started to prepare documentation for a small machine shop
towards ISO 9001:2000 certification (2 lathes, 2 milling machines, 2
plasma cutting machines and some others). There is no production/process
planning when sending jobs ordered to job shop (just part list, estimated
labor, and drawings...). There is no job scheduling as well on the shop floor.
Foreman examines the drawings and hands over part drawings to operators
for machining. Operator decides which operation is the next and delivers part.
No route slips, time cards etc... Every operator records its machining
time "after" finishing the part and returns to foreman. It is obvious that
implementation of a manual or computerized system for planning and
scheduling seems impossible in a reasonable time and in a reasonable cost.
Failure on 7.5 is inevitable.
I am considering to stop working for them till they implement a working
system for planning/scheduling and control. I would appreciate any
suggestion and comment, insight from real-life experience on how to
proceed further.
Thank you in advance for any help.
Best
JNB
I have just started to prepare documentation for a small machine shop
towards ISO 9001:2000 certification (2 lathes, 2 milling machines, 2
plasma cutting machines and some others). There is no production/process
planning when sending jobs ordered to job shop (just part list, estimated
labor, and drawings...). There is no job scheduling as well on the shop floor.
Foreman examines the drawings and hands over part drawings to operators
for machining. Operator decides which operation is the next and delivers part.
No route slips, time cards etc... Every operator records its machining
time "after" finishing the part and returns to foreman. It is obvious that
implementation of a manual or computerized system for planning and
scheduling seems impossible in a reasonable time and in a reasonable cost.
Failure on 7.5 is inevitable.
I am considering to stop working for them till they implement a working
system for planning/scheduling and control. I would appreciate any
suggestion and comment, insight from real-life experience on how to
proceed further.
Thank you in advance for any help.
Best
JNB