Spring Steel Hydrogen Embrittlement

S

silentrunning

#11
There seems to be some disconnect with our platers and ASTM. The platers feel that 3 hours minimum at 350 degrees F should be adequate for spring steel with a Rockwell of 43 C scale. ASTM B850 recommends a minimum of 16 hours at 374 degrees to 428 degrees F. That is a very LARGE difference. The more I am learning, the more I see that this could be a major problem. I would like to solve this once and for all because a lot of our business is steel springs that are plated. :mg:
 
Elsmar Forum Sponsor

Golfman25

Trusted Information Resource
#12
There seems to be some disconnect with our platers and ASTM. The platers feel that 3 hours minimum at 350 degrees F should be adequate for spring steel with a Rockwell of 43 C scale. ASTM B850 recommends a minimum of 16 hours at 374 degrees to 428 degrees F. That is a very LARGE difference. The more I am learning, the more I see that this could be a major problem. I would like to solve this once and for all because a lot of our business is steel springs that are plated. :mg:
Yes but, I assume it was working fine before. So what changed? If the plater is doing the same thing as in the past, it sounds like the material might be suspect.

Try a different batch of material. Get the original tested. You may find the material was different. Or it is ok, and the plater needs to change his process. Good luck.
 
S

silentrunning

#13
Golfman, I have sent raw material, heat treated parts with no plating and plated parts to a lab for analysis. I hope they can give me a definitive answer. I am worried that this may be systemic though. The platers say nothing has changed in their processing. In my 40 years with the company we have never had a reject because of Hydrogen Embrittlement and now I want to make sure we go 40 more years with no problem.
 

Golfman25

Trusted Information Resource
#14
Steel is an interesting animal. Can run without issue for years. Then, seemingly out of nowhere, defects can arise. We once had a part which we put a little embossed bubble into it. No problem for years. Then all of the sudden, cracking. Testing, certs, etc. showed no issues. We eventually found out that there may have been an issue when the mill annealed the material -- it may have gotten stuck in the furnace for an extended time. Good luck.
 
S

silentrunning

#15
Update on Hydrogen Embrittlement

We have finally solved our problem with breaking parts and as is often the case, there was not a single Root Cause. The main culprit did however turn out to be process change. The customer had requested that we go with a NADCAP heat treater instead of the company we had been using for several years. This started the problem. The customer print did not call out any method for the heat treat, only the final Rockwell. The new heat treater used a quench and draw method and the Rockwell came out within range. The parts however had a lot of scale on them when they were finished. The scale caused the plater to have to leave the parts in the acid for a longer time. After much investigation we went back to the old heat treater and found that he was Austempering the parts when he did them for us. This resulted in a much cleaner finished product as well as it being less prone to Hydrogen Embrittlement. We have had two lots heated by the old heat treater and then plated by the same plater. After testing parts from both lots under load for 24 hours we have had no failure. Now I have to study up on heat treating so I can write a factual Corrective Action.
 

Golfman25

Trusted Information Resource
#16
Re: Update on Hydrogen Embrittlement

We have finally solved our problem with breaking parts and as is often the case, there was not a single Root Cause. The main culprit did however turn out to be process change. The customer had requested that we go with a NADCAP heat treater instead of the company we had been using for several years. This started the problem. The customer print did not call out any method for the heat treat, only the final Rockwell. The new heat treater used a quench and draw method and the Rockwell came out within range. The parts however had a lot of scale on them when they were finished. The scale caused the plater to have to leave the parts in the acid for a longer time. After much investigation we went back to the old heat treater and found that he was Austempering the parts when he did them for us. This resulted in a much cleaner finished product as well as it being less prone to Hydrogen Embrittlement. We have had two lots heated by the old heat treater and then plated by the same plater. After testing parts from both lots under load for 24 hours we have had no failure. Now I have to study up on heat treating so I can write a factual Corrective Action.
Root cause was the customer's request. :)
 
D

DRAMMAN

#18
Re: Update on Hydrogen Embrittlement

Now you nee dot ask yourself how do you go about qualifying changes. Even though it was a customer request, a change like this should go through an approval evaluation.
 
S

silentrunning

#19
Dramman, right you are. Now I have to do a technical Corrective Action to satisfy the customer and also an Internal Corrective Action because I failed to validate a process in accordance with 7.5.2. :frust:
 
D

DRAMMAN

#20
I have dealt with hydrogen embritlement a few times. It was always a mystery as everyone always states the process did not change. I never thought to look at material processing or heat treating changes making the materal more susecptible to HE. We woudld always focus in on the post plate baking process. That whole 3-4hrs is a widely used rule of thumb. I always wonde where it came from and how it can possibly apply to everything.
 
Thread starter Similar threads Forum Replies Date
F Spring Steel Wires - JIS 3560, DIN 17223 & SAE 9254 (JIS G 3561) Manufacturing and Related Processes 2
T Loaded spring device - Active medical device? EU Medical Device Regulations 1
P RAC-US Spring 2020 Study group_Discussions Professional Certifications and Degrees 19
D Compression Spring Force MSA Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 5
Marc Daylight Savings time (US) - Spring (ahead) - Sunday March 10, 2019 Coffee Break and Water Cooler Discussions 1
R Canada classification of spring-driven autoinjector Canada Medical Device Regulations 2
W RAC EU/Global focus certification - Study Group for Spring 2015 Professional Certifications and Degrees 4
R Compression Spring Force measurement correlation with Supplier Capability, Accuracy and Stability - Processes, Machines, etc. 7
C Suggestions for the RAC Regulatory Affairs Spring 2014 - US exam Professional Certifications and Degrees 1
D RAC Regulatory Affairs Spring 2014 EU or Global Exam Study Group Professional Certifications and Degrees 15
R RAPS Certification Exam Prep Study Group for Spring 2014 Professional Certifications and Degrees 2
P RAC (Regulatory Affairs Certification) US Spring 2013 Preparation Study Group Professional Certifications and Degrees 3
K Poka Yoke for Leaf Spring placement by Operator Misc. Quality Assurance and Business Systems Related Topics 2
Jim Wynne Baseball Opening Day--A Sure Sign Of Spring Coffee Break and Water Cooler Discussions 3
N Preparation time for the 'spring' RAC Exam - sufficient time? Professional Certifications and Degrees 1
Marc Holi (होली ) - The Festival of Colours - Hindu spring festival - 2010 Coffee Break and Water Cooler Discussions 2
M AS9100 - Easier Than TS16949? Spring & Pressing company AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
Scott Catron Disneyland for Spring Break Coffee Break and Water Cooler Discussions 24
Q Early Spring Cleaning - Finding Old Documents and Specifications ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
ScottK Is anyone here from North Jersey going to the Spring ASQ Conference (4/19)? Training - Internal, External, Online and Distance Learning 1
L Spring measurement device - Measuring the torque of the spings at diferent angles General Measurement Device and Calibration Topics 1
GStough 2007 Spring Conference in St. Louis (ASQ) General Auditing Discussions 4
R SPC in Spring Brakes - Measuring Angles - What do I need to do? Statistical Analysis Tools, Techniques and SPC 14
Moumen H Variations between ASTM A29 Standard for steel bars and Mill test certificates specs Manufacturing and Related Processes 1
E Record Retention - Raw Material (Steel Certs) Records and Data - Quality, Legal and Other Evidence 3
S What are the International Forging Requirements for Nitrogen Strengthened Stainless Steel? EU Medical Device Regulations 3
G National Structural Steel Specification 7th Edition - Do I now have to be audited against ISO 3843-3 as well as ISO 9001? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
H Difference between Stainless Steel 316 ASTM F899 and ASTM A276 Other Medical Device Related Standards 3
Ron Rompen 2D matrix issue - Parts (machined steel) returned from the customer Design and Development of Products and Processes 0
Manix Supplied Steel Material Testing Norms and Requirements Supplier Quality Assurance and other Supplier Issues 1
M Identifying Technologies for Non Destructive Examination of steel brazed joints Inspection, Prints (Drawings), Testing, Sampling and Related Topics 1
P Gas Nitriding Surface Hardening of Stainless Steel 304 ISO 13485:2016 - Medical Device Quality Management Systems 4
B AS NZS 5131 - Procedure on Concessions with focus on Steel Fabrication Document Control Systems, Procedures, Forms and Templates 1
G Heat Number on CofC - Stainless steel tube Manufacturing and Related Processes 2
R Tapping problems - 3/8" hot roll pickled & oiled steel - seeking expertise Manufacturing and Related Processes 15
K California's Proposition 65 - Solvent and Stainless Steel Alloy questions RoHS, REACH, ELV, IMDS and Restricted Substances 11
O MSA Study for a steel ruler Manufacturing and Related Processes 6
N Do I need to approach galvanized steel sheet flatness issue with DOE? Problem Solving, Root Cause Fault and Failure Analysis 9
hogheavenfarm Kobe Steel material data falsification Misc. Quality Assurance and Business Systems Related Topics 15
R Sourcing steel plate material to J403 Grade 1010 - 1022 Supplier Quality Assurance and other Supplier Issues 1
Ron Rompen Help with Corrosion (Humidity) Testing Procedure - Sintered Metal Steel Parts Manufacturing and Related Processes 9
C DFAR 252.225-7008 - Is aluminum, say T6061, considered specialty metal (i) steel? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
V Ultrasonic NDT on CNC Product made of Stainless Steel General Measurement Device and Calibration Topics 2
S Use of SS304 in place of SS301 (Stainless Steel) Nonconformance and Corrective Action 4
L Large sand steel casting discontinuities Manufacturing and Related Processes 8
D Definition Resquared Sheets of Steel - Definition Definitions, Acronyms, Abbreviations and Interpretations Listed Alphabetically 3
M ASTM Stainless Steel Density Table Various Other Specifications, Standards, and related Requirements 1
M Micrometer Anvil Placement to measure the diameter of Steel Wires Measurement Uncertainty (MU) 6
W Japanese Steel Specifications - A material called HNCM220M Manufacturing and Related Processes 1
H Stainless Steel Surface Quality for Ophthalmic Surgical Device Other Medical Device Related Standards 11

Similar threads

Top Bottom