Randy,

At least with the registrar I work with, it has been determined that at least part of the stage one audit must be performed on site. At least that is their intrepretation and approach.
You are correct Jim - (see my post too about it being done on site).

Harry's also got a good point. As a CB auditor in the UK we always did the 'document review' on site. It was way more than just that, and was just like the stage 1 today.

I believe it was the logistics and costs of doing that here in the USA, especially in the early days of CB operations (most were east coast centric), that forced such an effective practice to stop. Many companies see only a cost of doing business with a CB - often simply to get a certificate and didn't want to pay for the expenses.

Today, with so much of the USA covered (we have assessors in over 25 states) most of the country is accessible easily and (relatively) less expensively........
 
Elsmar Forum Sponsor

Randy

Super Moderator
#12
Yeah, I've yet to do a Stage 1 off site for my employer as well and 17021 is going to be a bit more demanding than Guide 62 & 66
 

Helmut Jilling

Auditor / Consultant
#13
Re: Stage 1 audit for ISO 9001

...This "new" Stage 1 & Stage 2 approach isn't new at all (at least to Registrars), it has been going on for 12 years or more since ISO 14001 came out and OHSAS 18001 is audited that way as well.

...

TS-16949 requires it as well. It was inevitable that it would filter to ISO 9001.
 

Anerol C

Trusted Information Resource
#14
If I will have a stage 1 audit and I still have some procedures in approval that may not be realease before the audit. May I show them as in "approval" procedures?

Please advise,
 
J

joshua_sx1

#15
...well, procedures that are not approved cannot be used as basis for auditing – that is for sure… you can show to the auditor even in their “for approval” status, but then again, the auditor might ask the approved ones…

…better for you to approve the current one you have now, and tell to auditor that you have another proposed revision that is being reviewed…

…with this approach, the auditor “might” give you a minor or even observation category in case he found nonconformance…

(I added “might” since it is not a 100% sure… but for me, as an auditor, I usually give a lighter category for nonconformance that is acknowledged by the organization specially if the correction / corrective action is on the way…)
 
A

amanbhai

#16
Yeah, I've yet to do a Stage 1 off site for my employer as well and 17021 is going to be a bit more demanding than Guide 62 & 66
I know it is recently issued but What exactly is the date of issue of ISO 17021?:thanks:
 
A

Al Hector

#17
I think that ISO 17021 was published on 15 September 2006, but there was 2 year allowed to the CB for transition(to obtain the accreditation).

Alin
 

Big Jim

Super Moderator
#18
The full title is ISO 17021:2006 so that should give you a clue that it was released in 2006. The old Guide 62 was given a sunset (would no longer be recognized) of September 15, 2008, so that may also be a clue as to the actual release date.
 
J

Jon-uk

#19
Re: Stage 1 audit for ISO 9001

Are non conformance raised during stage 1 audit? I think so. Could any body provide some of your nonconformances found during stage 1 audit?

Thanks:thanx:
as the certification hasn't yet been awarded then no 'non-conformances' can be raised. What i raise during a stage 1 is improvement requests. These are generally related to documetation required by the standard or required by the companies QMS to show conformance to the standard which is missing, in appropriate or would not provide the required evidence of conformity.
In its most basic terms consider a stage 1 assement as a gap analysis of the companies QMS and a review of the allocated EAC code and review of the audit days that will be required for surveillance auditing once the certification has been awarded - but this should not be mistaken for the stage 2 audit wich is the formal certification audit.
 
#20
Re: Stage 1 audit for ISO 9001

as the certification hasn't yet been awarded then no 'non-conformances' can be raised.
I'm not sure that it's a universal truth! A non-conformance can be issued as a result of reviewing the QMS, can't it? If the client doesn't have something which the ISO 9001 (or other standard) says they 'shall' have, that's a non-conformance, isn't it? Certification certainly doesn't have to be awarded before any non-conformances are issued!

A stage 1 audit is performed to determine a number of things, all listed in ISO/IEC 17021 and is certainly not limited to documentation. Also, while the number of days for surveillance might be considered, the need for an appropriate amount of time for the actual stage 2 is more important, at this stage, don't you agree?
 
Thread starter Similar threads Forum Replies Date
S Is a Stage 1 Audit required for ISO 50001 Certification? Sustainability, Green Initiatives and Ecology 1
D ISO/TS 16949 Stage 2 Audit Nonconformance Against 7.6.3.1 Laboratory Scope IATF 16949 - Automotive Quality Systems Standard 8
C Contract Manufacturer and Stage 2 Audit for ISO 13485 ISO 13485:2016 - Medical Device Quality Management Systems 5
L Is a Gauge R&R Study needed for ISO 9001 Stage 1 Audit? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
T ISO 22000 Stage 1 Audit Completed Successfully Other ISO and International Standards and European Regulations 4
J What to expect during Stage 1 and Stage 2 audits - Certification Audit ISO 9001:2008 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
M ISO/TS 16949 Stage 2 Audit Tips General Auditing Discussions 4
S We just Passed our ISO 14001 Stage 2 Audit! Miscellaneous Environmental Standards and EMS Related Discussions 17
Dean Bell Implementation of Controls as per SOA for Stage 2 Audit IEC 27001 - Information Security Management Systems (ISMS) 0
L Stage 2 audit - Requirement for 3 months of records ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
O ISO13485 implementation - Are internal audits expected before stage 1 audit? Design and Development of Products and Processes 3
Jacquie Collins Stage 2 Audit ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
R What happens during a Stage 1 MDSAP audit? ISO 13485:2016 - Medical Device Quality Management Systems 4
A A purpose of a Stage 1 audit - Off site document review Registrars and Notified Bodies 3
W Closing of Stage 2 Audit Nonconformances AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
E Interesting Discussion Was this the fastest ever stage 2 ISO9001:2015 audit? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 76
Q Stage 1 audit observations - documented report? General Auditing Discussions 5
K AS9100 - No NCR's or CA's during Stage 2 Audit AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 8
S We had our Stage 2 Audit on 2/19 & 2/20.... AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
J Major Nonconformance on Stage 2 Audit causes to start over Stage 1? IATF 16949 - Automotive Quality Systems Standard 2
N AS9110 Audit Stage 2 - What procedures are required? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
S Root Cause - Left 5.6.2 paragraph (f) out of Quality Manual during Stage 1 Audit Nonconformance and Corrective Action 21
M What to do during a Stage 1 External Audit? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 8
B Certification Body insist on evidence of Preventive Action during Stage 2 audit ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
M Implementing an AS9100 Quality System - Stage 1 Audit for AS9100 is Oct 2012 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 22
K Internal Audits - Necessary before Stage 1 Audit? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 42
J Waiting for an Auditor after our AS9100 Stage Two Audit AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 19
K Stage 1 Audit Advice for a new Lead Auditor General Auditing Discussions 5
J AS9100 Rev.B Registrar Audit Plan for Stage 2 Audits AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
A Questions that auditor may ask during the certification or 2nd stage audit. ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 15
P Peer Review prior to Stage 2 Audit - Acceptable or Not? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 25
P NC from TS16949 stage 2 audit - Internal Auditing - Auditor did not record evidence General Auditing Discussions 15
B Is it Compulsory to complete Management Review before Stage 1 Audit? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 22
D At what stage should we proceed with manufacturing process audit? General Auditing Discussions 6
D What is the TS 16949 Stage 1 Audit Requirement on Internal Audit? Internal Auditing 16
W TS 16949 Audit - Examples of Major & Minor NC's and Observations for Stage 1&2 audit. IATF 16949 - Automotive Quality Systems Standard 11
M Readiness Review Failed - Stage one audit for TS16949 IATF 16949 - Automotive Quality Systems Standard 7
L We succeeded in our stage 1 audit this afternoon! IATF 16949 - Automotive Quality Systems Standard 2
S TS 16949 Stage 2 Audit Preparedness - Need Advice General Auditing Discussions 5
A Non-conformance logged following a TS16949 Stage 2 audit - APQP Control Plan IATF 16949 - Automotive Quality Systems Standard 15
L Stage One Audit vs. Document Review - TS16949 - Need clarification IATF 16949 - Automotive Quality Systems Standard 5
P TS 16949 Audit - Stage 1 passed! IATF 16949 - Automotive Quality Systems Standard 29
B Stage 1 - Adequacy Audit (pre-assessment) - University - What do they look for? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
O ISO 13485 - Is management review required before stage 1? ISO 13485:2016 - Medical Device Quality Management Systems 6
I QMS documents required at each stage of Software development IEC 62304 - Medical Device Software Life Cycle Processes 5
A Doubt on multiple inspection carrying out for same balloon number during Stage Inspection and Final Inspection? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
A Determining the Scope of the QMS during Stage 1? Registrars and Notified Bodies 11
Y Application of IEC/EN 62304 at an advanced stage of software development IEC 62304 - Medical Device Software Life Cycle Processes 4
K MDSAP Stage 1 Guidance Documents ISO 13485:2016 - Medical Device Quality Management Systems 1
N Non-conformances whilst in the Design and Development stage of a project ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 8

Similar threads

Top Bottom