G
Hi all
I need some advice.
I am having a new director who recently joined our company - and the first KPI that he want our Mfg waste target to be at Zero. No make-up or re-issue material if there is any defect found in process.
I am stuck with this target "Zero" waste KPI.
Perhaps I am too inexperienced to argue.
Is it possible to set the waste target "Zero" in Mfg ?
I have to come out with a realistic plan & I have no clue how to bring down the waste to zero.
And worst, this has become my performance KPI.
Hope some expert can help.
Thanks.
I need some advice.
I am having a new director who recently joined our company - and the first KPI that he want our Mfg waste target to be at Zero. No make-up or re-issue material if there is any defect found in process.
I am stuck with this target "Zero" waste KPI.
Perhaps I am too inexperienced to argue.
Is it possible to set the waste target "Zero" in Mfg ?
I have to come out with a realistic plan & I have no clue how to bring down the waste to zero.
And worst, this has become my performance KPI.
Hope some expert can help.
Thanks.
