Stuck with Zero Defect target - Manufacturing Waste Target is Zero

G

goallout - 2009

#1
Hi all
I need some advice.
I am having a new director who recently joined our company - and the first KPI that he want our Mfg waste target to be at Zero. No make-up or re-issue material if there is any defect found in process.
I am stuck with this target "Zero" waste KPI.
Perhaps I am too inexperienced to argue.
Is it possible to set the waste target "Zero" in Mfg ?
I have to come out with a realistic plan & I have no clue how to bring down the waste to zero.
And worst, this has become my performance KPI.
Hope some expert can help.

Thanks.
 
Elsmar Forum Sponsor

Ajit Basrur

Staff member
Admin
#2
Re: Stuck with Zero Defect target

Hi all
I need some advice.
I am having a new director who recently joined our company - and the first KPI that he want our Mfg waste target to be at Zero. No make-up or re-issue material if there is any defect found in process.
I am stuck with this target "Zero" waste KPI.
Perhaps I am too inexperienced to argue.
Is it possible to set the waste target "Zero" in Mfg ?
I have to come out with a realistic plan & I have no clue how to bring down the waste to zero.
And worst, this has become my performance KPI.
Hope some expert can help.

Thanks.
May be he is in the "Dream World" - remind him that we stay on Earth. ;)
 
G

Gert Sorensen

#3
As always, I agree with Qualityalways. :D
I have yet to see an outfit where zero waste (I interpret that as no defects/faults) is realistic. It is realistic to reduce faults and thereby waste but how to do it is an individual call from company to company... In this, as in all other matters, it is crucial to get top management to commit to the project in public. Try not to accept it as a KPI for you specifically, try to get it to be a company KPI, and try to get a percentage reduction instead, i.e. 10% reduction per year or so. :bigwave:
 
D

Duke Okes

#4
It's better to reach for the stars and not quite reach them than to just reach for the top of the next fence and end up taking the easy path in life.
 

Jen Kirley

Quality and Auditing Expert
Staff member
Admin
#5
Well goallout, it is possible to have a zero defect goal. Achieving it is something else.

Crosby's "Quality is Free" is a good book. However, I'm told it's somewhat misunderstood because it's entirely possible to spend too much on improving quality.

Case in point is the Department of Defense initiative that is talked about in Zero Defects lore. The missiles did end up with almost no defects, but I understand there was a good deal of inspection and rework.

Now I don't want to deny your director his dreams, but let's bring them into context, shall we? He can strive for zero defects, but he won't get them tomorrow, or the next day. I do not know what stands in your way, but I do know that trying to change too many things at once can render negative effects.

In this thread there is a quality cost calculator, plus a link to a thread that has my own calculator. You might consider using them to plan some incremental changes toward a zero defect goal (whether or not you ever get to zero defects is almost besides the point, which is improvement) and presenting your plans to Mr. Director. Alternatively you can show how costly the efforts to achieve zero defects would be, and/or how long it would take to recoup ROI. http://elsmar.com/Forums/showthread.php?t=9226&highlight=Quality+cost+calculator

In cases of unreasonable expectations I sometimes find it helpful to give the person a choice or two. Since he's the Director he gets the chance to view data in order to make a good decision. I hope he does!
 

harry

Super Moderator
#6
Hi Goallout,

I gathered from some previous posts that you are in the printing industry. Depending on the internal standards or requirements you set for yourself, it's quite possible to achieve zero defects - but at a cost!

Some of the common problems faced such as misalignment of overlapping colours and/or paging, mistakes in layout, wordings, pictures etc, layout mismatch etc. can be solved by several methods:

Technology - new machines, computerised systems, intelligent systems etc

Validation (actually checking) - at critical stages and with frequent (tighter inspection)

Proof-reading (also a form of checking) - by more people because experience shows that nobody can do a 100% job and going through another round by the same person will not 'catch' certain mistakes..

All these boils down to one thing - cost. If you are experience enough, just let him have a list of items/equipment to upgrade and the associated cost and let him make the decision. And don't forget that new and sophisticated equipment need equally sophisticated operators.

Right now in my country, there are also many small printers using 10-20 year old technologies. Do they have a choice? No! because at the lower end of the market, margin is thin. They can only work their guts out, hoping to accumulate enough money for newer technologies so that they can move out of that market segment. Many in this segment embraced ISO 9001 as a tool to enhance their competitiveness.
 
G

goallout - 2009

#7
Hi all

First, many thanks to all those who reply me.
- For Qualityalways, I like when u stated it is almost a "dreamworld".
- For Gert Soresen, - we have that in Company KPI, but it is also my dept KPI measurement for my performance. That's something I can't get over. Is almost mission impossible !
- For Jennifer Kirley- thanks for highlighting there is still a way out & I certainly will look at the "ost-calculator" to see how I can come out a plan to achieve it
- For Harry - I can agree with u that in my industry (printing) - the variable is many. Setup, material consition, ink, skills, equipments etc ... but in realistic - how many company can jump into huge investment on high tech machinery ? As u said, even with that - there is still some variable (skills, m/c tolerance, cost margin etc.. ) - to be considered.

Anyway, our Mr.Director is tough - as this is also his performance KPI measurement from the CEO to him. So u see - it goes top down.
I hope I can have some tips or examples on how to plan the path to achieve this zero waste. (& it must be realistic & workable)

thanks
 

harry

Super Moderator
#8
So, what do you intend to do in the interim? I think setting up a QMS based on ISO 9001 as a 'stop-gap' measure is a good idea based of the fact that printing industry traditionally employ less technically qualified people.

Also bear in mind that your Director is not really that 'stupid'. As another poster put it - aim for the stars, even if you fail, you still get to the moon. Unless somebody has plenty of '$' to splurge, incremental improvement is the way to go!

Therefore, if you have no choice and the Director insist, you can have zero defects as a 'long term' goal (when it will be achieved is not important right now). In the mean time, institute continuous improvement plans.

Good luck.
 

Ajit Basrur

Staff member
Admin
#9
Therefore, if you have no choice and the Director insist, you can have zero defects as a 'long term' goal (when it will be achieved is not important right now). In the mean time, institute continuous improvement plans.

Good luck.
Harry, very rightly said

Goalout - pls get back if u need help. Additionally, if you tasted some success, let us know.
 
Thread starter Similar threads Forum Replies Date
qualprod What tier number fits in a company producing paper labels stuck on automotive parts? IATF 16949 - Automotive Quality Systems Standard 7
A Stuck at 'Analyse' stage of DMAIC Improvement Cycle on Cosmetic Specification Manufacturing and Related Processes 10
A Getting Stuck Choosing a Sampling Plan Inspection, Prints (Drawings), Testing, Sampling and Related Topics 6
A PFMEA for an Assembly Process - Stuck in first steps FMEA and Control Plans 6
F Our container of pleasure toys is stuck... regulated as "medical devices" by FDA ? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 19
D Stuck in the middle of ISO 9001:2008 Implementation ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 31
J PDCA Cycle - Stuck at D, D, D, D, D... Quality Manager and Management Related Issues 20
A Stuck with Due date as a KPI - Services like evaluation studies ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 0
K Am I the only one stuck working on the 24th Coffee Break and Water Cooler Discussions 39
Jen Kirley Stuck in the eBay help desk spider web! Service Industry Specific Topics 13
Marc 13 Dec 2007 - Stuck in Boston Coffee Break and Water Cooler Discussions 21
Randy ISO 14001 Implementation Schedule - I doing a proposal and I'm stuck! Miscellaneous Environmental Standards and EMS Related Discussions 18
normhowe "The Problem with Quality Management: Process orientation, controllability and zero-defect processes as modern myths" Book, Video, Blog and Web Site Reviews and Recommendations 2
E Zero part to part variation - Gage R&R project Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 15
P ISO 9001 certification with zero customers? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 11
D Certifying a "virtual" company with zero employees ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 11
Sam Lazzara Time Zero testing in med device aging studies Qualification and Validation (including 21 CFR Part 11) 3
C Are zero defect sampling plans relevant to AS9120B Distributor AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
M Zero Defect Sampling Plan Standards Inspection, Prints (Drawings), Testing, Sampling and Related Topics 4
B IATF 16949 Cl. 8.6.6 - Acceptance Criteria - Zero Defects Attribute Data Sampling IATF 16949 - Automotive Quality Systems Standard 2
WCHorn Changing Sampling Accept Number to Zero, Arbitrarily AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 15
F Zero to certification in 6 months! Covegratulations 5
C ISO 9001:2008 Audit Major Finding - Dial Calipers not set to zero ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 16
R Can Cp and Cpk be zero? Capability, Accuracy and Stability - Processes, Machines, etc. 10
W Zero setting of correlation graph when plotting best fit linear regression Statistical Analysis Tools, Techniques and SPC 7
M Zero Tolerancing on True Position using MMC (Maximum Material Condition) Inspection, Prints (Drawings), Testing, Sampling and Related Topics 6
P Rounding Uncertainty to Zero on a Calibration Certificate Measurement Uncertainty (MU) 7
S Justifying the AQL for a Zero (C=0) Acceptance Plan (Medical Device) AQL - Acceptable Quality Level 6
L What is the Cpk for Zero Defects Six Sigma 4
optomist1 Differences and Advantages of using a Zero Positional Tolerance at MMC Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
S Getting Zero for GR&R Reproducibility? Using Minitab Software 5
V C=0 Zero Acceptance Number Sampling Plan - Question Inspection, Prints (Drawings), Testing, Sampling and Related Topics 2
R Zero Acceptance Sampling Plans 5th edition by Squeglia - Question Inspection, Prints (Drawings), Testing, Sampling and Related Topics 1
M Zero Acceptance Number Sampling Plans for Isolated Lots Inspection, Prints (Drawings), Testing, Sampling and Related Topics 6
P Minitab error: Zero or negative degrees of freedom Using Minitab Software 16
T Zero Failure Sampling Plans Inspection, Prints (Drawings), Testing, Sampling and Related Topics 2
M AQL (Acceptable Quality Level) for Zero Defects AQL - Acceptable Quality Level 13
C Can you change all your WI (Work Instruction) revisions back to zero (0) ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 11
S Is "Zero Accidents" a realistic goal? Occupational Health & Safety Management Standards 101
Chennaiite High Technology Visual Inspection for Casting and Forging Parts - Zero Defects Inspection, Prints (Drawings), Testing, Sampling and Related Topics 11
M Cpk with LSL (Lower Specification Limit) at zero? Statistical Analysis Tools, Techniques and SPC 3
Q Zero-Based Sampling Plan - Governing document or main reference document Inspection, Prints (Drawings), Testing, Sampling and Related Topics 2
P Zero Acceptance Number Sampling Plans, Fifth Edition (e-Book) Inspection, Prints (Drawings), Testing, Sampling and Related Topics 2
K Design of Lot Acceptance Sampling Plan - Zero Acceptance Number Sampling Plans Inspection, Prints (Drawings), Testing, Sampling and Related Topics 27
P Definition S-type Tolerance - Unilateral tolerance where the desired value is 0 (zero) Definitions, Acronyms, Abbreviations and Interpretations Listed Alphabetically 3
C AV equals Zero in Minitab - MSA with 2 Appraisers Using Minitab Software 11
U Zero findings!!!!!!!!!!! First visit back since our registration audit ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
I R-sq Value is Almost Zero - Linearity Study Question Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 1
D What does Zero Defects mean? TS 16949 Clause 7.1.2 AQL - Acceptable Quality Level 6
Y What is the confidence level for a given AQL in zero sampling plan AQL - Acceptable Quality Level 4

Similar threads