Definition Technical Work Instruction vs. Method Statement - Differences

A

AdamEve

#1
Hi there,

I just need to differentiate the two terms, TECHNICAL WORK INSTRUCTION and METHOD STATEMENT.

However it is being used in your inductry, whatever is the technical meaning of both, I will appreciate your comments and or any discussion out of it.

Thanks.
 
Elsmar Forum Sponsor

Jim Wynne

Staff member
Admin
#2
Re: Difference between TECHNICAL WORK INSTRUCTION & METHOD STATEMENT

Welcome to the Cove. :bigwave:

If you could tell us the context in which those terms are used it would be helpful. I think we probably all understand what a technical work instruction might be, but the term "method statement" isn't as familiar.
 
A

AdamEve

#3
Re: Difference between TECHNICAL WORK INSTRUCTION & METHOD STATEMENT

Method Statement - in so far as my usage of the term is as such like this. The client ask for a Method Statement on how to complete the first phase of the project. The first phase of the project is to erect the frist three floors of the building out of the 10 storey building. So we might need to mention the equipments needed, the manpower required, etc.

My real problem is to differentiate the two terms, which bugging me whether these two is almost the same or it might be having some technical difference.

Thanks in advance for any replies.

Have a nice day.
 
A

AdamEve

#4
Re: Difference between TECHNICAL WORK INSTRUCTION & METHOD STATEMENT

My understanding of the Technical Work Instruction, is that it is a "detailed" step-by-step instruction wherein the operator or the end-user might refer to it from time to time in order to efficiently perform his daily task.

I hope you can give more better meaning and ideas.

Thanks again.
 

harry

Super Moderator
#5
Re: Difference between TECHNICAL WORK INSTRUCTION & METHOD STATEMENT

Method Statement - in so far as my usage of the term is as such like this. The client ask for a Method Statement on how to complete the first phase of the project. The first phase of the project is to erect the frist three floors of the building out of the 10 storey building. So we might need to mention the equipments needed, the manpower required, etc. ....................
Yes, that is how it is generally used in the construction/project environment.

I supposed you can say that method statements are general descriptions of how the work will be carried out - the purpose is for the consultant/supervision team to have a general idea of how you are going to handle the project.

Work instructions are details which are generally used in house to guide your construction and/or operations team.
 
K

kgott

#6
Hi there,

I just need to differentiate the two terms, TECHNICAL WORK INSTRUCTION and METHOD STATEMENT.

However it is being used in your inductry, whatever is the technical meaning of both, I will appreciate your comments and or any discussion out of it.

Thanks.
In my opinion and experience, method statements come from safety and intended to describe how the job will be done. These days they have given way to Job Hazard Anaylsis (JHAs)

In my opinion and experience, a work instruction is a detailed procedure that describes how to do a sub part of description of how the process works.

In a sense they are the same but they come from different parts of management, ie the silo approach.

To summarise, one is a high level version of the 'this is how the work is done' while the other is 'this is how to do this part of the work.'
 
Thread starter Similar threads Forum Replies Date
K Technical file for mhra CE Marking (Conformité Européene) / CB Scheme 2
H MD Technical Documentation and SALES possibility EU Medical Device Regulations 0
O Soft and technical skills for a VP of Quality Career and Occupation Discussions 1
A CE-IVD Technical File with Multiple IFUs EU Medical Device Regulations 4
A DMDIV-Variants : definition and technical documentation CE Marking (Conformité Européene) / CB Scheme 4
M Office and manufacturing site relocation effect on Device Technical File CE Marking (Conformité Européene) / CB Scheme 2
R MDR & depth of technical files review by NB's EU Medical Device Regulations 18
J Saudi Arabia Technical File Requirements Other Medical Device Regulations World-Wide 1
P MDR/IVDR Annex III - Technical documentation on PMS EU Medical Device Regulations 1
DuncanGibbons Technical Data Package vs Digital Product Definition APQP and PPAP 0
D Hospital Decontamination and the MDR - Technical Files, UDI and PMS EU Medical Device Regulations 3
F Software as a Medical Device (SaMD) Technical File Requirements Manufacturing and Related Processes 3
S Technical File for Surgical Mask in Class 1 MDD Elsmar Cove Forum ToS and Forum Policies 1
A Technical File - Updating Applied Standards EU Medical Device Regulations 4
M What to be careful about/focus on when doing a Technical File review EU Medical Device Regulations 4
Watchcat Anyone had an MDR technical file review/audit yet? EU Medical Device Regulations 13
G Same intended use devices - Technical file EU Medical Device Regulations 5
I Maintaining Technical Documentation under MDD and MDR EU Medical Device Regulations 1
M Basic UDI and technical documentation EU Medical Device Regulations 1
B Clause 5.1.12 of Technical Standard IEC 62304/A1 IEC 62304 - Medical Device Software Life Cycle Processes 5
V Iso13485 certification vs CE technical audit ISO 13485:2016 - Medical Device Quality Management Systems 3
F Management of Software version while NB reviews Technical file CE Marking (Conformité Européene) / CB Scheme 7
D Risk Analysis & Technical File - What detail goes in the Risk Management Report ISO 14971 - Medical Device Risk Management 5
F Recommended practice for furnishing Technical Procedures ISO 17025 related Discussions 1
S How to find technical specification for facilities maintainance ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
L Special Processes - Technical reason concerning torque - Anaerobic compounds Manufacturing and Related Processes 10
N Technical file requirements class 1 device MDR Other Medical Device Regulations World-Wide 6
R Implementing Design History Documents/ Technical Documents in the QMS ISO 13485:2016 - Medical Device Quality Management Systems 3
T Change in BRH (Brazilian Registration Holder) Technical Manager Other Medical Device Regulations World-Wide 2
C Maintenance of Product Technical Documentation EU Medical Device Regulations 3
O Medical Device Technical File Confidentiality - On site reviews EU Medical Device Regulations 14
N How to Write and Compile a Technical File for CE Marking CE Marking (Conformité Européene) / CB Scheme 4
N Technical File Reviewer has requested more testing to ISO 10993 Other Medical Device Related Standards 10
M Informational USFDA draft guidance – Technical Performance Assessment of Quantitative Imaging in Device Premarket Submissions Medical Device and FDA Regulations and Standards News 0
M Informational USFDA draft guidance – Technical Considerations for Non- Clinical Assessment of Medical Devices containing Nitinol Medical Device and FDA Regulations and Standards News 0
C Access to Technical Documentation - MDR Chapter VI Article 61 EU Medical Device Regulations 4
M Technical File (STED) labelling - When you compile tech files do we have to include all the product labels? EU Medical Device Regulations 2
M Informational IMDRF final document – Assembly and Technical Guide for IMDRF Table of Contents Submissions Medical Device and FDA Regulations and Standards News 4
N EU MDR Basic UDI-DI and Technical Documentation for Systems EU Medical Device Regulations 22
M Medical Devices and ASD-STE100 (Simplified Technical English) Other Medical Device Related Standards 0
B IATF 16949:2016 – Technical Specification (eBook edition) IATF 16949 - Automotive Quality Systems Standard 1
S MDR Technical File Structure Requirements EU Medical Device Regulations 12
L 510k exemption process - Do you still need to submit technical dossier? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 5
D MDD to MDR - Technical File conversion EU Medical Device Regulations 4
J Connection between Technical File and Declaration of Conformity CE Marking (Conformité Européene) / CB Scheme 2
I MDD Class I software technical documentation sample EU Medical Device Regulations 2
M Annex II - Technical Documentation. V&V, Performance and Safety EU Medical Device Regulations 3
T Technical File Review - Transfer to a new NB EU Medical Device Regulations 3
J Brazil - Submitting Technical Files Other Medical Device Regulations World-Wide 2
A CTD (Common Technical Document) for a Topical Preparation Pharmaceuticals (21 CFR Part 210, 21 CFR Part 211 and related Regulations) 2

Similar threads

Top Bottom