Temporary Change of Process Controls - IATF 16949 Clause 8.5.5.1.1

T

tongxiaozhi

#1
What's the purpose of 8.5.5.1.1: temporary change of process controls? What shall I do to meet the requirements?

What if our process is quite stable and there is no alternate process?

thanks in advance
 
Elsmar Forum Sponsor
#3
Hi there,

I think that it like a contingency plan for control plan because you can't sure whether your equipment is suddenly broken down in the future or not.
For us, we included it into 4M change procedure.
 
B

Blaest

#4
That must be clause 8.5.6.1.1

As I see it the procedure for 'alterntive control methods' shall be activated based on the risk analysis (such as FMEA) - from the FMEA you have the Control Plan which is the outcome of the risk analysis.

The logic (as I see it) here would be that from every line/check in the Control plan there shall be an alternative control method.

This was also the clear message I got from the SMMT Industry Forum trainer.
No, I do not like the sound of this message either.
 

Ajay Akole

Involved In Discussions
#5
What's the purpose of 8.5.5.1.1: temporary change of process controls? What shall I do to meet the requirements?

What if our process is quite stable and there is no alternate process?

thanks in advance
I think that clause no 8.5.6.1.1 gives requirement about process control means inspection, measuring, test, and error-proofing devices, that includes the primary process control. And not about the process.
 

Pieht

Registered
#6
Ok, I hope someone sees and reads this...and can help.

I am dealing with an auditing-company (in Germany) that believes that "process controls" includes all machinery.
So...CNC milling cutters, drills, grinding machines.
I, on the other hand, understood "Process controls" to be things, that make me see if my process is "ok". So as listet here numerous times: inspection, measuring, tests, error-proofing devices.

So...what is it?
Measuring-Devices of all possible sorts?
Or the above AND "Everything" that can influence the process??

I would really really appreciate an answer to this, because as it is, we do not know what to do.
Thanks in Advance,

Peter
 

Golfman25

Trusted Information Resource
#7
I would take a narrow view and state that it means what is in that particular column of your control plan. So if you use inspection as a control, then all the gagues that makes that up. If you use a machine setting/CNC etc. as control, then that control/software, etc. Good luck.
 

morteza

Trusted Information Resource
#8
Ok, I hope someone sees and reads this...and can help.

I am dealing with an auditing-company (in Germany) that believes that "process controls" includes all machinery.
So...CNC milling cutters, drills, grinding machines.
I, on the other hand, understood "Process controls" to be things, that make me see if my process is "ok". So as listet here numerous times: inspection, measuring, tests, error-proofing devices.

So...what is it?
Measuring-Devices of all possible sorts?
Or the above AND "Everything" that can influence the process??

I would really really appreciate an answer to this, because as it is, we do not know what to do.
Thanks in Advance,

Peter

Hi,

Based on my understanding, process controls are any equipment/systems used to inspect/measure/test product and process characteristics. equipment can also be a machine. For example, in automotive gearbox assembly line, gearbox screws are tightened a controlled (for torque value) by an automated equipment. the alternative control method is usually manual torque meter.
So, drilling machines are not control equipment. they usually only drill.
 

morteza

Trusted Information Resource
#9
Hi all,

In clause 8.5.6.1.1, IATF 16949 also requires:

The organization shall include in this process, based on risk analysis (such as FMEA), severity, and the internal approvals to be obtained prior to production implementation of the alternate control method.

I can not understand the structure of the above sentence. My understanding is that:
based on risk analysis (such as FMEA) and severity, the organization shall defined any internal approvals to be obtained prior to production implementation of the alternate control method.

But as you see in the original text, there is no "and" between risk analysis (such as FMEA) and severity, so I think that my understanding could not be true.

May someone explain me the structure and intent of the above requirement?

Thanks
 

jack770214

Involved In Discussions
#10
What's the purpose of 8.5.5.1.1: temporary change of process controls? What shall I do to meet the requirements?

What if our process is quite stable and there is no alternate process?

thanks in advance
The key word is controls. Say your automated inspection tool goes down and you need to go to 100% visual inspection or use a backup inspection tool. You need to have a change management process that includes updating your control plan and pfmea SOD calculations. Dude you would have to hire me as your quality manager for me to assess everything that needed to be done. Your IATF training should have covered this bro. Also there are many threads in the forum on this. We impress the hell out of customers and auditors with our global change mangement system. Its critical to our biz and handling changes such as alternate process control methods is a tiny piece of it.
 
Last edited:
Thread starter Similar threads Forum Replies Date
G More on IATF 8.5.6.1.1 - Temporary Change of Process Controls IATF 16949 - Automotive Quality Systems Standard 4
B IATF 16949 Clause 8.5.6.1.1 (Temporary Process Control Change) IATF 16949 - Automotive Quality Systems Standard 24
P IATF 16949 Clause 8.5.6.1.1 - Temporary Change of Process Controls IATF 16949 - Automotive Quality Systems Standard 21
M Temporary Process Change Form needed Document Control Systems, Procedures, Forms and Templates 8
A Temporary Change of Manufacturing Site - Notified Body Notification Requirements EU Medical Device Regulations 3
P How to specify criteria for TECN (Temporary Engineering Change Notice) Document Control Systems, Procedures, Forms and Templates 3
J Looking for examples of "Temporary Change Request" form Document Control Systems, Procedures, Forms and Templates 2
P GM TWO (Temporary Work Order) - Is there a specific GM format for the TWO# to be sent with the material? IATF 16949 - Automotive Quality Systems Standard 1
M FDA News USFDA Proposes to End Temporary Extension of GUDID’s Grace Period Medical Device and FDA Regulations and Standards News 3
S Is management representative a temporary post or a job title Management Review Meetings and related Processes 16
C How to Control Temporary Inspections Manufacturing and Related Processes 5
A Safety Shoes & Temporary Workers - Is it correct to reuse again or not? Occupational Health & Safety Management Standards 11
S Temporary Facility Used For Production - Use of existing Third Party Logos ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
P Seconded Staff and Temporary Assignments Occupational Health & Safety Management Standards 3
Q Temporary Control of Scrap at the Machines while the Process is Running Nonconformance and Corrective Action 6
P NQA-1 Requirement 17 Quality Records - Facility Types and Temporary Storage Various Other Specifications, Standards, and related Requirements 5
R Minitab for I-MR - Monitoring Process on Temporary Basis & Temporary Limits Using Minitab Software 6
ScottK Are Temporary Employees considered Employees from a Procedural Standpoint? Quality Manager and Management Related Issues 19
H Capturing temporary actions in PFMEA in terms of manpower, lessons learned FMEA and Control Plans 9
C Temporary employment agencies for temporary quality engineers and/or quality managers Career and Occupation Discussions 3
F Developing a corporate GMP/Quality training program for temporary workers Training - Internal, External, Online and Distance Learning 1
C Temporary Laborer Training Requirements - 6.2.2 Competence, Awareness and Training ISO 13485:2016 - Medical Device Quality Management Systems 12
S Temporary worker within the Organization ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 17
SteelMaiden Signs of the Times? Temporary Staffing and Mini-Storage Coffee Break and Water Cooler Discussions 2
C What should a temporary, remote location have in place to ensure OSHA compliance? Occupational Health & Safety Management Standards 14
M Temporary Deviation Procedure Document Control Systems, Procedures, Forms and Templates 12
C Training Requirements for Temporary Employees ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 6
Q Temporary Employees Training and Employee Retention suggestions needed Training - Internal, External, Online and Distance Learning 38
P Evaluation of personnel suppliers (Contract / Temporary - Engineers) Supplier Quality Assurance and other Supplier Issues 8
I Temporary Bandit, Ad Hoc or Rogue Records, Forms, Data, Documents - How to Justify Records and Data - Quality, Legal and Other Evidence 30
Ed Panek Notified Body Substantial Change MDD EU Medical Device Regulations 1
A Purchasing Controls on Change Management of Literature/Labeling ISO 13485:2016 - Medical Device Quality Management Systems 3
A For software change - New Channel of interoperability CE Marking (Conformité Européene) / CB Scheme 4
JoCam IEC 60601-1 and 60601-1-2 retest after PCBA change IEC 60601 - Medical Electrical Equipment Safety Standards Series 3
N ISO 13485 7.3.9 Change control in medical device software ISO 13485:2016 - Medical Device Quality Management Systems 6
A ISO 13485 procedure change and reflect to legacy manufacture items ISO 13485:2016 - Medical Device Quality Management Systems 2
R AS9102 FAI Change in Material / Process Supplier AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
D Reports under change management | ISO 13485:2016 & ISO 9001:2015 ISO 13485:2016 - Medical Device Quality Management Systems 3
Q Time change via change of Time Zone Qualification and Validation (including 21 CFR Part 11) 3
T IEC 60601-1-8:2020 Is it necessary to change the alarm melody? IEC 60601 - Medical Electrical Equipment Safety Standards Series 1
M Change in Constitution / Ownership of firm -------ISO 13485 ISO 13485:2016 - Medical Device Quality Management Systems 1
U Power supply - Change From 160 to 300 Watts - Significant change? EU Medical Device Regulations 2
N Sterilization Protocol Change in Validation Process and further impacts ISO 13485:2016 - Medical Device Quality Management Systems 1
M Label change - 510(k) Medical Device and FDA Regulations and Standards News 5
M EMS change management ISO 14001:2015 Specific Discussions 2
E Document Change Request forms (or no forms)? ISO 13485:2016 - Medical Device Quality Management Systems 9
J Significant change related to design and intended use EU Medical Device Regulations 3
J Need Change Control Yes/No Decision Tree Template ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
S Cleaning process center change ISO 13485:2016 - Medical Device Quality Management Systems 4
U NOC - What is considered a "design change" EU Medical Device Regulations 5

Similar threads

Top Bottom