http://www.acq.osd.mil/dpap/paic/berryamendment.htm
Restrictions on DoD Purchases from Non-U.S. Sources
Imposed by 10 U.S.C. 2533a (the "Berry Amendment")

I'm particularly interested in "specialty metals"...

A part we make consists of brass, stainless steel, and aluminum parts. Apparently our customer needs to know if we are compliant...

now, it seems to me that the brass is not a "specialty metal" as it does not fall into line i, ii, iii, or iv.
Same with Aluminum.

but the stainless steel - I have the material certs for the parts but I'm trying to figure out how to read the chemical composition. The numbers given for one are:
C .08000
Mn .77000
Si .43000
P .02400
S .00100
Cr 16.35000
Ni 7.52000
Mo .13000
Al 1.02000
Cu .34000

Are these numbers by percentage?

If so then apparently I have more tracking to do on this part because the Cr is over .25%

any feedback at all is appreciated.

thanks
 
Elsmar Forum Sponsor

Cari Spears

Super Moderator
Staff member
Super Moderator
#3
Re: Trying to decipher the Berry Amendment for DoD parts...

Hunh - Sounds like you are doing what I'm doing at the moment. This is the email I sent to everyone here and our customer.
Cari Spears said:
Good Morning –

I’ve attached the relevant table from the AMS6260 specification – I think the 1.00-1.40 chromium content and the 3.0-3.5 nickel content do make this a specialty metal – see (B) below:

“(B) Containing more than 0.25 percent of any of the following elements: aluminum, chromium, cobalt, columbium, molybdenum, nickel, titanium, tungsten, or vanadium;”

I guess my next step is to pull the material certs for all work in progress to determine what mills it all came from. Since everything we make for (customer name deleted) is made of AMS6260, this has the potential to affect all (customer name deleted) jobs in progress at this time. I will get back with everyone once I track down all of the routers for the heat/lot information and pull all of the certs.

Thanks,

Cari
I sent the above in response to this:
cari's customer said:
Attn: CARI SPEARS

Dear Supplier:

Effective immediately,

DFAR 252.225-7014 Preference for Domestic Specialty Metals clause and DFAR 252.225-70XX Buy American clauses apply to all new POs issued from (customer name removed), as well as any existing POs you may have.

This will also apply to any RFQ's you are currently processing for us.

This is regardless of the nature of the order, military or commercial.

Please confirm via email your receipt of this email immediately.

Please advise no later than 12:00 noon EST, Friday, May 26, 2006 any PO deliveries that are at risk going forward and your plans to mitigate those delays.

Thanks for your prompt attention in this matter.



Regards,
 

ScottK

Not out of the crisis
Staff member
Super Moderator
#4
Re: Trying to decipher the Berry Amendment for DoD parts...

Cari Spears said:
Hunh - Sounds like you are doing what I'm doing at the moment. This is the email I sent to everyone here and our customer.


I sent the above in response to this:
cool! Thanks Cari!

I'm at the research point right now - our customer has not demanded compliance, but is seeing if we are already compliant.

incidentally - here's an interesting article I ran across



"Specialty Metals and The Berry Amendment - Frankenstein's Monster and Bas Domestic Policy"
 

Jim Wynne

Staff member
Admin
#5
Re: Trying to decipher the Berry Amendment for DoD parts...

Cari Spears said:
Hunh - Sounds like you are doing what I'm doing at the moment.
clauses apply to all new POs issued from (customer name removed), as well as any existing POs you may have.
Just a word to the wise...a customer has no right to unilaterally amend existing orders. If the proposed amendment creates new costs, you have the option of requoting.
 
Last edited:

Cari Spears

Super Moderator
Staff member
Super Moderator
#6
Re: Trying to decipher the Berry Amendment for DoD parts...

Jim Wynne said:
Just a word to the wise...a customer has no right to unilaterally amend existing orders. If the proposed amendment creates new costs, you have the option of requoting.
Yeah - we're not sure what will happen - but we have LOTS of their work in progress right now. I can't see them telling us they won't buy parts that were already in progress prior to this requirement. This customer is not unreasonable - we're hoping to tell them which parts (we serialize all of their parts) do not comply with the requirement and at what point each part will be produced from material bought in the US or from a qualifying country. We do intend to requote if our costs increase.
 
T

tyker

#7
Sometimes it would be more appropriate to have a legal, rather than engineering, qualification in this job.
Some of my products are manufactured from stainless steel and one of my American customers has kindly brought this legislation to my attention with emphasis on the "Alt 1" clause.
Because I am based in the UK, a qualifying country, it seems I can buy my steel from anywhere on the planet and still comply. If I move production to my facility in the USA, I'm restricted on where I can buy the steel. As with many things right now, the logic escapes me.
Incidentally, if my interpretation is wrong, please don't feel the need to correct my ignorance.
 

ScottK

Not out of the crisis
Staff member
Super Moderator
#8
tyker said:
Sometimes it would be more appropriate to have a legal, rather than engineering, qualification in this job.
Some of my products are manufactured from stainless steel and one of my American customers has kindly brought this legislation to my attention with emphasis on the "Alt 1" clause.
Because I am based in the UK, a qualifying country, it seems I can buy my steel from anywhere on the planet and still comply. If I move production to my facility in the USA, I'm restricted on where I can buy the steel. As with many things right now, the logic escapes me.
Incidentally, if my interpretation is wrong, please don't feel the need to correct my ignorance.
this is true - if you read the article I posted earlier the author specifically picks on this. Apparently it's all because the US is not on its own qualifying country list. :tg:
 
Thread starter Similar threads Forum Replies Date
chris1price ISO13485: 2016 Amendment coming? ISO 13485:2016 - Medical Device Quality Management Systems 6
dgrainger Informational DRAFT: The Medical Devices (Coronavirus Test Device Approvals) (Amendment) Regulations 2021 UK Medical Device Regulations 1
D Faxback form versus amendment License for Class II Canada Medical Device Regulations 1
B Reference to IEC 60950-1 in Amendment 2 IEC 60601 - Medical Electrical Equipment Safety Standards Series 1
M Brexit The Medical Devices (Amendment etc.) (EU Exit) Regulations 2020 UK Medical Device Regulations 1
D Amendment Class II - Please confirm if the submission is by email (Canada) - Help Canada Medical Device Regulations 0
D Where to find Guidance Class II Amendment Canada Medical Device Regulations 1
gunnyshore Adding a new facility - do I need to submit an amendment to the MDL or MDEL, or both? Canada Medical Device Regulations 3
adir88 Amendment 1 of IEC 62366-1 - Details yet? IEC 62366 - Medical Device Usability Engineering 2
A IEC 60601-2-2 - Defib-proof test amendment to base standard IEC 60601 - Medical Electrical Equipment Safety Standards Series 2
W Documentation - Use of Addendum vs Amendment Document Control Systems, Procedures, Forms and Templates 1
B Manufacturing site relocation of pre amendment Class II medical device Manufacturing and Related Processes 4
K Canada License Amendment - Old Product to New Product Canada Medical Device Regulations 2
T Is a new edition of the IEC 60601 in preparation for 2019 (Amendment 2)? IEC 60601 - Medical Electrical Equipment Safety Standards Series 3
B Inquiry for Class II medical device licence amendment application Canada Medical Device Regulations 1
L What changed in Amendment 1:2011 in the ISO 2859-1:1999? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 2
L IEC 60601-1 Amendment 1 3rd Edition and Brazil ABNT NBR IEC 60601-1:2010 IEC 60601 - Medical Electrical Equipment Safety Standards Series 12
J Amendment vs. New Medical Device Licence Application Canada Medical Device Regulations 3
R Understanding clause 15.4.2.1 d) of amendment 1:2012? IEC 60601 - Medical Electrical Equipment Safety Standards Series 7
B Class II and Class III Medical Device Amendment for Change in Location? Canada Medical Device Regulations 2
E Amendment to Medical Device Directive (MDR) - December 2013 EU Medical Device Regulations 0
G What are the changes in the BS EN 1041:2008 recently published amendment Other Medical Device Related Standards 11
X FDA UDI (Unique Identification) amendment on 19 Nov 2012 - Date of 'final rule'? US Food and Drug Administration (FDA) 4
P Amendment 1 to 60601-1, 3rd Edition Medical Electrical Equipment Standard IEC 60601 - Medical Electrical Equipment Safety Standards Series 4
S EU Medical Devices (Amendment) Regulations 2012 have been published EU Medical Device Regulations 2
T Multiple Changes to a Class III Medical Device - Single License Amendment? Canada Medical Device Regulations 2
M Final draft of IEC 60601-1 Amendment 1 available - May 2012 IEC 60601 - Medical Electrical Equipment Safety Standards Series 7
W Is there an IEC 60601 3rd Edition 1st Amendment? IEC 60601 - Medical Electrical Equipment Safety Standards Series 3
R License Amendment - Health Canada Regulations Canada Medical Device Regulations 3
D Does anyone know about an ISO 19011 Amendment? General Auditing Discussions 2
somashekar MDD current amendment M5 application - Questions EU Medical Device Regulations 4
V Document Creation and Amendment Form example Document Control Systems, Procedures, Forms and Templates 2
N Number of changes in Amendment 1 of the 3rd Ed. of IEC60601-1 IEC 60601 - Medical Electrical Equipment Safety Standards Series 6
N Telephone Amendment to Abbreviated New Drug Applications (ANDA) US Food and Drug Administration (FDA) 1
P Who is responsible for CAME Amendment - Part M AMC M.A.704 (6) EASA and JAA Aviation Standards and Requirements 6
lilybef Clinical Evaluation Reports per the new MDD 93/42/EEC amendment EU Medical Device Regulations 47
P Comparison Between the older ER checklist and that of 2007 amendment EU Medical Device Regulations 0
T ISO 18369-1 amendment 2009 (what had been amended) Other Medical Device Related Standards 1
xcanals_tecno-med.es Change of classification according to amendment directive 2007/47 EU Medical Device Regulations 1
W Life of a Device being Mandatory on the Packaging - New meddev amendment Other Medical Device and Orthopedic Related Topics 13
V When to add contents to Quality Manual amendment table? Quality Management System (QMS) Manuals 3
V 9001 Amendment Process Information - ISO 9001 and the current revision process ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
E Amendment to the ISO9001 registration scope (more like verbiage to me) ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
Sidney Vianna Design Amendment to ISO 9001:2000 Design and Development of Products and Processes 1
Hershal ISO/IEC 17025 FDAM (final draft amendment) which will effect the revision of 17025 ISO 17025 related Discussions 0
J0anne 90 Day Limit Imposed by NB to complete NCs raised at audit Preventive Action and Continuous Improvement 6
S Certification to ISO 14001 - Requirement Imposed on a Supplier Registrars and Notified Bodies 9
E SI 9000 Part 4 - Testing requirement that is imposed in China Other ISO and International Standards and European Regulations 2

Similar threads

Top Bottom