The FMEA Mini-Series: Using an FMEA vs. SxO for Prioritizing

A

Arun Kumar

#11
Hi all,

My opinion is that the RPN indication doesnot make sure that your process is safe-guarded against potential failure modes with the controls that you identify. There is an inherent methodology called Process review that can be practiced for the same. For eg., consider the following option:
S=5*0=7* D=5 = 175. We come to the conclusion that an action has to be taken.
But consider the following:
S=9 * O=5 * D=1
This will give an RPN of 45, but when the problem occurs, it will have a higher impact ont he customer. Hence the analysis tool has to be changed. What we are discussing will not work if you are targetting improvement.

Regards,
Arun Kumar
 
Elsmar Forum Sponsor

Marc

Hunkered Down for the Duration
Staff member
Admin
#13
Just a note: RonSmith is unregistered. I don't know exactly what the occasion is, but today Ron has left 7 messages each of which has been a confirmation of omnex. I wouldn't question this particularly, but with no registration it seems like a lot of love for omnex. I do hope this is not SPAM.
 
#14
Arun, I feel that the FMEA manual provides all the guidance necessary to identify and analyse potential problems.

Ron, I have tried many software programs; the only one that gets my vote is MS excel.
We tend to make things to difficult by jumping from new fad to new fad and the one thing I don't need is some overated software package making my life more difficult.
 
T

T.P.NAMASIVAYAM

#15
RPNis an indication of how the safe the process is against the potential failure modes. However to have a perfect FMEA the following needs to be considered.
01. Potential Failure causes shall be identified taking into consideration Man, Material, Macheines, Methods & Environment.
02. Process Controls need to be identified from the following:
a.Controls that can Prevent the Failure Mode.
b.Controls that the Prevent the Cause of the Failure Mode.
c. Controls that can detect the Failure Mode.
d. Controls that can detect the Potential Cause of the Failure Mode.

If a FMEA is prepared taking into consideration the above the resulting RPN will have a close link with the Process and the Failure Modes.

Considering your example 2 even thought the RPN is only 45, Still action is required since the Severity is 9 which is very high which can affect the safety of the user & can be against the govt. regulations.

[This message has been edited by Marc Smith (edited 18 April 2001).]
 
A

Al Dyer

#16
If the severity is 9, occurrence is 1, and detection is 1, would you need to act on the situation.

I can't see why, severity is supposed to be determined by the customer and hypothetically out of your control. (internal or external customer doesn't matter)

As a supplier I would worry more about occurrence & detection than severity and RPN. O & D are within my control. This is not to say that RPN is discounted, if your O & D are high the actions would be commensurate with the severity level.

MHO

ASD...
 
P

Paul Alexander

#17
On the Severity issue - if it is high - could you not suggest a design change to lessen its impact?

Only a thought.......
 
A

Al Dyer

#18
Originally posted by Paul Alexander:
On the Severity issue - if it is high - could you not suggest a design change to lessen its impact?

Only a thought.......
You sure could, it always helps to improve youself and help the customer!

ASD...
 
H

Help Me

#19
I would suggest that there is NO way to lower a severity rating with a design change.

For example, suppose the design in question is for a parachute. The severity of a failure to open would have to be a 10. How do you lower that severity?? A secondary parachute? That doesn't really lessen the severity, though. It just shifts it to the "n'th" redundant chute.

The fact of the matter is that severity of failure is not a function of the design. However, controlling the OCCURENCE and DETECTION RPN's is definitely facilitated by design alternatives, ie. design a chute with a 99.9999% successful deployment rating, and throw in a couple of redundant back-up chutes with equal success ratings, and your occurrence is extremely low.

But if the chutes don't open......

The severity rating cannot change. At least, I don't understand how.

What am I missing?
 
Thread starter Similar threads Forum Replies Date
B Why the Greek god Hephaestus should have done a design FMEA (DFMEA) on his giant robot APQP and PPAP 1
P Design FMEA - Detection Rating criteria ISO 14971 - Medical Device Risk Management 3
J Which OEM or customers are now requiring the new AIAG/VDA FMEA format? FMEA and Control Plans 0
C AIAG/VDA FMEA - Is the new better? FMEA and Control Plans 0
I Does anybody use Detection in medical device Design FMEA? ISO 14971 - Medical Device Risk Management 18
P VDA AIAG FMEA - Slides for Quality Audience FMEA and Control Plans 4
P Design FMEA for Industrial Machinery FMEA and Control Plans 3
B AIAG/VDA’s FMEA Manual Is a Major Advance (my take on this subject) FMEA and Control Plans 2
B AIAG-VDA FMEA - When the new format will be required FMEA and Control Plans 5
D Where does "as far as possible" stop? FMEA - EN 14971 ISO 14971 - Medical Device Risk Management 29
R What are the changes in 5th Edition of FMEA manual? FMEA and Control Plans 6
M Risk and Corrective actions - Currently no FMEA's - Car systems Risk Management Principles and Generic Guidelines 8
C FMEA Process assessment In the Draft for the AIAG/VDA FMEA Manual is gone FMEA and Control Plans 0
Jimmy123 Example of a P-Diagram for Process FMEA - Uncontrollable noises FMEA and Control Plans 39
Jimmy123 FMEA - Preventive vs Detection Control FMEA and Control Plans 7
M MANUAL FMEA VDA VDA Standards - Germany's Automotive Standards 1
L Which one is more important for FMEA CC or SC, FMEA and Control Plans 6
G FMEA financial benefits APQP and PPAP 2
M Foundation FMEA: what is it? FMEA and Control Plans 15
eule del ayre Merging FMEA and Quality Control Process Flow FMEA and Control Plans 0
K AIAG/VDA FMEA & Process Control Plans FMEA and Control Plans 0
D FMEA-MSR in the AIAG-VDA Aligned Handbook - What is it? FMEA and Control Plans 4
bobdoering Catching up on the new FMEA book! Funny Stuff - Jokes and Humour 2
bobdoering AIAG VDA FMEA Handbook - 2019 - something familiar about this.... FMEA and Control Plans 37
S New AIAG FMEA Process - How to complete the new format FMEA and Control Plans 32
C FMEA - Multiple function failures considerations FMEA and Control Plans 3
J New FMEA aproach - formular Manufacturing and Related Processes 2
B Confusion on the new FMEA guidebook - Are we supposed to replace our FMEAs? IATF 16949 - Automotive Quality Systems Standard 3
Z Using FMEA for Knowledge Management FMEA and Control Plans 6
D Link between FMEA, flow chart and control plan FMEA and Control Plans 10
K PFMEA (Process FMEA) - Can be common for 3000 products? FMEA and Control Plans 2
R The difference b/w FMEA & Risk analysis as per iso 14971 ISO 14971 - Medical Device Risk Management 8
Jimmy123 ISO 31000 vs FMEA FMEA and Control Plans 1
Jimmy123 What is a Reverse FMEA? FMEA and Control Plans 6
I What does "Class" mean in an FMEA? FMEA and Control Plans 16
M FMEA/DCP Structure and Quantity - Similar Parts and Processes FMEA and Control Plans 7
Marc Definition DFMEA (Design FMEA) - Definition Definitions, Acronyms, Abbreviations and Interpretations Listed Alphabetically 0
D Where does FMEA fit in your ISO 14971 Risk Management process? ISO 14971 - Medical Device Risk Management 13
JT3M Looking for FMEA plastic injection molding FMEA and Control Plans 6
Ashok sunder Is it possible to reduce FMEA Occurrence and Detection Ranking after corrective action taken for customer complaints? FMEA and Control Plans 6
D Design FMEA for a component - Should I make the following assumptions? FMEA and Control Plans 7
N In-Process Production Test Stations in PFMEA (Process FMEA) FMEA and Control Plans 18
C VDA Vol.4 - Evaluation of an FMEA FMEA and Control Plans 0
D Do you need requirements for a Design FMEA FMEA and Control Plans 1
D System Level FMEA example wanted FMEA and Control Plans 2
G Can anyone tell me about Tooling FMEA FMEA and Control Plans 3
K Need feedback: FMEA Web Application FMEA and Control Plans 5
N Process FMEA Occurrence Ranking for New Process FMEA and Control Plans 3
G AIAG FMEA - Major customers of the FMEA process FMEA and Control Plans 3
optomist1 AFMEA - Algorithm FMEA FMEA and Control Plans 3
Similar threads


















































Top Bottom