The known set of all root causes

normzone

Trusted Information Resource
Mulling over some input I've received in an other thread recently, I've reached the conclusion that some of the recent external audit nonconformances I experienced have root causes that would meet the description of " ineffective management process ".

This was in comparison to my original premise that they fell into " inadequate resources ".

Which leads me to the thought that I'll use to sustain my morale today - that there could in theory be some form of family tree, or some kind of Venn diagram, that contains an approximation of the relationship(s) all legitimate root causes.

They would have to be described in a generic manner, of course. At the bottom of the tree you would have the usual "operator error" and "did process incorrectly" old saws, and those would transition up into kind of a default Five Why sequence, becoming increasingly professionally described until at the top you would have the small group of "kiss of death" causes, such as "ineffective management process" and "inadequate resources".

I can't be the first one to think of this, and there are bound to be problems with the approach. Have any of you seen anything like this in your travels ?

That said, I'm leaning towards "ineffective management process" for some of my root causes I'll be documenting in the next week. That should be popular.
 

Sidney Vianna

Post Responsibly
Leader
Admin
Just be careful on how you follow that trail; inadequacy of resources and ineffective management processes obviously lead to ISO 9001:2015 ¶ 5.1 - Leadership and "commitment". 5.1.1. a) & e). Are you prepared for the consequences of exposing the organization's leadership? Or lack thereof?

Risk. Based. Think.
 

normzone

Trusted Information Resource
I don't see it going well for me regardless of what I do.

If I try to soft pedal it, my external auditor is unlikely to accept it unless I can couch it in elaborate sales-speak. I'm not very good at that. The issues in question are caused by people working million hour weeks to meet $hipping targets, and other commitments made in management review meetings fall by the wayside.

They answer to the guy at the top, who gives them those targets .... including " If you're giving 100%, then give 150% if that's what it takes "
 

Bev D

Heretical Statistician
Leader
Super Moderator
Don’t know if he invented it, but he certainly popularized it: Deming said management was responsible for 80-95ish% of all problems. And certainly this is one of the primary tenants of the Toyota Production System.

From a systemic standpoint I agree, but its not really very actionable - just more of the same old blame game; we’re just pointing the pistol at someone else.

We need to provide actionable information and to do this we have to truly understand the causal mechanism(s) at play.
 

Sidney Vianna

Post Responsibly
Leader
Admin
If I try to soft pedal it, my external auditor is unlikely to accept it unless I can couch it in elaborate sales-speak.
Akin to a doctor diagnosing the disease so an appropriate course of treatment and drugs can be prescribed, root cause analysis is just one step so you can apply the proper solution, a.k.a correction & corrective action.

If you elaborate the RCA and reach "leadership management is not doing their job", how do you propose that will be fixed?

Bev's post is spot on. Yes, in the overwhelming majority of the cases, it is a management failure. However, if you establish that management is incompetent, you have very few avenues to follow that point on. Maybe you are at the end of the rope and not concerned with the thing hitting the fan, but be aware. And good luck.
 

ScottK

Not out of the crisis
Leader
Super Moderator
I have used that, but it was after management had been nearly 100% changed.. it was along the lines of "Prior management failed to... provide resources, provide support, provide training, etc." followed by 'current management is committed to meeting the requirements and here is our plan to fix the situation'

So my advice would be to word it gently if it's the people that are the cause of the problem are the people still in charge.
 

normzone

Trusted Information Resource
If you elaborate the RCA and reach "leadership management is not doing their job", how do you propose that will be fixed?

Well, given the reporting structure of the outfit (my role is somewhere between advisory and sacrificial) I'd wind up monitoring and reporting on progress made (or not) on a more formal and more often schedule.

Then the third level employee not getting it done, who is supervised by the second level level employee who has his own overload and oversight of the third level guy only on paper, would have to address this with myself and the guy at the top on a regular basis, to discuss solutions.

This communication happens already, but not often enough. Authoritative statements and commitments get made in meetings which are immediately discarded afterward. Rinse and repeat ....

EDIT: I've invited top management and the players involved to meet tomorrow - we'll see how this plays out. :bonk:
 
Last edited:

Mike S.

Happy to be Alive
Trusted Information Resource
Let the ineffective management come up with the correction and corrective action.

If they think they are not the root cause, let those with the obviously superior intellect tell you what the root cause and corresponding correction and CA is and you can just write it up and have them sign it and submit it.

Don;t sacrifice yourself for unappreciative people. It'll all come out in the wash. :popcorn:
 
Thread starter Similar threads Forum Replies Date
L How to evaluate the process capability of a data set that is non-normal (cannot be transformed and does not fit any known distribution)? Capability, Accuracy and Stability - Processes, Machines, etc. 14
I Gage R&R Studies For Small Set of Data With Varied Known Value Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 1
D Control charts - Seeking known data set to confirm my software Statistical Analysis Tools, Techniques and SPC 0
Randy Oldest customer complaint known in the world Customer Complaints 5
Judy Abbott 10993-18 requirements - Well known materials Medical Device and FDA Regulations and Standards News 9
Zero_yield Known Uses of Crystal Violet / Methyl Violet? Problem Solving, Root Cause Fault and Failure Analysis 5
A Capability Study - in the beginning of your career what should you have known about the tool Quality Tools, Improvement and Analysis 11
dubrizo If Quality Objectives are not known to employees, is it a Nonconformance? General Auditing Discussions 7
Marc Scientists discover world's earliest known brain World News 0
kedarg6500 Determination of Metal Grade from known Chemical Composition Inspection, Prints (Drawings), Testing, Sampling and Related Topics 4
M Reverse PFMEA also known as "Go and See" PFMEA - Customer Request FMEA and Control Plans 27
SteelMaiden Murphy's Lesser Known Laws Coffee Break and Water Cooler Discussions 3
S Six sigma for known solution or unknown solution Six Sigma 1
S Applying ANSI/ASQ Z1.4 given known lot size and 100% visual inspection AQL - Acceptable Quality Level 2
P Name at least 25 out of 100+ world known personalities in the painting Coffee Break and Water Cooler Discussions 14
B AS9100C Sampling Plans - When samples have known nonconformities Inspection, Prints (Drawings), Testing, Sampling and Related Topics 6
H Known non-conforming samples in attribute GR&R (Gage R&R) Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 3
0 Which sampling plan to use if 0.5% defective is known Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
B Murphy's Lesser Known Laws Funny Stuff - Jokes and Humour 9
Z ISO 9001 Clauses which should be known by every one in the organization? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 14
S Sampling - Clause 8.2.4 - What do the words "known non conformities" mean here? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 9
H Verification of a Test Apparatus by using known nonconforming part(s) Inspection, Prints (Drawings), Testing, Sampling and Related Topics 7
Marc AS9120 - Designed for aerospace suppliers known as "stockist distributors" Design and Development of Products and Processes 3
P How do you evaluate customer complaints? Known indicators during utilization phase Customer Complaints 4
L How long have you known balanced scorecard? Quality Tools, Improvement and Analysis 2
J KAPPA Statistic - Comparing appraisers ratings to a known standard IATF 16949 - Automotive Quality Systems Standard 8
Marc Calibration to a Known Standard - Theory 101 General Measurement Device and Calibration Topics 10
Marc Calibration is the process of establishing a KNOWN RELATIONSHIP - Traceability General Measurement Device and Calibration Topics 0
Marc Making Your Views On ISO 9001 Revision Known ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 0
K New set of medical devices - samples EU Medical Device Regulations 3
Z Shelf life automatically set to 6 months when no device performance shelf life data provide Medical Device and FDA Regulations and Standards News 5
M Need to set up a "crisis management and business continuity plan" AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
R MSA on set of parts with low variation Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 20
A Need to calculate tolerance Intervals with a set of non-normal data and 3-Parameter Weibull distribution Using Minitab Software 0
P Best european location to set up for a virtual medical device manufacturer? EU Medical Device Regulations 4
S Is QMS like a set of rules and regulations that a company follows? ISO 13485:2016 - Medical Device Quality Management Systems 10
W Regarding Requirement for Hi pot & Leakage Current test Station Set-up IEC 60601 - Medical Electrical Equipment Safety Standards Series 6
G CE marking of MD and IVD set EU Medical Device Regulations 3
J How to Set Microbial Limits in Food Supplements Food Safety - ISO 22000, HACCP (21 CFR 120) 3
qualprod To set frequency to review documents in ISO 9001 7.5? Document Control Systems, Procedures, Forms and Templates 13
M IATF 16949 8.5.1.3 Verification of job set-ups - Do we need secondary check? IATF 16949 - Automotive Quality Systems Standard 7
B Set RH spec from dewpoint spec General Measurement Device and Calibration Topics 2
S Is Optical Parallel Set required calibration? ISO 17025 related Discussions 1
R Gauge R&R on pre-set torque wrench Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 2
A How to set up Continuous CpK monitoring of an injection mold process Reliability Analysis - Predictions, Testing and Standards 7
N Internal Audit Schedule – Who gets to set the schedule? Internal Auditing 16
G Comparing Gauge Blocks - Translating the calibration between the master set and the QA set General Measurement Device and Calibration Topics 2
N When to record values if a spec for a mfg process is set Manufacturing and Related Processes 3
Marc Time Zone - Set your Time Zone Elsmar Xenforo Forum Software Instructions and Help 1
D As a newcomer to QMS, I really appreciate how ISO is set up. ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3

Similar threads

Top Bottom