[Thermal powerplant] Why "Generation of electricity" is a special process?

x-files

Involved In Discussions
#1
Hi,

[It's about thermal power plant]

Why the "Generation of electricity" is a special process for us? (it now states in our Manual, but no one knows why)

It's one of the major processes (and SOPs), we have over 50,000 measure places (and encoders), sophisticated equipment and computers that measure, record and display all events in milliseconds, and huge displays to show and alert all that's relevant. Every single critical event is known immediately, by many ways, even SMS if chosen so. Many people 0h-24h holds eyes on whats happening and regular operation.

What kind of "Process validation" we furthermore need?

What " ...resulting output we cannot verify by subsequent monitoring or measurement, and as a consequent deficiencies (incompleteness or inadequacy) in the product become apparent (known) only after the product is in use or the service has been delivered..."?


Our real special processes are welding processes (mainly outsource), because of huge boiler pipes system, and possibility that even little failure in welding could stop the whole power plant and so make huge costs.



Best regards,
Vladimir Stefanovic
 
Elsmar Forum Sponsor

John Broomfield

Staff member
Super Moderator
#2
Hi,

[It's about thermal power plant]

Why the "Generation of electricity" is a special process for us? (it now states in our Manual, but no one knows why)

It's one of the major processes (and SOPs), we have over 50,000 measure places (and encoders), sophisticated equipment and computers that measure, record and display all events in milliseconds, and huge displays to show and alert all that's relevant. Every single critical event is known immediately, by many ways, even SMS if chosen so. Many people 0h-24h holds eyes on whats happening and regular operation.

What kind of "Process validation" we furthermore need?

What " ...resulting output we cannot verify by subsequent monitoring or measurement, and as a consequent deficiencies (incompleteness or inadequacy) in the product become apparent (known) only after the product is in use or the service has been delivered..."?


Our real special processes are welding processes (mainly outsource), because of huge boiler pipes system, and possibility that even little failure in welding could stop the whole power plant and so make huge costs.



Best regards,
Vladimir Stefanovic
Vladimir,

I agree. The output of generating electricity can be and is verified before it is fed to the grid for distribution to customers.

Even though the process generating electricity is designed (and, therefore, validated) to deliver the required cycles, voltage and amperage, it does not qualify as a special process in terms of clause 7.5.2.

John
 

normzone

Trusted Information Resource
#4
Sounds like somebody made a decision once - research the history of the revisions of that manual and find out when it first appeared, and who was involved. There may have been reasons, but they don't sound valid from these postings.
 

John Broomfield

Staff member
Super Moderator
#5
normzone,

I can see the logic of designing and validating all production processes so less time and money is wasted on verifying the product.

But that does not necessarily make a validated process a special process in the sense meant by clause 7.5.2.

Perhaps, though, this is why generating electricity was misclassified as a special process in the first place.

John
 
Thread starter Similar threads Forum Replies Date
x-files Thermal Powerplant - 7.5.3 Identification and Traceability ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
x-files [Exclusions] 7.3 Design and development vs. Thermal Powerplant ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 11
I Lifetime Support Calculation - Thermal Operating Profile Reliability Analysis - Predictions, Testing and Standards 7
S Ring Gage Thermal Expansion General Measurement Device and Calibration Topics 4
E Solder thermal profiles for PPAP - Automotive IATF 16949 - Automotive Quality Systems Standard 1
V Regrinding Material - Thermal properties Manufacturing and Related Processes 4
x-files [Thermal Power plant KOSTOLAC, SERBIA] Sucessfully certified to ISO 50001 Sustainability, Green Initiatives and Ecology 1
S Thermal Sensitivity Testing - Heat Lamp - ILY - Increased blood circulation IEC 60601 - Medical Electrical Equipment Safety Standards Series 2
x-files Global Timeline Plan of IMS/QMS Activities for a Thermal Power Plant ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
Marc Acronym CTE - Coefficient of Thermal Expansion Definitions, Acronyms, Abbreviations and Interpretations Listed Alphabetically 2
O AECQ 200 Revision D vs. Revision C - Thermal Shock & Thermal Cycling Other ISO and International Standards and European Regulations 2
U Is there such a thing as 1-part thermal cure epoxy? Manufacturing and Related Processes 11
J IPC-A-610 E Thermal Plane Acceptance Criteria for D-Pak Component Other ISO and International Standards and European Regulations 2
M Transport Vehicle Thermal Regulation - How would you interpret this requirement? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
D Transformers and Thermal Cutouts IEC 60601 - Medical Electrical Equipment Safety Standards Series 2
R If two thermal cutouts required for water cooling system? IEC 60601 - Medical Electrical Equipment Safety Standards Series 9
O Thermal Shock Test with conditions specified in AEC-Q200 Various Other Specifications, Standards, and related Requirements 3
M Diebond adhesive blowholes seen after thermal curing on chip to plastic bottle mount Manufacturing and Related Processes 4
somashekar The Plasma Thermal Destruction and Recovery (PTDR) Waste-to-Energy Technology Sustainability, Green Initiatives and Ecology 4
S AMS2771 - Soak Time Interpretation (Thermal Conditioning) - T6 or T61? Manufacturing and Related Processes 8
T International Reference or SOP for the Thermal Validation of Incubators, Cold Rooms General Measurement Device and Calibration Topics 2
M Thermal Mapping Concepts - Drug store with dimensions 75m x25m x13m General Measurement Device and Calibration Topics 10
somashekar Optical epoxy for LED having good thermal shock resistance. Manufacturing and Related Processes 2
C Thermal Accelerated Aging Test(s) for Epoxy Reliability Analysis - Predictions, Testing and Standards 6
S Oven Qualification - Thermal profile during the OQ of a vacuum oven General Measurement Device and Calibration Topics 6
somashekar Hazardous waste rules - India - Carbon paper and thermal transfer printer ribbons Miscellaneous Environmental Standards and EMS Related Discussions 7
T Standard for "Simulating Long Term Effects on Materials / Thermal Disinfecion" needed Other ISO and International Standards and European Regulations 3
T Detergents for Washer-Thermal Disinfector of Plastic Materials ISO 13485:2016 - Medical Device Quality Management Systems 3
E GMW3172 - Thermal Shock and PTC cycles required to validate an electronic system Reliability Analysis - Predictions, Testing and Standards 2
J Temperature cycling thermal chamber accuracy and Gage R&R Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 2
M GMW3172 - Electrical/Electronic - Temperature cycling and Thermal shock Customer and Company Specific Requirements 4
D Process Qualification - Heat Treatment Process Furnace - What is Thermal Mapping? Manufacturing and Related Processes 7
P Static Electricity/Pacemaker - Standards for static electricity generation CE Marking (Conformité Européene) / CB Scheme 3
F Electrical Metrology (Source/Generation and Measurement) General Measurement Device and Calibration Topics 1
Ron Rompen Random data generation in Minitab Statistical Analysis Tools, Techniques and SPC 2
Marc US wind capacity surpasses hydro, overall generation to follow World News 0
A Technical File Maintenance - Old generation product EU Medical Device Regulations 4
I What are considered next generation ITSM tools? IT (Information Technology) Service Management 1
M Design History File (DHF) for New Generation of Product 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 3
H CE Mark Technical File - Procedure for the generation of a "Technical File" ISO 13485:2016 - Medical Device Quality Management Systems 5
W Software for Data Collection, Generation of Worksheets and Form 1's EASA and JAA Aviation Standards and Requirements 5
M Documented Procedure for Control of Nonconforming Product - Electricity Generation ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 6
S Quality Policy Contents for Power Sector - Biomass Power Generation Company ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
S Hazard Review Checklist for Biomass Power Generation Plant wanted Occupational Health & Safety Management Standards 19
V Training Needs - Small workforce electricity generation/gas production Training - Internal, External, Online and Distance Learning 2
T 21 CFR Part 11 Compliance - Generation of Complete Copies of Records Qualification and Validation (including 21 CFR Part 11) 3
W ASQ 2008 World Conference Focus: Generation Quality ASQ, ANAB, UKAS, IAF, IRCA, Exemplar Global and Related Organizations 19
F What is a generation II FMEA? FMEA and Control Plans 9
M UID - Unique identification Labels - 2D Data Matrix - Next Generation Barcode Misc. Quality Assurance and Business Systems Related Topics 5
S Responsible for generation of documentation? Include line leaders or team leaders? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9

Similar threads

Top Bottom