Tools Six Sigma for my Automated Machine

THEERANART

Starting to get Involved
#1
My company (kind of computer HDD parts) has a machine to measure distance from center point to edge of parts . Below are my information.

1. within 1 sec able to measure distance 3 parts (that mean 1 part per 1/3 second)
2.There are 2 side to measure left , right
3.I have data of 1 hour around 9000 row data point both of left and right.

I would like to compare between left and right side .

What tools can do to compare ? .
1. Can I use one way Anova to compare left and right ?
2. Can I use average of 3 parts as per one second to represent time.?
3.If I want to use GRR , Which GRR you would to recommence , Nest or Crossed
4. if I want to analyze Capability Process (Cp) , Can do?
Thank you in advance for your help , I am new in Six Sigma..
I have attacked example and specification .
 

Attachments

Elsmar Forum Sponsor
S

supreecha

#2
:cool: In attached file for my concept (some data my key mistaken)
What tools can do to compare ? .
1. Can I use one way Anova to compare left and right ? Ans: Yes you can use :T-est/ F-Test , Regreesion Model etc.
2. Can I use average of 3 parts as per one second to represent time.? Ans: Yes ,by Implemented: X-Bar R Chart (n=3)
3.If I want to use GRR , Which GRR you would to recommence , Nest or Crossed Ans : If implement 3 Operators , 3 trials , 10 samples used Crossed , If 1 Operator , 1 machine used Nest .
4. if I want to analyze Capability Process (Cp) , Can do? Ans: Cp=20.08 ,Cpk =16.68 (left
) , Cp=15.30 , Cpk =15.19 (right)
 

Attachments

Last edited by a moderator:

THEERANART

Starting to get Involved
#4
Thank you so much for your concept and for your time for making sample for me.
Dear Expert,
I have one more question about using Nested GRR , Using minitab there was some error "
Gage R&R Study - Nested ANOVA
* ERROR * Design is not balanced; execution aborted.

I have attached details for 3 required column , I think my data is obtained by automated measure instrument (not people bias)
Could you help to recommend how to change data field or change system .
 

Attachments

Bev D

Heretical Statistician
Staff member
Super Moderator
#5
First - Six Sigma isn't about throwing a bunch of statistical tools at a pile of data and seeing what happens. It is a thoughtful process of trying to understand your process and improve it.

Begin by plotting your data in time series to understand what is happening: you have a drift to the high side on both holes...

...you could do a nested GR&R but a crossed study is probably better unless it is very difficult to make repeat measures.

I wouldn't use a control chart using the average of the two holes as your subgroup. this is not a rational subgroup as the between hole differences is NOT representative of the hole to hole variation over time which is whatyou really want to plot.

You could determine capability, but as this process is not stable (upward drift) the results would be meaningless. additionally the time period is extremely short. you have not included setup to setup, raw material, lot to lot, operator to operator, etc.

yes you could do an ANOVA on hole 1 to hole 2, or any number of other statistical analyses, but what are trying to understand? that is what tells you the best statistical analysis to use.

However, the biggest gap is: what are you trying to do?
 
Last edited:

Miner

Forum Moderator
Staff member
Admin
#6
Some additional observations that may or may not be relevant, but may help understand your process.

  • There is a very strong correlation between the right and left measurements (see scatterplot)
  • However, there is one apparent outlier and another factor that causes a shift in this relationship (see the tri-modal histogram of the delta between right and left measurements)
 

Attachments

THEERANART

Starting to get Involved
#7
First - Six Sigma isn't about throwing a bunch of statistical tools at a pile of data and seeing what happens. It is a thoughtful process of trying to understand your process and improve it.

Begin by plotting your data in time series to understand what is happening: you have a drift to the high side on both holes...

...you could do a nested GR&R but a crossed study is probably better unless it is very difficult to make repeat measures.

I wouldn't use a control chart using the average of the two holes as your subgroup. this is not a rational subgroup as the between hole differences is NOT representative of the hole to hole variation over time which is whatyou really want to plot.

You could determine capability, but as this process is not stable (upward drift) the results would be meaningless. additionally the time period is extremely short. you have not included setup to setup, raw material, lot to lot, operator to operator, etc.

yes you could do an ANOVA on hole 1 to hole 2, or any number of other statistical analyses, but what are trying to understand? that is what tells you the best statistical analysis to use.

However, the biggest gap is: what are you trying to do?
Thank you,
My purpose is to compare left and right head m/c ,
"Inline camera inspection. Camera measure each product parts in a coil .100% inspection.
Camera measure parts edge (left, right) to pilot hole distance .Delta is the difference between left and right measurement.
Camera can inspect 3 parts in a second of a moving coil."

So, In ideal , left and right should be equal .
 
Thread starter Similar threads Forum Replies Date
N Implement the Best Format and Set of Tools for Design For Six Sigma Six Sigma 7
Marc Six Sigma is now said to be a set of tools - What, exactly, are they? Six Sigma 24
H Six Sigma Tools - Alturnate Tools such as FMEAs & Control Charts Six Sigma 9
Marc Six Sigma - Statistical Tools - Valid or Hype? Value? Can a CQE do the same? Six Sigma 204
C 8.5.1.1 Control of Equipment, Tools, and Software Programs - Questions about the extent of control of NC programs AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
R FOD Risk Assessment - What tools would you recommend for assessing FOD risk? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
Bev D MSA Tools Misc. Quality Assurance and Business Systems Related Topics 3
K Software Validation for Measurement Tools used in Process Validation ISO 13485:2016 - Medical Device Quality Management Systems 2
cscalise Suggestions for MDR Auditing tools EU Medical Device Regulations 1
adir88 Tools for Normal and Fault Conditions ISO 14971 - Medical Device Risk Management 9
J Are DAM tools, Mobile application, clinical dashboard, etc. considered accessories to medical device or supportive functions? Manufacturing and Related Processes 4
M Defining frequency of measurement tools callibration Calibration and Metrology Software and Hardware 3
F How do you add accuracies for tools with different measurement devices? General Measurement Device and Calibration Topics 1
B Seven Basic Quality Tools (January 23) [Paid] Training - Internal, External, Online and Distance Learning 1
K PCI DSS - MS Paint and other screenshot tools Other ISO and International Standards and European Regulations 0
DuncanGibbons Are there aerospace standards for the development and manufacture of euipment and tools? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
A The latest revision number and changes in automotive core tools IATF 16949 - Automotive Quality Systems Standard 1
G ISO 9001 and ISO 17025 - Measuring tools not in calibration system General Measurement Device and Calibration Topics 3
S Tools and equipment provided by customer - Considered as external provider? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
S I have just purchased the all new Core Tools Software (CTS) from AIAG IATF 16949 - Automotive Quality Systems Standard 37
M Informational FDA Qualifies First Biomarker Test as Part of Medical Device Development Tools (MDDT) Program Medical Device and FDA Regulations and Standards News 0
A Statistic Tools to Know Capability of Sealing Machine for Seal Width Capability, Accuracy and Stability - Processes, Machines, etc. 3
M Interesting Discussion Surface Cleanliness Real Time Test Tools General Measurement Device and Calibration Topics 2
R Unsecured pedestal mounted tools, oh my! Human Factors and Ergonomics in Engineering 11
H Evaluate Contingency Plan for Equipment and Tools IATF 16949 - Automotive Quality Systems Standard 4
I Tool maintenance and calibration procedure - Calibrating tools/equipment AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
O Storage of Calibrated Tools General Measurement Device and Calibration Topics 12
S Reference calibration tools (traceable to NIST) that are not used in production ISO 13485:2016 - Medical Device Quality Management Systems 4
L Radius Measuring Tools General Measurement Device and Calibration Topics 4
Q Analyzing Process Bottlenecks Tools ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 16
Y Differences between the Classic 7 QC Tools and New QC Tools Quality Tools, Improvement and Analysis 3
Q Risk Tools in ISO 31010 - Root Cause Analysis vs. Cause-and-effect Analysis ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
Q Tools for Risk - ISO 9001:2015 - Suggestions ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
J Pneumatic & Electrical Torque Tool - Calibration/Verification of 'Power Tools' General Measurement Device and Calibration Topics 2
B Kaizen Event - Which tools to use? Lean in Manufacturing and Service Industries 8
I What are considered next generation ITSM tools? IT (Information Technology) Service Management 1
S AS9100C 8.2.2 - Selected Tools & Effectiveness of IA Process and Performance AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
R Cleaning validation for Molding Tools? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 2
G FRACAS Tools Problem Solving, Root Cause Fault and Failure Analysis 1
A What are methods and tools to measure Workload analysis ? Human Factors and Ergonomics in Engineering 1
P IT tools for Knowledge Sharing in a large Organization Misc. Quality Assurance and Business Systems Related Topics 1
O Lean Tools in Labour Intensive Manual Manufacturing Lean in Manufacturing and Service Industries 20
D Contact Retention Tools Question General Measurement Device and Calibration Topics 3
E Methods in Measuring Angles or Checking Angles for tools? General Measurement Device and Calibration Topics 10
A Calibration of Non-Measurement Tools (e.g.: Hydraulic Jacks) Capability, Accuracy and Stability - Processes, Machines, etc. 5
sagai New Draft Guidance for Medical Device Development Tools Other US Medical Device Regulations 3
D 21 CFR 11 Tools Validation - Electronic Document and Records Control Qualification and Validation (including 21 CFR Part 11) 5
L Requirements for employees personal precision measuring tools ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
Q Production Planning Templates, Tools & Techniques Document Control Systems, Procedures, Forms and Templates 1
T What tools are there to monitor a Manufacturing Process or Operation? Quality Tools, Improvement and Analysis 2

Similar threads

Top Bottom