Hello everyone,
I want to start by saying this site is remarkable thank you all so much for helping me with my questions. I have a question on torqueing assemblies that I can't seem to find the best way to inspect and record the operation. I am required to use sampling plan mil-std-1916 to inspect a assembly line for torqueing the assemblies 1/12. The customer in an auidit said that 1/12 does not mean I could check 2/24 or so on it has to be 1/12. What I have been doing is shuting down the line every 12th part and haveing an inspector check the part for the torqueing and then the line may resume. This takes a lot of down time. The torque wrench the operators uses is calibrated so I thought I could check the first and last part off the line and as long as they were good and the torque wrench was ok in calibration the parts ran that day would have to be good but, that was not good enough for the customer. I am looking for any other ways I could set this up so the line flows better and the inspector could be freed up to do other inspections. The customer will not let operators do the check and sign they did it with records to justify the operator did it it must be an inspector. Any Ideas?
Thank you,
diptankd
 
Elsmar Forum Sponsor

Coury Ferguson

Moderator here to help
Staff member
Super Moderator
#2
Hello everyone,
I want to start by saying this site is remarkable thank you all so much for helping me with my questions. I have a question on torqueing assemblies that I can't seem to find the best way to inspect and record the operation. I am required to use sampling plan mil-std-1916 to inspect a assembly line for torqueing the assemblies 1/12. The customer in an auidit said that 1/12 does not mean I could check 2/24 or so on it has to be 1/12. What I have been doing is shuting down the line every 12th part and haveing an inspector check the part for the torqueing and then the line may resume. This takes a lot of down time. The torque wrench the operators uses is calibrated so I thought I could check the first and last part off the line and as long as they were good and the torque wrench was ok in calibration the parts ran that day would have to be good but, that was not good enough for the customer. I am looking for any other ways I could set this up so the line flows better and the inspector could be freed up to do other inspections. The customer will not let operators do the check and sign they did it with records to justify the operator did it it must be an inspector. Any Ideas?
Thank you,
diptankd
Could you provide line speed information of the Torquing process? What I mean is, how many parts in 30/60 minutes are torqued.

I guess my other question would be: Why is the production line shut down during the inspection of the torquing? Couldn't you just remove the assembly at an interval of 1 out of every 12 torqued, as long as you know the amount of parts/assemblies that were done in 1 manufacturing day or every hour. If there is a failure, separate and segregate the group of parts and verify at a 100%

Added: What is your rejection rate of the torqued assemblies?
 
Last edited:
B

Benjamin28

#4
Coury's suggestion is quite valid, and I would echo his question as to why the line needs to be shut down for what sounds like a fairly simple inspection.

As to making changes to the inspection itself, it sounds as if your customer has left little room for interpretation, you have a sampling specification of 1/12 and a customer requirement that qualified inspectors perform the inspection....so the only option I can see is working with the customer to find something that is more efficient on your end and still satisfies their quality requirements. The best possibility that comes to my mind is spc of the torque inspections. Good solid statistical data is difficult to argue with and accomplishes the same goal while reducing commitment of inspection time after capability is established.

Personally I would find it annoying that production personnel aren't allowed to perform the torque inspections...seems like a silly requirement to me.
 
D

diptankd

#5
The line does about 40 parts in 30 minutes, The reason the line is stoped is there is one fixture for this operation and one inspector, also the inspector checks other requirements on the same line at a different station. I am limited on room. The line stops so the inspector does not get so backed up he rushes to catch up and makes simple mistakes. My budget only allows me to have one inspector on this line. The reason I don't take 1/12 out and then inspect at the end of the day is that the parts are packed up and palletized as the line goes, so if there is a problem it could be found then and packing materials are not lost.
Hope this helps
diptankd
 
V

vandenbar

#6
Dip,

My two cents is determine how much the downtime costs you and if you can, justify some new equipment that can record all of your torque results. DC electric torque tools usually won't break the bank and they can be programmed to stop if they over or under torque. They can also be tied into PLC's that can stop a production line if a part is not assembled to spec. A tool like this could eliminate your inspection entirely (if your customer agrees). You could even go as far as have all of the torque values linked to the specific assembly through a database. My experience is with Atlas Copco tools but there are others out there.

If you can't justify new torque equipment, could you modify the line so you can take the part to be inspected off line and keep production going?
 

Coury Ferguson

Moderator here to help
Staff member
Super Moderator
#7
Dip,

My two cents is determine how much the downtime costs you and if you can, justify some new equipment that can record all of your torque results. DC electric torque tools usually won't break the bank and they can be programmed to stop if they over or under torque. They can also be tied into PLC's that can stop a production line if a part is not assembled to spec. A tool like this could eliminate your inspection entirely (if your customer agrees). You could even go as far as have all of the torque values linked to the specific assembly through a database. My experience is with Atlas Copco tools but there are others out there.

If you can't justify new torque equipment, could you modify the line so you can take the part to be inspected off line and keep production going?
Valid point (emphasis added in bold).

diptankd said:
The line does about 40 parts in 30 minutes, The reason the line is stoped is there is one fixture for this operation and one inspector, also the inspector checks other requirements on the same line at a different station. I am limited on room. The line stops so the inspector does not get so backed up he rushes to catch up and makes simple mistakes. My budget only allows me to have one inspector on this line. The reason I don't take 1/12 out and then inspect at the end of the day is that the parts are packed up and palletized as the line goes, so if there is a problem it could be found then and packing materials are not lost.
Hope this helps
diptankd
My question still remains: What is your rejection rate of torqued assemblies?

As for Downtime verses costs of different equipment: This would have to be calculated (Downtime in $$$$), cost of packing material (in $$$$), and profit margin (in $$$$). These are just a few of what would need to be addressed.

As for the customer requirements: As far as I see it, they require that you sample 1 out 12 assemblies, not beginning and end of shift. Now if you are able to support, with statistics or some other form of documentation to your customer, they may change their requirements, which is their choice.
 
D

diptankd

#8
I also forgot to say, I,m sorry I have alot going on today and my mind is full, but the parts get loctite on the threads and they have to be checked with in the drying time witch is 5 minites. Once it is dried you can't check the torque the parts are loctied down.
thanks,
diptankd
 

Al Rosen

Staff member
Super Moderator
#9
I also forgot to say, I,m sorry I have alot going on today and my mind is full, but the parts get loctite on the threads and they have to be checked with in the drying time witch is 5 minites. Once it is dried you can't check the torque the parts are loctied down.
thanks,
diptankd
Then who cares? With Loctite they're not loosening.
 

Coury Ferguson

Moderator here to help
Staff member
Super Moderator
#10
I also forgot to say, I,m sorry I have alot going on today and my mind is full, but the parts get loctite on the threads and they have to be checked with in the drying time witch is 5 minites. Once it is dried you can't check the torque the parts are loctied down.
thanks,
diptankd
Well, that is important information.

But if I understand Loctite (I have used various grades) it can be broken based on the specific type, and may or may not damage the parts.

Than let the production line perform the torquing inspection, but still have you inspectors validate the results. But that still should not stop the production line.

Please tell me what your rejection rate is on the torqued assemblies?
 
Thread starter Similar threads Forum Replies Date
E AS9102 FAI - What makes a COTS modified? (PCB assemblies) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 11
E IPC/WHMA-A-620C: Requirements and Acceptance for Cable and Wire Harness Assemblies Other ISO and International Standards and European Regulations 2
K FOD (Foreign Objects and Debris) - AS9100 & Hook Assemblies AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 11
M Help with SCAR - Not all sub-assemblies had properly received a First Article Nonconformance and Corrective Action 2
R Accounting for Alternate Parts in AS9102 FAIs for Assemblies AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
T FAI (First Article Inspection) of Large Assemblies/Tooling after move to new building AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 12
W Contracting Sub-assemblies From Suppliers US Food and Drug Administration (FDA) 1
K Entering Assemblies containing Welds into IMDS RoHS, REACH, ELV, IMDS and Restricted Substances 4
L Automate GR&R using Minitab on complex, multi-measurement assemblies Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 13
M Using a label bearing CE Mark on Machine Sub-Assemblies CE Marking (Conformité Européene) / CB Scheme 2
D Nadcap Certification for Printed Boards Assemblies AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
M Drilling thru sealant? Aerospace assemblies Manufacturing and Related Processes 5
M RoHS for Disposable Medical Device Assemblies RoHS, REACH, ELV, IMDS and Restricted Substances 1
S Serializing Circuit Card Assemblies (CCAs) in EPICOR Misc. Quality Assurance and Business Systems Related Topics 2
F Specification for how to measure lengths of hose assemblies Various Other Specifications, Standards, and related Requirements 1
P The use of multiple EASA FORM 1 for Multiple Assemblies EASA and JAA Aviation Standards and Requirements 2
K Implementing AS9100 Rev C - Electrical Harnesses and Cable Assemblies AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
JoCam Nadcap AC7120 (Audit Criteria for Circuit Card Assemblies) - Acceptance Criteria AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
P PPAP Requirements for Sub-Assemblies APQP and PPAP 6
S FAI (First Article Inspection) during Assembly of Sub-Assemblies Only AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
K AS9102 Form 3 for Assemblies - Verification that the Assembly is Correct AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
V HALT vs. HASS (acronyms) - Tests for PCB and Cable Assemblies Inspection, Prints (Drawings), Testing, Sampling and Related Topics 1
P Loctite as Manufacturing Material use in Medical Device Assemblies 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 12
K Using a Tape Measure for +/- 1/16" Tolerance - Large Welded Assemblies (6 to 12') Inspection, Prints (Drawings), Testing, Sampling and Related Topics 12
I Traceability Method for Assemblies in a Continuous Production Line Manufacturing and Related Processes 3
M Preventing Missed Welds on Assemblies Manufacturing and Related Processes 4
Q Traceability by Physical Marking for Cable Assemblies Manufacturing and Related Processes 3
B Revision Control of PCBs (Printed Circuit Board) and Printed Circuit Board Assemblies Manufacturing and Related Processes 6
somashekar Wavelength Shift in Emitter Assemblies - Causes Manufacturing and Related Processes 1
R Customer Audit - C.A.S.E. Standard 1-A vs. AS9110 - Aircraft Assemblies Maintenance AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 9
S Go/No-go Length Gauges - Length checking of beam assemblies General Measurement Device and Calibration Topics 2
R Grandfathering assemblies under FAI - Aerospace suppliers AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 10
G APQP (advanced product quality planning) for cable assemblies APQP and PPAP 1
N Inspection Criteria for Foreign Objects in LCD Assemblies needed Various Other Specifications, Standards, and related Requirements 2
Z Non Conforming Material Process for Mechanical and Electrical Assemblies Nonconformance and Corrective Action 2
apestate Working with part numbers in assemblies - Is there a standard for part numbers? Document Control Systems, Procedures, Forms and Templates 6
M How Many Expected Defective Assemblies? Six Sigma 1
J Interchangeability analysis - Interchangeability between units and its assemblies Various Other Specifications, Standards, and related Requirements 1
P What is Milliohms Typical? Cable assemblies for vehicles Manufacturing and Related Processes 6
W How do I manage Suppliers of raw materials, parts and/or assemblies? Supplier Quality Assurance and other Supplier Issues 17
M 8.2.4 Monitor and Measure Question - Re: Sub-Assemblies and Level of Detail Required ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 11
E Clause 7.3 - Verification and validation of the sub assemblies and the final product? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
M Electrical Assembly Standards - IPC-A-610 "Acceptability for Electronic Assemblies" Various Other Specifications, Standards, and related Requirements 7
X Need help / feedback on Xbar/R charts and Cpk/Ppk applicability - Assemblies Capability, Accuracy and Stability - Processes, Machines, etc. 11
S Reliability Prediction of Complex Assemblies Reliability Analysis - Predictions, Testing and Standards 2
L tracking sub-assemblies QS-9000 - American Automotive Manufacturers Standard 2
T PPAPs for job shops that produce short run assemblies (i.e 100 to 10,000 units) APQP and PPAP 9
K Weld Inspection of Assemblies - Agricultural spreaders manufacturer Inspection, Prints (Drawings), Testing, Sampling and Related Topics 11
M Quality plan / R&M format - Welding assemblies, hemmer assemblies, fastening systems APQP and PPAP 2

Similar threads

Top Bottom