Torqueing assemblies

D

diptankd

#11
My rejection rate is 2 out of 100,000. Regardless, the customer will not decrease the sample size. This is a defence contract the customer is very meticulous and so are we. This is why we must follow the 5 minite drying window to check the torque.
hope this helps
diptankd
 
Elsmar Forum Sponsor

Kales Veggie

People: The Vital Few
#12
Dip,

I agree with vandenbar suggestion. The DC torque (using Atlas Copco) tools are great. Operators get green light when torque is good. DC tools are wired so that when the torque fails, the line stops and an alarm goes off.

I know of a plant that produces for DOD and is using DC torque tools.
 

Coury Ferguson

Moderator here to help
Staff member
Super Moderator
#13
My rejection rate is 2 out of 100,000. Regardless, the customer will not decrease the sample size. This is a defence contract the customer is very meticulous and so are we. This is why we must follow the 5 minite drying window to check the torque.
hope this helps
diptankd
Well...then you need to do what you feel is best.

However, I use to be a Government Quality Assurance Representative (QAR) for 7 Years (for the Department of Defense now called DCMA) and if the documentation could support a change, then I would go back to the Procurement Contracting Officer (PCO) and ask for the change. In about 6 out 10 times (60%), I got the changes done.
 
Thread starter Similar threads Forum Replies Date
E AS9102 FAI - What makes a COTS modified? (PCB assemblies) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 11
E IPC/WHMA-A-620C: Requirements and Acceptance for Cable and Wire Harness Assemblies Other ISO and International Standards and European Regulations 2
K FOD (Foreign Objects and Debris) - AS9100 & Hook Assemblies AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 11
M Help with SCAR - Not all sub-assemblies had properly received a First Article Nonconformance and Corrective Action 2
R Accounting for Alternate Parts in AS9102 FAIs for Assemblies AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
T FAI (First Article Inspection) of Large Assemblies/Tooling after move to new building AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 12
W Contracting Sub-assemblies From Suppliers US Food and Drug Administration (FDA) 1
K Entering Assemblies containing Welds into IMDS RoHS, REACH, ELV, IMDS and Restricted Substances 4
L Automate GR&R using Minitab on complex, multi-measurement assemblies Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 13
M Using a label bearing CE Mark on Machine Sub-Assemblies CE Marking (Conformité Européene) / CB Scheme 2
D Nadcap Certification for Printed Boards Assemblies AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
M Drilling thru sealant? Aerospace assemblies Manufacturing and Related Processes 5
M RoHS for Disposable Medical Device Assemblies RoHS, REACH, ELV, IMDS and Restricted Substances 1
S Serializing Circuit Card Assemblies (CCAs) in EPICOR Misc. Quality Assurance and Business Systems Related Topics 2
F Specification for how to measure lengths of hose assemblies Various Other Specifications, Standards, and related Requirements 1
P The use of multiple EASA FORM 1 for Multiple Assemblies EASA and JAA Aviation Standards and Requirements 2
K Implementing AS9100 Rev C - Electrical Harnesses and Cable Assemblies AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
JoCam Nadcap AC7120 (Audit Criteria for Circuit Card Assemblies) - Acceptance Criteria AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
P PPAP Requirements for Sub-Assemblies APQP and PPAP 6
S FAI (First Article Inspection) during Assembly of Sub-Assemblies Only AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
K AS9102 Form 3 for Assemblies - Verification that the Assembly is Correct AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
V HALT vs. HASS (acronyms) - Tests for PCB and Cable Assemblies Inspection, Prints (Drawings), Testing, Sampling and Related Topics 1
P Loctite as Manufacturing Material use in Medical Device Assemblies 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 12
K Using a Tape Measure for +/- 1/16" Tolerance - Large Welded Assemblies (6 to 12') Inspection, Prints (Drawings), Testing, Sampling and Related Topics 12
I Traceability Method for Assemblies in a Continuous Production Line Manufacturing and Related Processes 3
M Preventing Missed Welds on Assemblies Manufacturing and Related Processes 4
Q Traceability by Physical Marking for Cable Assemblies Manufacturing and Related Processes 3
B Revision Control of PCBs (Printed Circuit Board) and Printed Circuit Board Assemblies Manufacturing and Related Processes 6
somashekar Wavelength Shift in Emitter Assemblies - Causes Manufacturing and Related Processes 1
R Customer Audit - C.A.S.E. Standard 1-A vs. AS9110 - Aircraft Assemblies Maintenance AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 9
S Go/No-go Length Gauges - Length checking of beam assemblies General Measurement Device and Calibration Topics 2
R Grandfathering assemblies under FAI - Aerospace suppliers AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 10
G APQP (advanced product quality planning) for cable assemblies APQP and PPAP 1
N Inspection Criteria for Foreign Objects in LCD Assemblies needed Various Other Specifications, Standards, and related Requirements 2
Z Non Conforming Material Process for Mechanical and Electrical Assemblies Nonconformance and Corrective Action 2
apestate Working with part numbers in assemblies - Is there a standard for part numbers? Document Control Systems, Procedures, Forms and Templates 6
M How Many Expected Defective Assemblies? Six Sigma 1
J Interchangeability analysis - Interchangeability between units and its assemblies Various Other Specifications, Standards, and related Requirements 1
P What is Milliohms Typical? Cable assemblies for vehicles Manufacturing and Related Processes 6
W How do I manage Suppliers of raw materials, parts and/or assemblies? Supplier Quality Assurance and other Supplier Issues 17
M 8.2.4 Monitor and Measure Question - Re: Sub-Assemblies and Level of Detail Required ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 11
E Clause 7.3 - Verification and validation of the sub assemblies and the final product? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
M Electrical Assembly Standards - IPC-A-610 "Acceptability for Electronic Assemblies" Various Other Specifications, Standards, and related Requirements 7
X Need help / feedback on Xbar/R charts and Cpk/Ppk applicability - Assemblies Capability, Accuracy and Stability - Processes, Machines, etc. 11
S Reliability Prediction of Complex Assemblies Reliability Analysis - Predictions, Testing and Standards 2
L tracking sub-assemblies QS-9000 - American Automotive Manufacturers Standard 2
T PPAPs for job shops that produce short run assemblies (i.e 100 to 10,000 units) APQP and PPAP 9
K Weld Inspection of Assemblies - Agricultural spreaders manufacturer Inspection, Prints (Drawings), Testing, Sampling and Related Topics 11
M Quality plan / R&M format - Welding assemblies, hemmer assemblies, fastening systems APQP and PPAP 2

Similar threads

Top Bottom