Hey guys, I am looking to close a minor that I received during our audit. Our auditor hit us up for not discussing potential field failures of our products. We are a laser cutting job shop that does mainly ISO work, but we do have some small GM work (Cutting one hole in a stamped part for example). We do not control any of the design, so We do not have any idea most of the time what the content that we are putting in does. Many parts, we do not even know what they are for. How am I supposed to discuss field failures when I do not even know what the part is for? Even if I know what the content I am cutting is for, how can I determine field failures. Say I am cutting a hole in a fender for a turn signal light...If the hole is too big, the light will fall out. If the hole is too small, the light can not be installed. Beyond this, I have no idea. Please enlighten me.
 
Elsmar Forum Sponsor

Stijloor

Staff member
Super Moderator
#3
Please enlighten me.
The auditor is correct. Even though you are not product design responsible, you are for process design. So, during process FMEA, you assess if a process failure could potentially cause a field failure. Your example of a light falling out is a (potential) field failure. Both actual and potential field failures must be escalated to Top Management for Management Review. All that is required is that you have considered it during Process FMEA.

Hope this helps.
 

Sidney Vianna

Post Responsibly
Staff member
Admin
#4
I still beg to differ. Any "machine shop", build to print type supplier who has no idea of where and how the component will be used at, would be doing just speculative engineering, as they can not realistically assess how the component might fail, since they have no knowledge of expected life cycle, stresses, dynamic loads, shock loads, etc. their part(s) will be subjected to.

The TS standard talks about potential failure modes to be reviewed during the management review. Failure modes are, obviously, product related.
 

LUV-d-4UM

Quite Involved in Discussions
#5
We have the same situation. My suggestion is to cover all the agenda items in the Management Review for TS16949 and just say No field failures to report and no action items to follow-up. Full stop.
 
I

in_cr_ove

#8
auditor's observation is right. it calls for reviewing the process FMEA to include the potential field failures as you may not be design responsible.
 

Helmut Jilling

Auditor / Consultant
#9
I still beg to differ. Any "machine shop", build to print type supplier who has no idea of where and how the component will be used at, would be doing just speculative engineering, as they can not realistically assess how the component might fail, since they have no knowledge of expected life cycle, stresses, dynamic loads, shock loads, etc. their part(s) will be subjected to.

The TS standard talks about potential failure modes to be reviewed during the management review. Failure modes are, obviously, product related.
I agree. Implicit in most of the TS requirements is they apply to the degree that is reasonably applicable to your situation. Whether the standard states "as applicable" or not, it can only apply where it applies. You can't be expected to imagine what effects the part might have beyond your knowledge of how the customer intends to use it. That is why the design responsible customer is supposed to provide a Design FMEA, which of course, they don't bother doing.

But, you have to address it in Mgt Review, and detail in your FMEA what risks you were able to identify which could affect the assembly line or he end user. So you will have some features. If you can envision certain field failures, then list those as well.

Don't overthink it, but don't underthink it either.
 
B

boxerjoe

#10
We include this statement in our MR meeting minutes: *No End User Field Failures, Product Recalls or Warranty Issues were reported*. 3 different auditors have all had positive comments...
 
Thread starter Similar threads Forum Replies Date
W IATF 16949 Clause 6.1.1 - My first Major NCR (Management Review) IATF 16949 - Automotive Quality Systems Standard 57
B IATF 16949 Clause 9.3.2.1 - Management Review Inputs IATF 16949 - Automotive Quality Systems Standard 1
S TS 16949 Clause 4.2.3.1 - Process to assure timely review - Two weeks IATF 16949 - Automotive Quality Systems Standard 2
S TS 16949 Clause 5.6 - Management Review Requirements - Without a meeting? IATF 16949 - Automotive Quality Systems Standard 17
M Manufacturing Process Design and Development Review - TS 16949 Clause 7.3.4 IATF 16949 - Automotive Quality Systems Standard 12
C What to review in Proprietary Designs? TS 16949 Clause 7.1.4 Design and Development of Products and Processes 0
X TS 16949 Clause 5.5.3 Internal Communication - Continuous Management Review Meetings? Management Review Meetings and related Processes 6
Q Management Review Requirements - TS 16949 Clause 5.6.1 Management Review Meetings and related Processes 17
earl62 IATF 16949 Clause 9.1.1.1 - What is the batch conformance to specification method? IATF 16949 - Automotive Quality Systems Standard 3
P IATF 16949 Clause 8.4.2.3 - Justification for non-certified suppliers IATF 16949 - Automotive Quality Systems Standard 14
M IATF 16949:2016 clause 8.4.2.3 - We don't have ISO 9001:2015 certificate IATF 16949 - Automotive Quality Systems Standard 26
R Material safety data sheet (MSDS) related clause in IATF 16949 manual IATF 16949 - Automotive Quality Systems Standard 17
R IATF 16949 Clause 8.5.1.6 a) maintenance and repair facilities - Production tooling management and personnel IATF 16949 - Automotive Quality Systems Standard 4
QChas IATF 16949 Clause 8.5.1.2 - C -Standardized Work IATF 16949 - Automotive Quality Systems Standard 1
N Looking for input on the attached Process / IATF 16949 Clause Matrix IATF 16949 - Automotive Quality Systems Standard 4
R IATF 16949 Clause 6.1.2.1 - Lessons Learned and Risk Analysis IATF 16949 - Automotive Quality Systems Standard 6
L IATF 16949 Clause 9.2.2.2 Quality Management System Audit IATF 16949 - Automotive Quality Systems Standard 9
H IATF 16949 Clause 9.2.2.2 Audit System / CSR IATF 16949 - Automotive Quality Systems Standard 1
B IATF 16949 clause 7.1.5.1.1 - Statistical studies shall be conducted IATF 16949 - Automotive Quality Systems Standard 3
P Interesting Discussion IATF 16949:2016 Clause 9.2.2.3 and Layered Process Audits IATF 16949 - Automotive Quality Systems Standard 18
M Reference to IATF 16949 clause 8.4.3 in clause 8.3.4.4, Is it right? IATF 16949 - Automotive Quality Systems Standard 1
M IATF 16949 Clause 8.3.5.2 sub-clause (l) - Process maintainability requirements IATF 16949 - Automotive Quality Systems Standard 15
J IATF 16949 Clause 9.3.2.1 - How to understand "measures" IATF 16949 - Automotive Quality Systems Standard 4
J How to address IATF 16949 clause 5.1.1.1 in my Quality Manual IATF 16949 - Automotive Quality Systems Standard 6
B IATF 16949 clause 8.3.4.3 Prototype programme IATF 16949 - Automotive Quality Systems Standard 0
DeeDeeM IATF 16949 - Clause 8.5.2 Identification and Traceability IATF 16949 - Automotive Quality Systems Standard 7
A Escalation Process - IATF 16949 Clause 4.4.1.2 IATF 16949 - Automotive Quality Systems Standard 11
E IATF 16949 Clause of 8.4.3 - Approvals - Can you explain to me IATF 16949 - Automotive Quality Systems Standard 1
B IATF 16949 Clause 9.2.2.2 - Which QMS Processes are Included IATF 16949 - Automotive Quality Systems Standard 1
J What are sample documents of IATF 16949 Clause 8.6.4 a? IATF 16949 - Automotive Quality Systems Standard 2
S IATF 16949 Clause 8.3.3.3 - Documentation of all Special Characteristics in Drawings IATF 16949 - Automotive Quality Systems Standard 2
B IATF 16949 Section Clause 8.3.4.1 - Monitoring - Design and Development Input(s) IATF 16949 - Automotive Quality Systems Standard 3
B IATF 16949 Clause 8.6.2 - Layout Inspection and Functional Testing IATF 16949 - Automotive Quality Systems Standard 11
T Customer Authorization for Concession - IATF 16949 Clause 8.5.1.1 IATF 16949 - Automotive Quality Systems Standard 3
W IATF 16949 Clause 8.4.2.4.1 Second Party Audits (Supplier Management) IATF 16949 - Automotive Quality Systems Standard 45
T Record Retention Requirements - IATF 16949 Clause 7.5.3.2.1 Records and Data - Quality, Legal and Other Evidence 15
B IATF 16949 Clause 8.5.6.1.1 (Temporary Process Control Change) IATF 16949 - Automotive Quality Systems Standard 24
T Temporary Change of Process Controls - IATF 16949 Clause 8.5.5.1.1 IATF 16949 - Automotive Quality Systems Standard 16
B IATF 16949 Clause 8.4.1.2 - Supplier Selection Process - Service Providers IATF 16949 - Automotive Quality Systems Standard 11
J IATF 16949 Clause 8.7.1.7 Nonconforming Product Disposition - Scrap Rendered Unusable IATF 16949 - Automotive Quality Systems Standard 64
M IATF 16949 Clause 4.4.1.2 - Product Safety - Concept of the Title IATF 16949 - Automotive Quality Systems Standard 4
M IATF 16949 Clause 7.1.5.1.1 - What are "inspection equipment systems"? IATF 16949 - Automotive Quality Systems Standard 4
P Setup Verification in IATF 16949 Clause 8.5.1.3 IATF 16949 - Automotive Quality Systems Standard 6
D Does IATF 16949:2016 Clause 7.3 (now 8.3) Apply to "Grandfathered" Products IATF 16949 - Automotive Quality Systems Standard 4
J IATF 16949 Clause 8.7.1.7 Nonconforming Product Disposition Compliance IATF 16949 - Automotive Quality Systems Standard 38
M Exclusion of IATF 16949 Clause 4.4.1.2 - Product Safety IATF 16949 - Automotive Quality Systems Standard 2
P Problem with IATF 16949 Clause 7.2.3 Requirements (Internal Auditor Competency) IATF 16949 - Automotive Quality Systems Standard 3
M IATF 16949 Clause 4.4.1.2 - Product Safety IATF 16949 - Automotive Quality Systems Standard 13
M Compliance with IATF 16949 Clause 8.3.4.4 Product Approval Process IATF 16949 - Automotive Quality Systems Standard 2
dubrizo IATF 16949 Clause 8.7.1.6 - Customer Notification - Your Inputs Requested IATF 16949 - Automotive Quality Systems Standard 4

Similar threads

Top Bottom