I would like to add a question, may I? 
What is the way to inform customer if requirements are not met in a layout inspection?
Still I have two cases that I'll explain:
1 - A layout inspection is done and some of the drawing specifications didn't match (e.g. diameter below spec.). This specifications are not critical or safety characteristics. Should I inform customer or just do an action plan without informing customer?
2 - A layout inspection is done and some of the drawing specifications didn't match (e.g. diameter below spec.). This specifications were not considered on the current PPAP which was approved by customer, even without measuring all drawing specification (e.g. just 10 of 13 specifications ballooned. Should I inform customer or just do an action plan without informing customer?
Thank you!
Ps:This is my first post
What is the way to inform customer if requirements are not met in a layout inspection?
Still I have two cases that I'll explain:
1 - A layout inspection is done and some of the drawing specifications didn't match (e.g. diameter below spec.). This specifications are not critical or safety characteristics. Should I inform customer or just do an action plan without informing customer?
2 - A layout inspection is done and some of the drawing specifications didn't match (e.g. diameter below spec.). This specifications were not considered on the current PPAP which was approved by customer, even without measuring all drawing specification (e.g. just 10 of 13 specifications ballooned. Should I inform customer or just do an action plan without informing customer?
Thank you!
Ps:This is my first post
You need to initiate an internal corrective action, and immdiately inform your customer and discuss what is the best reaction to the situation.
Example #1 - Same answer as #1 above. Further, your PPAP process is not complete and you need to do corrective action to determine why this was missed internally. The fact the customer approved the PPAP is not a guarantee they noticed or approved this gap. That is why PPAP requires a full layout in the first place - so these descrpancies can be discussed with the customer.