Hi Folks.
We are looking at TS 16949 and were reviewing the PPAP requirements through the manual. Table 3.1 in the PPAP manual refers to Customer Notification. Point 5 indicates a new PPAP is required for Parts, Non-equivalent materials, or services.
We are not a big fish and therefore rely on purchasing of raw materials (e.g. steel) from multiple sources (Distributers).
Can you clarify what would constitute a new PPAP submission with materials vs. suppliers? Obviously, a grade change is understandable but what about a Distributor change? If this is the case, we would need to re-PPAP every 3-4 months...
Thank you in advance.
We are looking at TS 16949 and were reviewing the PPAP requirements through the manual. Table 3.1 in the PPAP manual refers to Customer Notification. Point 5 indicates a new PPAP is required for Parts, Non-equivalent materials, or services.
We are not a big fish and therefore rely on purchasing of raw materials (e.g. steel) from multiple sources (Distributers).
Can you clarify what would constitute a new PPAP submission with materials vs. suppliers? Obviously, a grade change is understandable but what about a Distributor change? If this is the case, we would need to re-PPAP every 3-4 months...
Thank you in advance.