Just joined, sorry if this has been covered before. My question centres around the fact that PPAP is only valid for 12 months and therefore can not be submitted to a customer after that point, also TS16949 has a requirement for layout inspection (8.4.2.1), I am pushing suppliers to resubmit PPAP based on layout inspection annually, but I can not see any where in the AIAG manual a time specification or in the TS spec

Any help gratefully received
 
Elsmar Forum Sponsor

Jim Wynne

Staff member
Admin
#2
Re: PPAP/ Layout Inspection Frequency

Hi

Just joined, sorry if this has been covered before. My question centres around the fact that PPAP is only valid for 12 months and therefore can not be submitted to a customer after that point, also TS16949 has a requirement for layout inspection (8.4.2.1), I am pushing suppliers to resubmit PPAP based on layout inspection annually, but I can not see any where in the AIAG manual a time specification or in the TS spec

Any help gratefully received
Welcome to the Cove. :D

Exclusive of customer requirements to the contrary:
  • A PPAP submission is "valid" until superseded by another PPAP submission (as in the case of engineering changes, e.g.) or the part goes out of production (in which case the records must be maintained for an additional calendar year). The elements of a PPAP submission that are not affected by a change causing a subsequent submission are still "valid."
  • There is no requirement for annual PPAP or layout.
 

Stijloor

Staff member
Super Moderator
#3
Hi

Just joined, sorry if this has been covered before. My question centres around the fact that PPAP is only valid for 12 months and therefore can not be submitted to a customer after that point, also TS16949 has a requirement for layout inspection (8.4.2.1), I am pushing suppliers to resubmit PPAP based on layout inspection annually, but I can not see any where in the AIAG manual a time specification or in the TS spec

Any help gratefully received
PPAP content and submission requirements are determined by the customer.

Stijloor.
 

Jim Wynne

Staff member
Admin
#5
The only 12 month requirement I recall is if the part is "dead" for a year or more, then a new PPAP may be required.
Good point. On page 6 of the 4th Edition PPAP manual, notification (and PPAP unless otherwise specified by the customer) is required for "Product produced after the tooling has been inactive for volume production for 12 months or more."
 

qusys

Trusted Information Resource
#6
Good point. On page 6 of the 4th Edition PPAP manual, notification (and PPAP unless otherwise specified by the customer) is required for "Product produced after the tooling has been inactive for volume production for 12 months or more."
AIAG blue book indicates several causes to advice the customer with notification in case of changes.
For instance, modification of methods of test /control, modification of parameters in the same process ( for raw materials), change of suppliers of material that have impact on form, fit and function and product performance etc...
The supplier shall inform the customer responsible of the product approval about the modifications in the design and process.
Then , the customer can decide if to request or not the presentation of the documentation of a new PPAP approval.
Besides , there are some case where the supplier has the faculty of not informing the customer. However, it has the responsibility to mantain records of the changs and mantain uptated the documentation of PPAP.
For instance, one of these is the move of tool/equipment in the same manufacturing site with no change in the prodcution flow.
A criteria to inform or not the customer is that the motification to the customer is due each time from, fit, function and performance of the product are affected.
hope this helps:bigwave:
 
B

Brian R Burke

#7
Thanks for the prompt response Gents, think it was just customer requirements in the past and I assumed that it was linked to the layout requirements in TS

Thanks again

B
 
I

isotsadmin

#8
Hi Everyone,
I work for a semiconductor mfg company which is certified to ts and the reliability monitoring process calls for an annual plan for all parts from each product groupings aside from the package reliability. we dont have customer requirement specifying so and I believe we should only comply to the ts 8.2.4.1. it is ok to do it on a frequency that is defined by the organization thru a 2 year plan instead of annual?
 
S

Stepbosq

#9
answer a bit late, but I just found your post looking for the same topic. I recommend you to have a look a ths very similar discussion:
TS does not use the term "product requalification". What you are refrring to is possibly "Layout Inspection" specified under 8.2.4.1.

TS does not specify any set frequency for layout inspection. Check carefully what your CSRs say before imposing any set frequency on yourself.

Main purpose of undertaking layout inspection is to have a crosscheck on parameters that are "assumed" to be OK based on the tooling being OK (simplest example - corner radius). But the tooling, machines.. are subject to wear and tear. The parameters may deteriorate. Catch them before they go out of control. So, usage of the machine and toolings should normally decide your frequency unless it is imposed on you by a CSR. With 2500+ products, once a year will be too frequent for most produts.

When undertaking layout inspection, do it on a sample piece that has already been checked for the routine inspection and testing parameters. That reduces your workload to checking the parameters uncovered by your quality plan.

You may specify your frequency for layout inspection as "one piece from the first lot every calendar year". That enables you to reduce your inspection by picking an already inspected piece and by not bothering about something not produced during that year.

I would also advise you to write an NC for this purpose, commit CA starting today and start doing it. Forget a backdated exercise if you are thinking of one.
This might help you in your agumentation against your customers...:cfingers:
 
Thread starter Similar threads Forum Replies Date
K TS 16949 Planning Phase: Raw Materials purchased from Distributer and the PPAP impact IATF 16949 - Automotive Quality Systems Standard 3
Q What to do instead of PPAP for non ISO TS 16949 Certified Supplier? APQP and PPAP 23
Q Supplier PPAP - TS 16949 Clause 7.3.6.3: For what products? IATF 16949 - Automotive Quality Systems Standard 19
M How to implement ISO/TS 16949:2009 when customers do not require PPAP? IATF 16949 - Automotive Quality Systems Standard 7
I Where in the TS 16949 standard is Yearly PPAP Re-Validation Required IATF 16949 - Automotive Quality Systems Standard 9
Q Supplier PPAP Requirements - TS 16949 Clause 7.3.6.3 IATF 16949 - Automotive Quality Systems Standard 12
A Are Steel & Resin Suppliers Bulk Material Suppliers - TS 16949 PPAP APQP and PPAP 6
R Does a completed PPAP have to exist for TS 16949 registration IATF 16949 - Automotive Quality Systems Standard 3
P Internal PPAP Audit - What should I ask? Plastic parts (automotive) TS 16949 IATF 16949 - Automotive Quality Systems Standard 7
M Information about APQP, PPAP and MSI for TS 16949 implementation (student) APQP and PPAP 1
T TS 16949 PPAP Material Breakdown Analysis - Steel specifications for WSD-MIA333-A2 IATF 16949 - Automotive Quality Systems Standard 4
M PPAP differences between QS-9000 and TS 16949 APQP and PPAP 4
C What are the minimum required MSA studies for a TS 16949 PPAP? Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 3
T PPAP - Can't get signed warrant from customers - TS 16949 Audit soon APQP and PPAP 18
S Applying PPAP to Suppliers - TS 16949 Clause 7.3.6.3 Supplier Quality Assurance and other Supplier Issues 10
K TS 16949 PPAP - What it means: SQAM Forms? Supplier Quality Assurance Manual? IATF 16949 - Automotive Quality Systems Standard 4
C Is the QS-9000 requirement to maintain PPAP capability gone from TS 16949? IATF 16949 - Automotive Quality Systems Standard 6
S PPAP and ISO/TS 16949 - PPAP Submission - What are the SHALLs? APQP and PPAP 17
P IATF 16949:2016 Letter of conformity IATF 16949 - Automotive Quality Systems Standard 1
D IATF 16949 SI 10, External non-accredited lab IATF 16949 - Automotive Quality Systems Standard 4
S IATF 16949 - Summary at a glance Clause wise - changes from ISO TS IATF 16949 - Automotive Quality Systems Standard 4
T IATF 16949 Recording inspection results IATF 16949 - Automotive Quality Systems Standard 2
S IATF 16949 Supplier selection criteria 8.4.1.2 IATF 16949 - Automotive Quality Systems Standard 2
D IATF 16949 M&TE Laboratory scope IATF 16949 - Automotive Quality Systems Standard 4
M IATF 16949 SI # 10: Integrated self-calibration of measurement equipment- Needs for explanation IATF 16949 - Automotive Quality Systems Standard 2
Q ISO 9001/IATF 16949 Audit Finding Question - Document Retention IATF 16949 - Automotive Quality Systems Standard 11
J IATF 16949 Calibration/Verification records question ISO 26262 - Road vehicles – Functional safety 6
D Bulk Materials (Greases) and IATF 16949 IATF 16949 - Automotive Quality Systems Standard 11
J IATF 16949 Internal Audit question - Auditor's responsibility Internal Auditing 6
S IATF 16949 Internal Audit Example IATF 16949 - Automotive Quality Systems Standard 18
B Remote IATF 16949 audit preparation General Auditing Discussions 10
R IATF 16949 Certification for new site with transferred product--what is the impact with CSR and scorecards? IATF 16949 - Automotive Quality Systems Standard 4
B IATF 16949 Cert Expire- New certification body IATF 16949 - Automotive Quality Systems Standard 5
M IATF 16949 - Audit of Remote Location/Support Site and IT IATF 16949 - Automotive Quality Systems Standard 4
O Informational Ford Motor Company Customer Specific Requirements for IATF 16949:2016 - 08 Jan 2021 Customer and Company Specific Requirements 0
B Updated IATF 16949 - Will IATF 16949 get revised when ISO 9001:202X is released? IATF 16949 - Automotive Quality Systems Standard 4
O Release of Sanctioned Interpretations (SIs) related to Rules 5th Edition and Sanctioned Interpretations related to IATF 16949:2016 IATF 16949 - Automotive Quality Systems Standard 0
S Thoughts on managing ISO 9001, 13485, IATF 16949 and 17025 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 33
P IATF 16949 requirement - error-proofing in control plan IATF 16949 - Automotive Quality Systems Standard 3
R IATF 16949 - Outsourcing of internal audits Internal Auditing 11
eule del ayre Documented Information - Periodic Review of Documents? IATF 16949:2016 / ISO 9001:2015 IATF 16949 - Automotive Quality Systems Standard 34
Crimpshrine13 Laboratory Scope - Calibration vs. Test Methods - IATF 16949 IATF 16949 - Automotive Quality Systems Standard 3
earl62 What is the best way to control special characteristics in Control plan? Is it Mandatory to have SPC for IATF 16949? IATF 16949 - Automotive Quality Systems Standard 12
L IATF 16949 certification costs IATF 16949 - Automotive Quality Systems Standard 3
B FCA US Customer Specific IATF 16949- Critical Characteristics 8.6.2 Customer and Company Specific Requirements 0
B IATF 16949 News Six month extension on all valid IATF 16949 certs IATF 16949 - Automotive Quality Systems Standard 10
earl62 IATF 16949 Clause 9.1.1.1 - What is the batch conformance to specification method? IATF 16949 - Automotive Quality Systems Standard 3
B FCA US IATF 16949 Customer Requirements updates Customer and Company Specific Requirements 3
S Can assembly manufacturing sub-supplier be certified IATF 16949? IATF 16949 - Automotive Quality Systems Standard 6
D IATF 16949 Requirement for CMMI in a Global Company Elsmar Cove Forum Suggestions, Complaints, Problems and Bug Reports 0

Similar threads

Top Bottom