Using M-1 Software for Quality - Manual Engineering Change Order Entry

M

maxwell

#1
Greetings Eveyone:
My company currently uses a software program called M-1 It generates all of the process instructions for the manufacturing of the product( machine shop). My problem is whenever a process requires a change I need to generate an engineering change order (manually). While it is easy to change process in M-1 it's a real inefficent doing the ECO manually. The Quality modules of the software have not been validated.Anyone have any ideas?:thanks:
 
Elsmar Forum Sponsor

Marc

Hunkered Down for the Duration
Staff member
Admin
#2
It doesn't appear anyone here has/is using M-1. Unfortunately, the problem you describe is common with all-in-one software packages. They just can't give you everything you would lke.
 
Thread starter Similar threads Forum Replies Date
A What are the pros and cons of using an audit software for internal auditing? General Auditing Discussions 7
D Anyone using a cloud based QMS software? Document Control Systems, Procedures, Forms and Templates 12
M Using a Complaint Management Software (Medical Device companies) 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 2
A Statistical Software Calibration using Ford's "Sample Calibration File" Statistical Analysis Tools, Techniques and SPC 8
Marc What QMS and Regulatory Compliance Software are you using? Quality Assurance and Compliance Software Tools and Solutions 7
J Anyone using SiliconExpert Technologies Software for RoHS/REACH/CM RoHS, REACH, ELV, IMDS and Restricted Substances 1
J Implementing "Gage Control Software" Is anyone using this program? Calibration and Metrology Software and Hardware 12
K Validation of ERP/CRM Software Using Sandbox Qualification and Validation (including 21 CFR Part 11) 4
R What Monitoring Software are you using for ISMS? IEC 27001 - Information Security Management Systems (ISMS) 2
N Using ISO document number, version number in Software based solution. ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
V Plotting MTBF for More Systems in a Single Chart using Meridium 3.4.2 Software Reliability Analysis - Predictions, Testing and Standards 2
J Using purchased "Training Doc" (TQS) software - Tips/Tricks Training - Internal, External, Online and Distance Learning 7
S Medical Device Software (Firmware) Validation with using IEC62304 IEC 62304 - Medical Device Software Life Cycle Processes 21
B Using Job Shop ERP Software for a QMS Quality Assurance and Compliance Software Tools and Solutions 2
R Are you using software for REACH? RoHS, REACH, ELV, IMDS and Restricted Substances 7
M Using a Kanban Lifecycle for the Software Development IEC 62304 - Medical Device Software Life Cycle Processes 8
N Does anyone have any experience or feedback using mind mapping software? Quality Tools, Improvement and Analysis 5
J What SPC (Statistical Process Control) software is your company using? Statistical Analysis Tools, Techniques and SPC 15
S Searching for applicable Standards for a Medical Device using electronics, software Other Medical Device Related Standards 11
J Is anyone using "Costaware" Cost Reduction Software? Quality Assurance and Compliance Software Tools and Solutions 0
W Requirements for using Open Source Software in Medical Devices - IVD Medical Device IEC 62304 - Medical Device Software Life Cycle Processes 10
automoto SPC Software - Looking for recommendations (now using Gauss SPC v5.05) Quality Assurance and Compliance Software Tools and Solutions 2
D Does anyone have experience using open source software for PDM? ISO 13485:2016 - Medical Device Quality Management Systems 1
Marc The Hidden Cost of Using Microsoft Software After Work and Weekend Discussion Topics 14
P Pointers for qualifying the probes using the Calypso Software on a Zeiss General Measurement Device and Calibration Topics 4
M Anyone Using Parsec Software? Coffee Break and Water Cooler Discussions 3
Q Is anyone using FormDocs (Electronic Form-Filling Software)? Document Control Systems, Procedures, Forms and Templates 12
W What Commercial (off the shelf) QMS Software are you using - Any Recommendations? Quality Assurance and Compliance Software Tools and Solutions 14
Q Document Control Software Suggestions - Anyone using MIPSIS? Document Control Systems, Procedures, Forms and Templates 7
A Does anyone using or know about the software Visio or MS Visio? Quality Assurance and Compliance Software Tools and Solutions 8
Crusader Anyone using FastLynx software? After Work and Weekend Discussion Topics 5
D Is anyone using a commercial Configuration Management Software for AS9100? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
K What software do you use for flowcharts if using Office 2003? Quality Assurance and Compliance Software Tools and Solutions 10
sathis Warranty Analysis - We're using Excel, but Is there any specific software for WA? Quality Assurance and Compliance Software Tools and Solutions 2
G JobBoss: Anyone using this Job Shop Management Software?? Quality Assurance and Compliance Software Tools and Solutions 4
J Using Forum software as review and approval system. Document Control Systems, Procedures, Forms and Templates 9
Q Using Rational Unified Process for Medical Device Software ISO 13485:2016 - Medical Device Quality Management Systems 3
A What Electronic Document Control Software are you using? 'Canned' or In-House? Document Control Systems, Procedures, Forms and Templates 10
J Calibration Procedure for a Wavetek 9100 using Fluke Met/Calibration software Coffee Break and Water Cooler Discussions 7
T Is anyone using Process Modeling Software from ProcessModel, Inc.? Quality Assurance and Compliance Software Tools and Solutions 3
G Is Anyone Using IQ (APIS) FMEA Software? Quality Assurance and Compliance Software Tools and Solutions 12
J What Calibration Software are you using? Calibration and Metrology Software and Hardware 14
J Gage R&R Software - Does anyone have experience using Mitutoyo's "MeasurLink"? Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 5
C Is anyone using Microsoft Word for their documentation software? Document Control Systems, Procedures, Forms and Templates 10
R VisualSPC: Anyone else using this software? Resistance from experienced operators Statistical Analysis Tools, Techniques and SPC 14
B Is anyone using Impact Software? Is there something else similar? Quality Assurance and Compliance Software Tools and Solutions 1
D Risk Analysis using Monte Carlo Simulation instead of Scoring and Heat Map Risk Management Principles and Generic Guidelines 2
W Using tailoring guidelines to tailor a QMS procedure ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
Y We found out we have been using a equipment without validation for past 4 years Quality Manager and Management Related Issues 6
D Using Laboratory Notebooks in R&D and Design and Development ISO 13485:2016 - Medical Device Quality Management Systems 3

Similar threads

Top Bottom