C
chen
"job setups shall be verified whenever a setup is performed(e.g.initial run of a job,material changeover,job change,significant time periods lapsed between runs,etc.)" - from QS9K 4.9.4 P37
"setup verification
a recommended method is to produce enough product to constitute a subgroup of the size used for spc.the parts are measured and the results are entered on the control chart.if these results fall within the central third of the control limit zone,the setup can be approved for production.if the results fall in the outer two thirds,a second subgroup should be manufactured,measured,and plotted.if this point falls in the same outer two thirds,the setup should be adjusted and this sequence repeated.if the point falls in the central third,the setup can be approved for production."
- from QS9K GLOSSARY P132
I want to use the method to verify the job setup of our press production.
but there have some questions:
1.control limit zone: USL-LSL or UCL-LCL ?
2.results: all datas of subgroup or Xbar ?
they used "results" and "point",so i do not know the meaning of these words.
pls tell me if you have any information about job setup verification.
have a nice day. Mar.,28/1999
"setup verification
a recommended method is to produce enough product to constitute a subgroup of the size used for spc.the parts are measured and the results are entered on the control chart.if these results fall within the central third of the control limit zone,the setup can be approved for production.if the results fall in the outer two thirds,a second subgroup should be manufactured,measured,and plotted.if this point falls in the same outer two thirds,the setup should be adjusted and this sequence repeated.if the point falls in the central third,the setup can be approved for production."
- from QS9K GLOSSARY P132
I want to use the method to verify the job setup of our press production.
but there have some questions:
1.control limit zone: USL-LSL or UCL-LCL ?
2.results: all datas of subgroup or Xbar ?
they used "results" and "point",so i do not know the meaning of these words.
pls tell me if you have any information about job setup verification.
have a nice day. Mar.,28/1999