L
lrsiyer
LRS IYER
Hi!
Validation of processes of ISO 9001:2000 tells thru 7.5.2 that if the results are apparent only when the product use is started or subsequent verification of the result of the process could not reveal the process conformity then that process needs to be qualified. My doubt is:
1. A plastic injection moulding process making an automobile part. Drawing is available. After the process/production the operator/ supervisor is able check the product as per drawing. Is this process need to be validated? If yes why?
2. A blow moulding process which is a combination of extrusion and blow moulding. a similar thing that of No.1. Is this process need to be validated? If yes why?
3. an automobile chasis welding process for which the company is having checking method of NDT(LPT). Is this process need to be validated? If yes why?
if these things are answred then I have some more doubts about the same clause applicability.
Hi!
Validation of processes of ISO 9001:2000 tells thru 7.5.2 that if the results are apparent only when the product use is started or subsequent verification of the result of the process could not reveal the process conformity then that process needs to be qualified. My doubt is:
1. A plastic injection moulding process making an automobile part. Drawing is available. After the process/production the operator/ supervisor is able check the product as per drawing. Is this process need to be validated? If yes why?
2. A blow moulding process which is a combination of extrusion and blow moulding. a similar thing that of No.1. Is this process need to be validated? If yes why?
3. an automobile chasis welding process for which the company is having checking method of NDT(LPT). Is this process need to be validated? If yes why?
if these things are answred then I have some more doubts about the same clause applicability.