I have been assigned to go into a supplier facility to verify RCCAs for a few scars. There is no written procedure for this on our company drive and my manager just told me that what I do for this verification will be standardized at some point. I need to look at some general procedures for verifying Supplier RCCAs. Does anyone have a simple procedure I could review? HELP!:bonk::unsure:


Thanks,
Nicole
 
Elsmar Forum Sponsor

John C. Abnet

Teacher, sensei, kennari
#2
anyone have a simple procedure I could review?
Good day @NDesouza ;
Please allow me to ask, ...
1- How is your own proficiency with problem solving, root cause analysis, corrective action, recurrence prevention?
2- How is your understanding and proficiency with process control and sustainability application?

The reason I ask these is, that if you are strong in both of these areas, then you are in a great position to verify your suppliers actions. Sorry to say, a "procedure" is not really what you need. What you need is to have the aforementioned skill sets.

If you do not have these skill sets, then the onus is on your manage to make sure you are provided the training, resources, and engagement in order to develop them.

Hope this helps.
Be well.
 

outdoorsNW

Involved In Discussions
#4
Questions to ask. Adaptations will need to be made depending on the situation. Not all will apply in every situation.

Was the RCCA fully implemented? (If incomplete, has acceptable progress been made?)
Were key details documented so someone will not unknowingly change things back in the future? (ie someone in the future will know why the changes were done and hopefully will not change back.)
Were necessary corrective and preventive action documentation updates made?
Was the process (documented and undocumented) updated?
Were the physical changes made? (i.e. poka a yoke, equipment modifications, workstation layout changes, etc)
Were software, database, and machine programing changes made?
Were items needed purchased? (For capital items [equipment, major software purchases, building modifications, etc.], is the selection or design process well under way?)
Were people trained, about changed processes and documents, or to correct training deficiencies?
Are actions still in effect/in use?
If not, why?
If not still in effect,, was the original corrective action not effective or was it effective but a better way was implemented?
How many times have your products or similar products for other customers tested the corrective action?
 

Bev D

Heretical Statistician
Staff member
Super Moderator
#5
Echoing John Abnet’s post, the best way to understand a supplier’s RCCA is to be proficient in problem solving yourself. While outdoorsNW is absolutely correct in teh series of questions regarding implementation of the selected solution it is only ONE aspect of effectiveness. If teh supplier hasn’t really identified the cause or hasn’t chosen the correct solution for that cause, then implementation will have no effect. Does their root cause investigation make sense? Is it backed up by data? Does the chosen solution ‘match’ the cause? Is it appropriate? (For example simply implementing another inspection or training of operators does nothing to stop or correct the problem let alone correct the cause)
 

Cari Spears

Super Moderator
Staff member
Super Moderator
#6
I go about it the same way I do for internal RCCA verification. I don't generally go on-site, but I ask them to send the evidence to me.
 
Thread starter Similar threads Forum Replies Date
G Supplier flowdown verification of tests and revisions Supplier Quality Assurance and other Supplier Issues 0
R Supplier related drawings and verification of process requirements - Source Inspection AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 3
S SAE AS9015 Supplier Self Verification Process - Delegation Programs. AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 1
A AS9100C 7.4.3 Delegation of Verification (to a supplier for a specific circumstance) AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 5
R Delegation of Verification Activities to a Supplier - 7.4.3 Interpretation AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 10
A Purchasing Verification & Supplier Selection ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
A AS9100 - Verification of Raw Material Supplier Test Reports AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 21
L Customer Verification at Supplier?s Premises - ISO TS 16949 Clause 7.4.3 IATF 16949 - Automotive Quality Systems Standard 2
E AS9100 Interpretation - Delegation of Verification Activities to the Supplier AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 19
T What Verification Method can I use to ensure Supplier Implemented Preventive Action Nonconformance and Corrective Action 14
C Verification at the supplier's premises - ISO 9001:2000 Clause 7.4.3 Supplier Quality Assurance and other Supplier Issues 4
W Seeking Guidance Verification Test Strategy for Class B Medical Devices IEC 62304 - Medical Device Software Life Cycle Processes 1
I IATF 2016 - 8.5.1.4 Verification after shutdown due to COVID19 Process Maps, Process Mapping and Turtle Diagrams 1
M IATF 16949 8.5.1.3 Verification of job set-ups - Do we need secondary check? IATF 16949 - Automotive Quality Systems Standard 7
G Devices from IQ, OQ or PQ process to be used for verification, validation and summative? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 5
M Calibration or Verification? What terminology to use ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
Bev D Verification and Validation of Measurement Systems Misc. Quality Assurance and Business Systems Related Topics 0
A Our auditor told if we didn't have a patent we would have to do a validation or verification ISO 13485:2016 - Medical Device Quality Management Systems 6
N Design Verification & Process Validation - Statistical sample sizes Design and Development of Products and Processes 2
D Design Verification - Is testing required? Design and Development of Products and Processes 5
J Verification of purchased product / Alexa as a medical device ISO 13485:2016 - Medical Device Quality Management Systems 6
C Machine Verification Plan Manufacturing and Related Processes 2
A What to do when 100 % verification is not 100 % Manufacturing and Related Processes 5
R Design Verification Documentation ISO 13485:2016 - Medical Device Quality Management Systems 19
D 510K and Changes to Verification and Validation US Food and Drug Administration (FDA) 1
R Design verification for interim design outputs - sampling rationale ISO 13485:2016 - Medical Device Quality Management Systems 2
B Verification/release medical device modules Other ISO and International Standards and European Regulations 7
V Calibration certificate verification Qualification and Validation (including 21 CFR Part 11) 3
Ed Panek Label verification and validation US Food and Drug Administration (FDA) 5
D Testing to failure for design verification Reliability Analysis - Predictions, Testing and Standards 11
D Supplied item design verification Supplier Quality Assurance and other Supplier Issues 5
Ronen E A Rational Basis for Design Verification Design and Development of Products and Processes 5
V Which batches should or could be considered for design validation and design verification? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 0
R Medical Device Design verification sample prototype Other Medical Device and Orthopedic Related Topics 14
I Medical device Validation/Verification template ISO 13485:2016 - Medical Device Quality Management Systems 1
G KPC & KCC verification and updates FMEA and Control Plans 15
APHX02 Thread Roll Process Verification w/in AS9100 (i.e. BSP-F-69/AS8879) Manufacturing and Related Processes 2
R Plan to Volvo Cars for capacity verification in Phase 3 of PPAP Customer and Company Specific Requirements 3
F AS9100 D - Verification of purchased product - Sheet metal and aluminum extrusion stock AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 2
Prashant G AS9100 Requirement - Verification of characteristics results with drawing requirements AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 13
S Testing (Evaluation of) and Verification of Employee Color Vision Human Factors and Ergonomics in Engineering 19
G Assigning a calibration tolerance - An x-y coordinate machine - Uncertainty as my verification tolerance General Measurement Device and Calibration Topics 4
I Bench Testing & Pre-verification vs. Formal verification 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 4
M Does anyone has a good verification and validation plan template? ISO 13485:2016 - Medical Device Quality Management Systems 3
Sidney Vianna Informational AS13100 A - Delegated Product Verification Training Requirements AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 0
E Sample size for design verification of variable in single use device Design and Development of Products and Processes 19
C ICP versus AA: How to determine appropriate specification for assay method verification Qualification and Validation (including 21 CFR Part 11) 1
S Source of QMS templates including templates for design verification/design validation Document Control Systems, Procedures, Forms and Templates 2
L Document review is a kind of verification? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 5
S VoC (Verification of Conformance) ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 6
Similar threads


















































Top Bottom