We are pricing out a new redesign of a circuit and the pricing seems ok but some lead times are 12 Months out! Anyone else seeing this?
 
Elsmar Forum Sponsor

Tagin

Trusted Information Resource
#3
Yes, this is a global problem. We are getting quoted 6-12mo lead times on computer parts that a year or two ago were 0-1mo lead times. In most cases, the 6-12mo is mostly a guess by the board mfr - there is such high uncertainty about supply and allocations of chips, that they are incorporating that uncertainty into their lead times.
 

Ninja

Looking for Reality
Trusted Information Resource
#5
It goes well beyond electronic components...I'm seeing it from chemicals to HDPE bottles to 5gallon pails as well.
My local Home Depots are so far as to have bare shelves of weedkiller and spray paint...for lack of bottles and cans to put them in.

It's a mess out there, which makes it a mess in here as well. My understanding is that electronics supply chain is the core of most of it.
 

rstocum

Involved In Discussions
#6
My employer makes fabricated sheet metal parts and assemblies. We used to quote 2-4 weeks lead time. It's been 8-12 weeks for some time now. Some materials/gages are difficult to get, cost more, and have longer lead times from the mill or distributor. Components for machine maintenance/repair are at least as long a lead time. We keep hearing that it will get worse, not better. It's across the board, all industries, economy and world-wide.
 

AllTheThings

Involved In Discussions
#7
We are pricing out a new redesign of a circuit and the pricing seems ok but some lead times are 12 Months out! Anyone else seeing this?
These days, that isn't too bad...Some items are Indefinite (i.e. you better be Apple, HP, or able to flow down DPAS, etc. to have a hope). Poking around Digikey can be scary.

I feel like it is all being compounded as supply chain management has moved away from JIT, and everyone is now trying to hold (some) inventory of critical parts/components. So not only are people trying to ramp back up, but they are trying to 'fatten up' the supply chain to hedge against further disruptions.
 

Jen Kirley

Quality and Auditing Expert
Leader
Admin
#8
Resin (or more exactly the raw materials that go into it, as well as adhesives), electronics, corrugated, and very likely there are others I have not thought to mention. Trucking and ports of entry are also affected. I am fielding multiple requests to substitute parts or materials. And there's no end in sight. :(
 

Mike S.

Happy to be Alive
Trusted Information Resource
#9
Many manufacturers and customers can't get the parts they need from authorized distributors now so they are going to the "grey market" brokers for stuff (with customer approval) and the brokers are like pigs in slop right now. Prices sometimes go up daily so quotes aren't guaranteed for longer than a day. I've even seen suppliers say if you buy higher quantities the price goes up because you're limiting their ability to have some parts to sell for a higher price later on. It is crazier than I have ever experienced.
 
Thread starter Similar threads Forum Replies Date
D Estimate Sample Size for very rare event Using Minitab Software 1
S Validation Records - Very young QMS Qualification and Validation (including 21 CFR Part 11) 2
M Informational EU – Candidate List of substances of very high concern for Authorisation Medical Device and FDA Regulations and Standards News 0
M Inputs on definition of very similar processes for multi site audit sample - IAF MD1 2018 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
L What is the very first step to prepare for applying EASA POA? EASA and JAA Aviation Standards and Requirements 1
Sidney Vianna ISO seems not to be aware that ILO is not very happy with ISO's work on OHS Occupational Health & Safety Management Standards 5
J Question on very low NDC number with tolerable GRR ratio's Capability, Accuracy and Stability - Processes, Machines, etc. 7
Rincewind Clinical Evaluation of very low risk medical devices EU Medical Device Regulations 3
P Is it possible to make an educated decision using a very very small sample size? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
Y Change Management in a very complex Research Organization Misc. Quality Assurance and Business Systems Related Topics 3
Randy Very proud grandfather (Randy Dec 2016) Coffee Break and Water Cooler Discussions 7
R Working on a 510(k) that is very similar to the predicate device Other US Medical Device Regulations 4
A Can we do audit in "VERY CONFIDENTIAL DEPARTMENTS"? Quality Manager and Management Related Issues 9
S How will ISO 9001 help the machinists in a very small Machine Shop ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 23
P Very cheap Hardness Blocks unfortunately without Traceability General Measurement Device and Calibration Topics 11
R Determining the feasibility/scope for FDA IQ/OQ against a very simple application US Food and Drug Administration (FDA) 2
M Document Change Control for a Very Small Business Document Control Systems, Procedures, Forms and Templates 12
V Inference of bad predicted-R-Sq - But very good R-Sq and Adj-R-Sq. Using Minitab Software 2
R IMDS time frame submission for a very old product APQP and PPAP 1
B How to Demonstrate Stability and Repeatability in very Short Run Process AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 10
D Single-Point Scale Calibration - Very Large Scales General Measurement Device and Calibration Topics 3
B Very interesting article concerning MSA (Measurement System Analysis) Book, Video, Blog and Web Site Reviews and Recommendations 8
H Digging Up Bones - Inspector Retrieving Very Old Inspection Data Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
C Very Small OTC (Over The Counter) Pharmaceutical Company Requirements US Food and Drug Administration (FDA) 6
Stijloor American airports don't rank very well. Travel - Hotels, Motels, Planes and Trains 13
T Mercury is covered under RoHS but is not a substance of very high concern (SVHC) ? RoHS, REACH, ELV, IMDS and Restricted Substances 2
T Very effective movie about clean-up - Tool for 5S Training Lean in Manufacturing and Service Industries 4
Z IEC 60601-1-2 for very simple Medical Device Accessory IEC 60601 - Medical Electrical Equipment Safety Standards Series 4
J EDMS for Very Early Drug Development (Research/Drug Discovery) Pharmaceuticals (21 CFR Part 210, 21 CFR Part 211 and related Regulations) 4
G Very Basic PFMEA (Process FMEA) Guidelines FMEA and Control Plans 17
N What to do about very old MSDS Sheets Occupational Health & Safety Management Standards 24
Q Very Minimal Processes in ISO 9001:2008 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 6
Stijloor Video clips in VIMEO do not run very well. After Work and Weekend Discussion Topics 12
Stijloor Thank you very much!! Covegratulations 5
N Nonconforming Material (NCM) Control in very Small Manufacturing Companies ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
R Research involving a very small population (100 approx) - Help with Sampling Statistical Analysis Tools, Techniques and SPC 3
T Risk Management in a very small low tech, Class 1 Medical Device Manufacturer ISO 13485:2016 - Medical Device Quality Management Systems 3
C Device 'A' has no applicable Standard, but a very similar product 'B' does Other Medical Device Related Standards 6
Ron Rompen Very Unique Prototype Requirement - Cutting Holes in Tubing Manufacturing and Related Processes 2
smryan SVHC (Substances of Very High Concern) Declaration List Update Notices RoHS, REACH, ELV, IMDS and Restricted Substances 3
N Dehumidified (Dry) Cleanroom - Running a Cleanroom at very low RH Manufacturing and Related Processes 23
Q What's wrong with my data? MSA result showed very high % R&R Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 4
J Very Funny!! Funny Stuff - Jokes and Humour 1
G VERY easy savory baked Thanks Giving party treat Coffee Break and Water Cooler Discussions 0
N Calculating Sample Size for very low AQL AQL - Acceptable Quality Level 13
Howard Atkins A very Happy Diwali - November 2010 Covegratulations 10
R ASQ CQE Practice Exam - Do I need to score very well to pass? Professional Certifications and Degrees 17
K Very small batch validation ISO 11137 (VDmax25) ISO 13485:2016 - Medical Device Quality Management Systems 6
D Need to get design checklist in place very quickly - as advised by auditor ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
B Can Minitab 15 Chart Geometric Distributions with Very Low Defect Rates? Using Minitab Software 2

Similar threads

Top Bottom