SBS - The Best Value in QMS software

We had our Stage 2 Audit on 2/19 & 2/20....

S

SpaceCase

#1
And we passed!
:magic:
:thanx:
He said that it was the first time that he had passed anyone on their Stage 2 with ZERO findings! I am a little late in relaying this to everyone here, but I wanted to mention it and thank everyone who responded to my questions. I would still be lost without all of you!
We are now just waiting on our certificate to be delivered!
Wahoo!
 
Elsmar Forum Sponsor

somashekar

Staff member
Super Moderator
#5
Great show Spacecase, C O N G R A T U L A T I O N S ....
and now starts the maintaining and improving.
We wish you continued good luck and keep visiting here
 
Thread starter Similar threads Forum Replies Date
S Does anyone have a checklist to prepare for ISO 13485, Stage I audit? ISO 13485:2016 - Medical Device Quality Management Systems 1
Dean Bell Implementation of Controls as per SOA for Stage 2 Audit IEC 27001 - Information Security Management Systems (ISMS) 0
L Stage 2 audit - Requirement for 3 months of records ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
O ISO13485 implementation - Are internal audits expected before stage 1 audit? Design and Development of Products and Processes 3
Jacquie Collins Stage 2 Audit ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
R What happens during a Stage 1 MDSAP audit? ISO 13485:2016 - Medical Device Quality Management Systems 4
A A purpose of a Stage 1 audit - Off site document review Registrars and Notified Bodies 3
W Closing of Stage 2 Audit Nonconformances AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
E Interesting Discussion Was this the fastest ever stage 2 ISO9001:2015 audit? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 76
Q Stage 1 audit observations - documented report? General Auditing Discussions 5
K AS9100 - No NCR's or CA's during Stage 2 Audit AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 8
J Major Nonconformance on Stage 2 Audit causes to start over Stage 1? IATF 16949 - Automotive Quality Systems Standard 2
N AS9110 Audit Stage 2 - What procedures are required? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
S Root Cause - Left 5.6.2 paragraph (f) out of Quality Manual during Stage 1 Audit Nonconformance and Corrective Action 21
M What to do during a Stage 1 External Audit? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 8
S Is a Stage 1 Audit required for ISO 50001 Certification? Sustainability, Green Initiatives and Ecology 1
B Certification Body insist on evidence of Preventive Action during Stage 2 audit ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
M Implementing an AS9100 Quality System - Stage 1 Audit for AS9100 is Oct 2012 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 22
D ISO/TS 16949 Stage 2 Audit Nonconformance Against 7.6.3.1 Laboratory Scope IATF 16949 - Automotive Quality Systems Standard 8
K Internal Audits - Necessary before Stage 1 Audit? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 42
J Waiting for an Auditor after our AS9100 Stage Two Audit AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 19
C Contract Manufacturer and Stage 2 Audit for ISO 13485 ISO 13485:2016 - Medical Device Quality Management Systems 5
K Stage 1 Audit Advice for a new Lead Auditor General Auditing Discussions 5
L Is a Gauge R&R Study needed for ISO 9001 Stage 1 Audit? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
J AS9100 Rev.B Registrar Audit Plan for Stage 2 Audits AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
A Questions that auditor may ask during the certification or 2nd stage audit. ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 15
P Peer Review prior to Stage 2 Audit - Acceptable or Not? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 25
P NC from TS16949 stage 2 audit - Internal Auditing - Auditor did not record evidence General Auditing Discussions 15
T ISO 22000 Stage 1 Audit Completed Successfully Other ISO and International Standards and European Regulations 4
J What to expect during Stage 1 and Stage 2 audits - Certification Audit ISO 9001:2008 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
B Is it Compulsory to complete Management Review before Stage 1 Audit? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 22
Anerol C Stage 1 Audit for ISO 9001 and Notifying/Preparing Employees General Auditing Discussions 27
D At what stage should we proceed with manufacturing process audit? General Auditing Discussions 6
D What is the TS 16949 Stage 1 Audit Requirement on Internal Audit? Internal Auditing 16
W TS 16949 Audit - Examples of Major & Minor NC's and Observations for Stage 1&2 audit. IATF 16949 - Automotive Quality Systems Standard 11
M ISO/TS 16949 Stage 2 Audit Tips General Auditing Discussions 4
M Readiness Review Failed - Stage one audit for TS16949 IATF 16949 - Automotive Quality Systems Standard 7
L We succeeded in our stage 1 audit this afternoon! IATF 16949 - Automotive Quality Systems Standard 2
S TS 16949 Stage 2 Audit Preparedness - Need Advice General Auditing Discussions 5
A Non-conformance logged following a TS16949 Stage 2 audit - APQP Control Plan IATF 16949 - Automotive Quality Systems Standard 15
L Stage One Audit vs. Document Review - TS16949 - Need clarification IATF 16949 - Automotive Quality Systems Standard 5
P TS 16949 Audit - Stage 1 passed! IATF 16949 - Automotive Quality Systems Standard 29
B Stage 1 - Adequacy Audit (pre-assessment) - University - What do they look for? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
S We just Passed our ISO 14001 Stage 2 Audit! Miscellaneous Environmental Standards and EMS Related Discussions 17
O ISO 13485 - Is management review required before stage 1? ISO 13485:2016 - Medical Device Quality Management Systems 6
I QMS documents required at each stage of Software development IEC 62304 - Medical Device Software Life Cycle Processes 5
A Doubt on multiple inspection carrying out for same balloon number during Stage Inspection and Final Inspection? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
A Determining the Scope of the QMS during Stage 1? Registrars and Notified Bodies 11
Y Application of IEC/EN 62304 at an advanced stage of software development IEC 62304 - Medical Device Software Life Cycle Processes 4
K MDSAP Stage 1 Guidance Documents ISO 13485:2016 - Medical Device Quality Management Systems 1

Similar threads

Top Bottom