Dear Covers,

I'd like to ask your help on this and will very much appreciate your suggestions.
I am trying to establish a sampling procedure for our Final Outgoing Inspection.
Our company is producing beacons (used in PAGA system) but still assembling in small quantity.
Production activity is still irregular since we focus more on R&D.
Production schedule just depends when we have customer orders.
If we have customer order, normally quantitiy per lot is around 20.
If I will be using MIL-STD-105E:

My questions are:
1. When do you use the Special Levels (S1-S4)? Will this be applicable to us?
(From my previous company where I also worked as QA, we use General Inspection Level II
since production is regular and manufactures in high volume)
2. Is it OK to reference the sampling table for MIL-STD-105E but not use the switching rules?
3. Is there any ideal AQL for our case?

Current situation is, I am the only QA in the company.
Owner for incoming, inprocess and final outgoing inspections.
Testing done from the final outgoing inspection is the same with production.
I want to make a sampling procedure that will not be a burden since I do all inspections in the company.
Thanks
 
Elsmar Forum Sponsor
G

Geoff Withnell

#2
Dear Covers,

I'd like to ask your help on this and will very much appreciate your suggestions.
I am trying to establish a sampling procedure for our Final Outgoing Inspection.
Our company is producing beacons (used in PAGA system) but still assembling in small quantity.
Production activity is still irregular since we focus more on R&D.
Production schedule just depends when we have customer orders.
If we have customer order, normally quantitiy per lot is around 20.
If I will be using MIL-STD-105E:

My questions are:
1. When do you use the Special Levels (S1-S4)? Will this be applicable to us?
(From my previous company where I also worked as QA, we use General Inspection Level II
since production is regular and manufactures in high volume)
2. Is it OK to reference the sampling table for MIL-STD-105E but not use the switching rules?
3. Is there any ideal AQL for our case?

Current situation is, I am the only QA in the company.
Owner for incoming, inprocess and final outgoing inspections.
Testing done from the final outgoing inspection is the same with production.
I want to make a sampling procedure that will not be a burden since I do all inspections in the company.
Thanks

To answer your questions:

MIL-STD-105 (or ANSI/ASQ Z1.4 which replaces it) are really designed for on-going, steady processes. This really isn't what you have. For a set of better, IMHO, sampling plans for this situation, I would go to "Zero Acceptance Number Sampling Plans, Fourth Edition
Squeglia, Nicholas L.". These have wide acceptance and minimum sample sizes.

AQL is an often misunderstood term. The AQL is the quality level you are willing to "routinely" accept in your sampling plan. Why would you accept any level other than no defects? Obviously, you would prefer not to. The AQL is the level you will settle for, since tighter inspection would be more costly. An AQL of 1.0 means that my sampling plan will routinely accept a lot which is 1.0% defective. So setting an AQL depends on three numbers. How costly is the inspection process, and how costly/likely is a missed defective. So figuring an ideal AQL requires sirgnificant knowledge of the process.

Geoff Withnell
 
W

w_grunfeld

#3
To answer your questions:

MIL-STD-105 (or ANSI/ASQ Z1.4 which replaces it) are really designed for on-going, steady processes. This really isn't what you have. For a set of better, IMHO, sampling plans for this situation, I would go to "Zero Acceptance Number Sampling Plans, Fourth Edition
Squeglia, Nicholas L.". These have wide acceptance and minimum sample sizes.

AQL is an often misunderstood term. The AQL is the quality level you are willing to "routinely" accept in your sampling plan. Why would you accept any level other than no defects? Obviously, you would prefer not to. The AQL is the level you will settle for, since tighter inspection would be more costly. An AQL of 1.0 means that my sampling plan will routinely accept a lot which is 1.0% defective. So setting an AQL depends on three numbers. How costly is the inspection process, and how costly/likely is a missed defective. So figuring an ideal AQL requires sirgnificant knowledge of the process.

Geoff Withnell
If your typical lot size is 20 forget about sampling , do 100% !! To reach an acceptable AQL most sampling plans will tell you the sample size is almost as big as the lot. If you have to compromise do sampling at receiving or even in-process (if defects that slip through can be catched at final) but never on final, unless your lots are in the hundreds or thousands and customers agree.
Willy Grunfeld
 
G

Geoff Withnell

#4
If your typical lot size is 20 forget about sampling , do 100% !! To reach an acceptable AQL most sampling plans will tell you the sample size is almost as big as the lot. If you have to compromise do sampling at receiving or even in-process (if defects that slip through can be catched at final) but never on final, unless your lots are in the hundreds or thousands and customers agree.
Willy Grunfeld
You seem to be under the assumption that 100% inspection will catch all the defects. It will not. The only way to assure no defects is to produce no defectives. Once this is understood, then it is an economic decision to do 100% inspection, no inspection, or something in between, also known as sampling. Then it is a question of balancing the cost of inspection, probability of a missed defective (this probability is ALWAYS greater than zero if defectives have been produced) and the cost of a missed defective. If you have process controls (I don't mean inprocess inspection) that assures the product is defect free, than why would you do ANY final inspection? If you know that your process is incapable and has produced defects, then you will want to do 100% inspection to screen as many as possible out - you will NOT get them all! If your process is basically ok, but you might have excursions that cause defects - this is where sampling comes into play. How likely are the problems? How serious are the defects? How expensive is the inspection? The correct sampling plan is an economic balance of these factors.


Geoff Withnell
 

rmf180

Involved In Discussions
#5
Great point Geoff,

Often people lose the importance of prevention vs. detection. It is also important to note that 100% inspection is not 100% effective. In most cases you will find that 100% inspection is only 80% accurate. You can effectively get to 96% only by implementing 200% inspection (1-.2^2). How many companies are willing to take on the cost of 200% inspection?
 
W

w_grunfeld

#6
Great point Geoff,

Often people lose the importance of prevention vs. detection. It is also important to note that 100% inspection is not 100% effective. In most cases you will find that 100% inspection is only 80% accurate. You can effectively get to 96% only by implementing 200% inspection (1-.2^2). How many companies are willing to take on the cost of 200% inspection?
Gentlemen,
These are all very good points but irrelevant to the original question which wasn't inspection vs. prevention but what sampling plan to use. I only answered this question, namely that for irregular manufacturing lots of 20, sampling doesn't make sense. I did not say that 100% inspection is full proof. None of us has any idea what is the product , given the small lots my assumption was that it is some sort of equipment , in which case the term final inspection may refer to final test. I wouldn't sign off a piece of equipment to ship to a customer without being 100% tested regardiless what in-process or prevention methods are in place. From my background in semiconductors, the major players have the most advanced SPC and quality assurance procedures in place, yet it is unthinkable to ship an IC which is not 100% tested as the last step.
 
M

Muadh

#7
I may be mistaken here (I usually am) but, IMHO, it does not seem to me that the original question has been answered. Below is an excerpt from the standard that might provide the answer.

"Four additional special levels: S-1, S-2, S-3, and S-4, are given in the same table and may be used where relatively small sample sizes are necessary and large sampling risks can or must be tolerated.

NOTE: In the selection of inspection levels S-1,to S-4, care must be exercised to avoid AQLs inconsistent with these inspection levels. In other words, the purpose of the special inspection levels is to keep samples small when necessary. For instance, the code letters under S-1 go no further than D, equivalent to a single sample of size 8, but it is of no use to choose S-1 if the AQL is 0.10 percent for which the minimum sample is 125."

Without knowing how much is involved in inspecting a single part, it is easy to say 100% inspect because the lot size is only 20 pieces. But, what if it takes 4 hours each? And, if 100%, as we know, does not guarantee that defective parts won't be accepted, what advantage is there to do it when, if you can tolerate the risk, an S-1, AQL 1.5, sample of 8 will be sufficient?
 
Last edited by a moderator:

Wolf.K

Quite Involved in Discussions
#8
"Four additional special levels: S-1, S-2, S-3, and S-4, are given in the same table and may be used where relatively small sample sizes are necessary and large sampling risks can or must be tolerated.

NOTE: In the selection of inspection levels S-1,to S-4, care must be exercised to avoid AQLs inconsistent with these inspection levels. In other words, the purpose of the special inspection levels is to keep samples small when necessary. ?
I wonder if anyone has a hint for me where to read more about the special AQL levels 1-4. I wonder, what kind of criteria shall I use to decide to use S2 and not S1 or S3 or S4?

E.g. I have two good running processes.

Process one is running for years, we never had any troubles with quality. But we cannot do 100% inspections, as the test is destructive. We did 315 test samples (10.000 units in batch), found 0 to reject. But 315 is 0,040 level. So, According to AQL, there is no AQL of 0,0, the nearest is 0,010, and we would have to check 1250. So, AQL suggests S1 5 test samples, S2 8 test samples, S3 20 test samples, and s4 32 test samples.

Process two is new (new product), we did 100% visual inspection for the first few batches (not destructive), 10.000 each, found c=0. So, According to AQL, there is no AQL of 0,0, the nearest is 0,010, and we would have to check 1250 again.

Squeglia does not help much either, or? His "index values" are based on the AQL, but lower sample sizes required as he removed all other possibilities beside "0 1".

If I have a validated manufacturing process, how shall I calculate e.g. the in process sampling plans? Can anyone recommend good literature? Especially, I need numbers for comparision, e.g. what are typical AQLs in different industries?

Truly yours
Wolf
 

Mike S.

Happy to be Alive
Trusted Information Resource
#9
ANSI Z1.4 has some explanation of S-1 to S-4.

All sampling is based on cost vs. risk tolerance. "Typical AQLs" vary from industry to industry, customer to customer, even product to product. What does your customer expect? What is the risk if a bad part (or 10) makes it to the customer? Is your process in control? Do you monitor it using a control chart? Is there a non-destructive test (other than visual which you mention) that can help you to monitor the lot in additional to the destructive test?
 

Wolf.K

Quite Involved in Discussions
#10
ANSI Z1.4: "Four additional special levels: S-1, S-2, S-3, and S-4, are given in the same table and may be used where relatively small sample sizes are necessary and large sampling risks can or must be tolerated. Note: In the designation of insprection levels S-1 to S-4, care must be exercised to avoid AQLs inconsistent with these inspection levels.".

That is not much information. Probably, the information is passed on by hearsay...

So, I have two questions: 1. How to apply S-1 to S-4 for finished batches, and 2. how to calculate in-process sample number.

Our old process has proven to have a capability of zero defects, for years. So, we expect it to provide product without any defects, and our customers expect the same. The process is partially validated. The risk is high, as we have medical devices class III which remain within the patient. As the process steps are validated, I wonder how I should calculate sample sizes for in-process controls. On QualityDigest, Steve Wise writes in the article "How to determine in-process sampling strategies": "Generally, most textbooks use sample sizes of 1, 3, 5, and 10. In the industry these sizes have become common as well." But these numbers should be somehow be calculated by statistical methods, right?
 
Thread starter Similar threads Forum Replies Date
Y What are different Special Inspection Level 1-4 and General spesification 1-3 ? AQL - Acceptable Quality Level 0
N Visible particles inspection in powders for injections. Approaches to AQL level Pharmaceuticals (21 CFR Part 210, 21 CFR Part 211 and related Regulations) 1
A Level 1 vs. Level 2 vs. Level 3 Inspection Requirements - AS9100 Inspection, Prints (Drawings), Testing, Sampling and Related Topics 1
Q AQL - How do I determine Acceptable Quality Level (AQL) for In-Process Inspection? AQL - Acceptable Quality Level 2
B Customer Inspection Frequency and Rejection Level Criteria - Sample Lot Size AQL - Acceptable Quality Level 6
B Choosing Inspection Level and AQL AQL - Acceptable Quality Level 1
M AQL and the impact of increasing Batch Size, or changing Inspection Level AQL - Acceptable Quality Level 2
H Need help with AQL (Acceptable Quality Level) for a QC inspection AQL - Acceptable Quality Level 8
P Inspection Level Interpretation - ANSI Z1.4-2008 Inspection, Prints (Drawings), Testing, Sampling and Related Topics 4
N AQL - Sampling plan (variable, inspection level ii, normal inspection S-method) AQL - Acceptable Quality Level 2
S AQL .65 Level III - Take a particular component off 100% Inspection AQL - Acceptable Quality Level 4
T Special Inspection Level 3 (S-3) per ANSI Z 1.4 & its relationship with ISO 2859-1 AQL - Acceptable Quality Level 1
D Confidence Level II or Inspection Level? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
D Difficult Inspection Level/AQL - Verifying it is the correct part AQL - Acceptable Quality Level 5
R Identifying Inspection Level for Critical Components - Medical Devices ISO 13485:2016 - Medical Device Quality Management Systems 5
W How to choose the correct General Inspection Level & AQL level...? AQL - Acceptable Quality Level 5
T What is AQL, Inspection Level, and Type of Inspection AQL - Acceptable Quality Level 16
J Testing Potential New Hires for a Low Level Part Inspection Position Inspection, Prints (Drawings), Testing, Sampling and Related Topics 5
S Using AQL to get true random sampling using General Inspection Level II AQL - Acceptable Quality Level 4
R What is the 95 x 95 Inspection Level? Either an attribute or variables type plan Inspection, Prints (Drawings), Testing, Sampling and Related Topics 7
J Incoming Inspection Records using Excel File ISO 13485:2016 - Medical Device Quality Management Systems 2
J Requirements as a Distributor for Incoming Inspection of Purchased Finished Medical Device Medical Device Related Regulations 0
J Action Not defined in procedure - NC - Incoming inspection AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
S Annual Inspection Layout - Based on Customer print ? IATF 16949 - Automotive Quality Systems Standard 8
I Overwhelmed with attribute MSA requirement for visual inspection IATF 16949 - Automotive Quality Systems Standard 8
K Visual Inspection Effectiveness Inspection, Prints (Drawings), Testing, Sampling and Related Topics 16
B 4DINSPEC Inspection Equipment General Measurement Device and Calibration Topics 0
A Fabric roll inspection - What type of Control Chart to use? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 2
B Industrial RX inspection of welds (Oil&Gas industry) Reliability Analysis - Predictions, Testing and Standards 0
C In-process inspection - Tooling and assembly lines for automotive companies AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
D FAA inspection at my repair station - Rating Check Federal Aviation Administration (FAA) Standards and Requirements 0
G Supplier delivered recent PPAP, should he deliver yearly layout inspection? IATF 16949 - Automotive Quality Systems Standard 4
R Inspection and Work order process Inspection, Prints (Drawings), Testing, Sampling and Related Topics 9
M Determining a tolerance value for Measuring devices in-house inspection General Measurement Device and Calibration Topics 12
P Need a programmer for QVI's VMS software for optical inspection machine Inspection, Prints (Drawings), Testing, Sampling and Related Topics 0
silentmonkey How to decide what characteristics need to be verified during incoming inspection? ISO 13485:2016 - Medical Device Quality Management Systems 5
J Mechanical inspection techniques of close tolerance parts Inspection, Prints (Drawings), Testing, Sampling and Related Topics 4
T Help to Suggest name for a new certification and inspection company Coffee Break and Water Cooler Discussions 7
B GM GP-12 Exit Criteria - Additional Safe Launch Inspection - (Also see GM1927-28 ) Customer and Company Specific Requirements 2
S Process Inspection -Sub assembly process inspection sheet Lean in Manufacturing and Service Industries 3
C OEE and In-process Inspection Manufacturing and Related Processes 2
R AS9100 - 8.4.2 - Receiving Inspection Requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
I Mother bobbin final inspection criteria Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
Marc Visual Inspection - Color Vision Coffee Break and Water Cooler Discussions 15
G Inspection Logs - Asked to remove an Inspection Sheet ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
Skooma Receiving Inspection - Boss trying to save money AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 7
T Sample of 1st Article Inspection Report wanted APQP and PPAP 3
T Nonconforming product at customer detected by a routine inspection by field service Nonconformance and Corrective Action 9
A Definition of customer in ITP (Inspection & Test Plan) Contract Review Process 3
T Correct MSA study for an automated camera system which makes attribute inspection Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 1

Similar threads

Top Bottom