What is a complete system audit - ISO9001:2000

O

Oriondad

#1
Howdy yall !!!

What is considered a complete system audit?

Here is a scenario:

First, my audit schedule simply lists the 5 elements of ISO9001:2000. I have an auditor who reviews Element 7, pertaining to Validation of processes (clause 7.5.2). We complete the audit and I check it off as complete on my schedule.

Now, I do this for the remaining 4 elements (4, 5, 6, and 8), auditing a clause within the element. Is this considered a complete system audit in the eyes of a registrar.

Or,

Is it considered complete when ALL the clauses, within ALL the elements have been audited?
 
Elsmar Forum Sponsor

SteelMaiden

Super Moderator
Super Moderator
#2
Our registrar checked to make sure that all subclauses within each clause had been audited in our initial audit cycle during our certification audit.
 
O

Oriondad

#3
Thanks

I think.

Well, I guess we have to ramp things up a bit. Our intent is to audit all clauses, but we were going to focus on those clauses that need it the most. Now we will have to audit some areas that I don't feel need it, but, if we must, we must.....
 

SteelMaiden

Super Moderator
Super Moderator
#4
If you feel that there are areas that don't need it, is it because of some sort of objective evidence...if so, you are halfway there. Don't spend a lot of time on areas that are not going to get you any return, but if you don't have data to support your feelings it's just another opinion. If you have the data, obviously, someone has looked into it. document it and add it to your audits.
 
O

Oriondad

#5
Well,

I have another thread going regarding pre-assessments.

We recently went through a 4 day pre-assessement by our registrar. This generated 25 findings, under the QS standard. We are moving to the ISO standard, so many of those findings are not applicable.

BUT,

We are addressing those that are. So I do have evidence that we have examined those areas. We have basically audited every area of the QS element, but it was through pre-assessement. We have not accomplished this through internal audits, hence my question.

Also, I have been told that just touching on the 5 elements constitutes a full audit, but I don't feel confortable with that. My concern is due to what I need to accomplish for our registration audit.
 
Thread starter Similar threads Forum Replies Date
M Internal audit checksheet for TS 16949 that covers a complete system audit? Document Control Systems, Procedures, Forms and Templates 11
A Document Change Notice vs complete System re-write Manufacturing and Related Processes 4
R Creating Quality System and using it before it is complete ISO 13485:2016 - Medical Device Quality Management Systems 8
A Complete change of the ISO 9001 Quality Management System ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 12
N Visual Management System for a Complete Overview of the QMS? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 19
O Recomendations to build a complete quality management system - Documentation Way Document Control Systems, Procedures, Forms and Templates 11
A How much does a complete biocompatibility test package cost? Other ISO and International Standards and European Regulations 1
A Is there a better way to do a complete assessment of our QMS? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 8
G Best Practices for IT auditing - Is a session-id necessary for a complete audit trail? IEC 27001 - Information Security Management Systems (ISMS) 0
M How to complete structure Analysis and Function analysis sections' columns of AIAG-VDA DFMEA form FMEA and Control Plans 0
S New AIAG FMEA Process - How to complete the new format FMEA and Control Plans 32
D China - Where I can get NMPA complete structure/organogram chart and GB/YY format list China Medical Device Regulations 1
J0anne 90 Day Limit Imposed by NB to complete NCs raised at audit Preventive Action and Continuous Improvement 6
S What is considered the complete software medical device? Medical Information Technology, Medical Software and Health Informatics 6
L A Complete Control Chart Decision Tree Statistical Analysis Tools, Techniques and SPC 5
N Interesting Discussion How to Deal with Suppliers Who Refuse to Complete our ISO Survey? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 51
H FMEA sample for complete CNC machining process FMEA and Control Plans 1
B New to Metrology and told to complete Gage R&R with AIAG compliant software Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 16
P Searching for a complete audit check list based on ISO14001:2004 ISO 14001:2015 Specific Discussions 1
D What is a reasonable consulting fee for preparation of a complete traditional 510k? Consultants and Consulting 11
E Is Design Transfer to Production be complete prior to Release of first production lot 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 2
K Partial FAI on Semi-Complete Parts question ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
D When to complete FAA Form 337 (Major Repair and Alteration) Federal Aviation Administration (FAA) Standards and Requirements 4
Q Complete Company Restructuring & Impact on ISO 9001 Certification ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 8
D Steps to Complete Quality Control Plans and Work Instruction Manufacturing and Related Processes 4
E Auto Populate Date and Time in an adjacent cell to one the user will complete..... Excel .xls Spreadsheet Templates and Tools 7
F Process Maps as a complete QMS Manual ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
S Calibration conducted to 3 steps only of the std instead of complete 5 steps General Measurement Device and Calibration Topics 4
2 Complete Cycle for Complaint Process - Idea Searching Customer Complaints 7
A AS9100 rev C Skill Examiner Audit to complete my RABQSA Auditor certification Career and Occupation Discussions 3
S AS9100C Complete Internal Audit Software Package Recommendations Quality Assurance and Compliance Software Tools and Solutions 13
optomist1 Complete list of all Default Conditions for Y14.5M 1994 Inspection, Prints (Drawings), Testing, Sampling and Related Topics 4
E List of Complete EMC Test Requirements consisting of IEC, EN, Cispr, etc. General Measurement Device and Calibration Topics 2
L ISO 9001 Clause 7.3.2 Design & Development Input - Adequacy, Complete, Unambiguous ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
M Requirement to complete an MSA when doing Comparative Tests Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 2
N The Gap Analysis is complete - From which clause do I begin? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
V Issue: Suppliers charge for complete Level III PPAP package - Heat Treated Parts APQP and PPAP 16
Hami812 Minitab and Control Charting Time to Complete each Repair Over Time Using Minitab Software 8
L Records Register is not maintained and is far from complete ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 14
S Required Complete calibration SOP, calibration Plan and master list template! IATF 16949 - Automotive Quality Systems Standard 3
S AS9102 Form 1 Item 19 FAI Complete / Not Complete Box - Requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 9
F Importance of Complete Inspection Records in Aerospace Manufacturing Inspection, Prints (Drawings), Testing, Sampling and Related Topics 5
G Help needed to complete a Financial Audit of a Nonprofit Organization Various Other Specifications, Standards, and related Requirements 7
J ISO9001:2008 - What a complete joke! ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 85
L 5S Auditing & Accountibility - Keeping our 5S tool boards complete and accounted for Lean in Manufacturing and Service Industries 13
P Help Needed to complete audit hours under a Certified Lead Auditor - ISO 9001 General Auditing Discussions 5
N Basic MSA - A simple way to complete an MSA study on Dial Calipers Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 5
C Complete ISO idiot on a steep learning curve - Quality Manual Review appreciated ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
P Earned Value Calculation when you have moved forward but work is not complete Quality Tools, Improvement and Analysis 1
B Is it Compulsory to complete Management Review before Stage 1 Audit? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 22

Similar threads

Top Bottom