What is Project Scoping? Must I work with a SS Master Black Belt?

E

Eesha

#1
Dear Experts,

Greetings of the day.

Actually I would like to know in detail about the define phase of Six Sigma.
Firstly I wanted to know whether black belts can work on their own without a MBB if at all that's the case and there is no MBB for say an only Black Belt hired for the first time in a company venturing into six sigma...

Then I would like to know what is meant by Project Scoping
Who decides this...
What is the technique used to understand project scoping...

Please advice.
Regards
 
Elsmar Forum Sponsor
G

Geoff Withnell

#2
Re: What is Project Scoping? Must I work with a SS Master BB?

Dear Experts,

Greetings of the day.

Actually I would like to know in detail about the define phase of Six Sigma.
Firstly I wanted to know whether black belts can work on their own without a MBB if at all that's the case and there is no MBB for say an only Black Belt hired for the first time in a company venturing into six sigma...

Then I would like to know what is meant by Project Scoping
Who decides this...
What is the technique used to understand project scoping...

Please advice.
Regards
First, there has been a lot of discussion (at leaston the ASQ site, and I suspect here as well) about just what the is definition of "Master Black Belt".
In my organization, MBB is a position, not a certification level, and is the senior BB on a team, and has the additional duties of metoring less experienced BBs. We have some experience and training requirements before someone is given such an assignment, and some teams do not have a MBB. A BB on such a team could come to me, or some other MBB for advice and guidance when needful or desired. There are certifying bodies which do certify MBBs, but we consider ASQ to be the standard, and they don't. I know of Green Belts who have lead simple projects successfully without BB guidance, let alone MBB guidance, although I do not recommend it. A BB should be able to see most projects through without a MBB.

Project Scoping is a mutual effort between the Project Sponsor, the Team Lead/Process Owner and the BB. The Project Scope defines what is, and almost more importantly what is not included in the project. This allows for more focus on the problem at hand, and gives the team a way to say NO! to attempts at scope creep. Many SS projects have failed due to well meaning people, inside the team or out, suggesting "Wouldn't it be great if we included this in the project?" Good Project Scoping is the answer to this. One of the best (IMNVHO) methods to due scoping is to brainstorm an exhaustive list of activities and goals that are and are not within the scope of the project.

I hope this helps.

Geoff Withnell
ASQ CSSBB
Bearingpoint, Inc. MSSBB
 
E

Eesha

#3
Re: What is Project Scoping? Must I work with a SS Master BB?

Dear Expert,

Greetings for the day!

Thanks for your response.
Sir, when you conduct a brainstorming session for Project scoping, I was just thinking whether or not it would be a biased thing....
The reason being the team members would vote out the particulars that maybe say difficult to include in the project and take those ones in that maybe very simple.

I would want to see maybe an example of Project scoping done for any project so I get an idea of the same. Could you help with some please....

Regards,
Eesha
 

BradM

Staff member
Admin
#4
Re: What is Project Scoping? Must I work with a SS Master BB?

I am speaking in project general terms.

When you decide to undertake a project, you have to have the scope defined. Basically, what exactly are you wanting to accomplish, how to measure the success, what resources are to be used, etc.

While that may sound lofty, it is very easy for projects to veer off course; otherwise known as Scope Creep. When the project veers off course, the timeline extends, expenses go up, completion gets more difficult, etc. Usually by most project standards, that project is not successful.

Say someone is going to pay you $50.00 to paint the porch. Halfway through, they want to change paint color. Then, they wonder why the overhang right above the porch is not painted; after all, that's part of the porch. You will never get finished painting, and the $50.00 is nothing for the labor you exerted.

Proper project scoping would entail what they are to provide, how many coats of paint, when they will make it accessible, etc.

If other opportunities (even if they look good) arise, you must fight the temptation to take them. Those should be outlined to be undertaken under another project scope.
 
E

Eesha

#5
Re: What is Project Scoping? Must I work with a SS Master BB?

Dear Expert,

Thanks for your inputs.

Sir, would you be able to throw some insight into the duration of the different phases of the project...

I mean if the define phase should be done within a month...this needs to be preceded with the baseline data to decide that this is my project....

So what is the time and analysis that is required on the data that is there in hand...If the data is not as required for defining the improvement do we wait and collect some more data and then define....

But then by that time people become more cautious and change some things in the process then what to do....

I mean I may be sounding very confused but this is the situation I am in at present,,,,,collecting and collecting data. I know that six sigma cannot be done without data.

Please advice...
Regards,
Eesha
 
Q

QCAce

#6
Re: What is Project Scoping? Must I work with a SS Master BB?

Dear Expert,
...
So what is the time and analysis that is required on the data that is there in hand...If the data is not as required for defining the improvement do we wait and collect some more data and then define....
Eesha
Eesha,
I am no six sigma expert by any means, but I do believe that (similar to a good corrective action) it is important to have good data up front that defines the problem you are trying to solve. Otherwise it may be difficult to measure whether the improvement actually made a difference.

Dear Expert,
...
But then by that time people become more cautious and change some things in the process then what to do....

I mean I may be sounding very confused but this is the situation I am in at present,,,,,collecting and collecting data. I know that six sigma cannot be done without data.

Please advice...
Regards,
Eesha
Careful not to set a tone that implies, "we don't want any improvements made unless they are first defined as a six sigma projects."
If people make changes to improve a process before you've had enough data to show how bad it is, that can be a good thing. It may indicate that people are quality concious and are showing initiative to drive continual improvement on their own. It also probably means it was a minor problem that was easily corrected and it probably wasn't worthy of a six sigma project to begin with.
 
Thread starter Similar threads Forum Replies Date
E Zero part to part variation - Gage R&R project Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 15
L Project Managers - Questions For You Career and Occupation Discussions 0
Felony Melony Project Milestone Plan-Development to Mass Production APQP and PPAP 2
R Project Transfer to New Factory ISO 13485:2016 - Medical Device Quality Management Systems 6
S Need guidance on project ISO 13485:2016 - Medical Device Quality Management Systems 2
Sidney Vianna IATF 16949 News Update on the IATF CARA Project (“Common Audit Report Application”) - 12/2020 IATF 16949 - Automotive Quality Systems Standard 1
R Electrical contractor Project Quality Management Plan Quality Manager and Management Related Issues 1
G Should I perform Gage R&R only at the beginning of a new project? Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 6
R What's the major difference between Green Belt and Black Belt in term of training and project Six Sigma 3
Q Project Tracker - Something that shows the status of each project Pharmaceuticals (21 CFR Part 210, 21 CFR Part 211 and related Regulations) 5
M IEC 62304 Class A Project IEC 62304 - Medical Device Software Life Cycle Processes 15
K A proposal for the model Quality Management - I need help for the project ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
S How to start with ISO process in project based team - Documentation Document Control Systems, Procedures, Forms and Templates 4
qualprod ISO 9001 vs PMBOK (project management) ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
L Managing design projects: New Medical Device Project or Change Design and Development of Products and Processes 1
H FORD's project milestone acronyms Customer and Company Specific Requirements 4
R Extension of product nonconformances - Construction project Nonconformance and Corrective Action 7
M PDCA as a project tool Quality Tools, Improvement and Analysis 5
QIE Electronic IFU - new project, need input Other Medical Device and Orthopedic Related Topics 0
N Student trying to apply Lean Six Sigma on a Construction project in my thesis Lean in Manufacturing and Service Industries 3
B Will you please help me with my academic project? Repair & calibration service for test equipment ISO 17025 related Discussions 0
B [Help] Customer Engagement Survey for MBA Project - due Apr19 Manufacturing and Related Processes 0
B Help with Customer Engagement Survey for MBA Project - due Apr19 General Measurement Device and Calibration Topics 0
supadrai Aviation MRO Project facility coming to U-Tapao airport in Thailand - Help Career and Occupation Discussions 2
I GMP 21 CFR Part 11 Electronic Records Compliance Project Help Qualification and Validation (including 21 CFR Part 11) 9
S Project Management System - What do you currently use? Design and Development of Products and Processes 4
Sam Lazzara Notified Body CE Project Manager - Worst job ever? EU Medical Device Regulations 6
B How do you manage your project? Data Conversion and Digitization Records and Data - Quality, Legal and Other Evidence 9
K Implementing ISO13485:2016 in the Middle of a New Device Project ISO 13485:2016 - Medical Device Quality Management Systems 1
L Ways to improve testing on our department - Project Kickoff Misc. Quality Assurance and Business Systems Related Topics 4
A Free software similar to Microsoft Project - Any suggestion? APQP and PPAP 5
R University Research Project - Management Review Management Review Meetings and related Processes 17
E Best Ways to Close a Project APQP and PPAP 3
A How to rollout Security Awarness at Project Level in the Organisation IEC 27001 - Information Security Management Systems (ISMS) 1
G Where I could find any project HSE plan templates Occupational Health & Safety Management Standards 4
S ISO 9001:2015 Transition Project Plan example wanted ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 6
G Senior Project for BS Mechanical Engineering Student Career and Occupation Discussions 4
L KPI Project help - Business and Management Degree Benchmarking 4
N Non-conformances whilst in the Design and Development stage of a project ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 8
Richard Regalado Project Plan of New ISO 22301 BCMS Certified Company Business Continuity & Resiliency Planning (BCRP) 1
W Certification on AS9100C - FAI or PPAP? Project Management or APQP? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 11
A Application / Use of Hypothesis Testing in any Six Sigma Black Belt Project Six Sigma 8
A AS9100 Clause 7.1.1 Project Management - Process vs Project. AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
M Presentation Material for New Project Kick Off Meeting Manufacturing and Related Processes 2
V Pareto Analysis - Six Sigma - 'Productivity Improvement' project Service Industry Specific Topics 1
J Lean Transformation Project - Distribution centre in Europe Lean in Manufacturing and Service Industries 1
L Does every document on a project require a document number? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
M Conducting a Project for Safety Improvement Misc. Quality Assurance and Business Systems Related Topics 4
A Project Management Due Diligence Procedure example wanted Other ISO and International Standards and European Regulations 1
M Large Construction Project Quality Plan - ISO 9001-2008 using ISO 10006 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 18

Similar threads