SBS - The Best Value in QMS software

What is the Control Plan Characteristic Class column?

D

Domingo

#1
I am completing some control plans for a new assembly for a new Customer. My question is: What is meant for the "characteristic classsification" column?
 
Elsmar Forum Sponsor
D

D.Scott

#2
Re: Control Plans Characteristic Class

I am completing some control plans for a new assembly for a new Customer. My question is: What is meant for the "characteristic classsification" column?
Welcome to the Cove Domingo.

I have moved your post to the FMEA and Control Plan thread where I think it will get many more responses. In the meantime, look at the similar threads listed at the bottom of this page. There are some great discussions on Control Plans and what information to put in the columns.

Dave
 

Jim Wynne

Staff member
Admin
#3
Re: Control Plans Characteristic Class

I am completing some control plans for a new assembly for a new Customer. My question is: What is meant for the "characteristic classsification" column?
There are two types of characteristics: Process and Part. The former pertains to characteristics of the process which must be controlled; "feeds and speeds," as they say. The latter has to do with characteristics of the part--dimensional, appearance, e.g.--that must be controlled. In general, there should be process characteristics listed for each part characteristic, the idea being that it's a process control plan, and not an inspection plan.
 

Miner

Forum Moderator
Staff member
Admin
#4
Re: Control Plans Characteristic Class

Historically, this was intended to note KPC (product) or KCC (process) for GM, and Critical (FMVSS safety) or Significant (SPC) for Ford.
 
D

Domingo

#5
Re: Control Plans Characteristic Class

So "Characteristic Classification" is similar to if not identical to clasifying dimentions as "Critical" "Improtant" or "A, B, or C" - Correct?
 

Raffy

Quite Involved in Discussions
#8
Hi,
We were audited by an Internal Auditor and one of her findings are the following:
There is no documented control plan at different product level / material level to identify the characteristics and how to verify the control method. This is against in ISO/TS16949 Quality Management System Clause 7.5.1.1. My concern is that what could be the evidence that I need to show with the auditor? Do I have to create a procedure on how to create a control plan? Please advise.
Best regards,
Raffy:cool:
 
F

fireonce

#9
Re: Control Plans Characteristic Class

As I know, it's "Critical","Major" and "Minor".or "A""B""C",which is classed by the importance and failure severity of the characteristic.
 

Jim Wynne

Staff member
Admin
#10
Hi,
We were audited by an Internal Auditor and one of her findings are the following:
There is no documented control plan at different product level / material level to identify the characteristics and how to verify the control method. This is against in ISO/TS16949 Quality Management System Clause 7.5.1.1. My concern is that what could be the evidence that I need to show with the auditor? Do I have to create a procedure on how to create a control plan? Please advise.
Best regards,
Raffy:cool:
It sounds like what the auditor is questioning is the absence of a control plan, not the need to document how to create one, although that might also be an issue. If there was a situation wherein a control plan should have been created but wasn't, then you need to find out why it wasn't created, and how you can make sure that control plans are created in the future. This probably means that there should be a documented procedure, along with the training needed to support it.
 
Thread starter Similar threads Forum Replies Date
S Maintenence related action in Control plan FMEA and Control Plans 3
R Control Methods in Control Plan FMEA and Control Plans 4
L Looking for Control Plan and FMEA Stamping process FMEA and Control Plans 2
Jimmy123 IATF16949 Control Plan FMEA and Control Plans 1
A Prototype control plan FMEA and Control Plans 2
S Which department should prepare the control plan? could you show me a standard regarding to this matter. FMEA and Control Plans 17
G Control Plan & PFMEA Review Procedure? FMEA and Control Plans 8
P IATF 16949 requirement - error-proofing in control plan IATF 16949 - Automotive Quality Systems Standard 3
earl62 What is the best way to control special characteristics in Control plan? Is it Mandatory to have SPC for IATF 16949? IATF 16949 - Automotive Quality Systems Standard 12
I Control Plan (Product/Process specification/ Tolerance) acceptance FMEA and Control Plans 27
J Control Plan use on the manufacturing floor FMEA and Control Plans 4
E Change in control plan - Do I have to do sampling? IATF 16949 - Automotive Quality Systems Standard 1
D All Dimensions listed on control plan FMEA and Control Plans 10
DuncanGibbons Manufacturing Plan vs Material Specification vs Control Plan Manufacturing and Related Processes 5
S Should safety checks be included in the Control Plan? IATF 16949 - Automotive Quality Systems Standard 5
D Supplied Product on Control Plan - Lot ranging in 40,000 pcs per product FMEA and Control Plans 3
M Is there any pre-defined Control plan format/template acc. VDA? VDA Standards - Germany's Automotive Standards 1
G Control Plan - Include the processes for each sub component? APQP and PPAP 2
A Redesigning our process flow chart, PFMEA and Control Plan Process Maps, Process Mapping and Turtle Diagrams 4
D Link between FMEA, flow chart and control plan FMEA and Control Plans 10
M Dynamic Control Plan Draft - need review FMEA and Control Plans 2
Ashland78 IATF 16949 Control Plan Authorizations IATF 16949 - Automotive Quality Systems Standard 2
N Control plan evaluation methods - Which methods should be carried over from the PFMEA? FMEA and Control Plans 3
Rameshwar25 What is a Control Plan at "Material Level"? IATF 16949 - Automotive Quality Systems Standard 4
leftoverture Control Plan - Multiple Process Steps FMEA and Control Plans 8
O Difference Between PFMEA & Control Plan FMEA and Control Plans 3
W Purchased Part Control Plan (IATF 16949) FMEA and Control Plans 7
J VDA audit, control plan - My hair is almost gone now VDA Standards - Germany's Automotive Standards 5
Howard Atkins MSAs are now required on every feature of the control plan - IATF 16949 IATF 16949 - Automotive Quality Systems Standard 13
Jeff Putman EQI Prelaunch Control Plan - Definition Customer and Company Specific Requirements 0
V How to Add Annual Revalidation requirements to Control Plan? FMEA and Control Plans 5
N Control plan references FMEA and Control Plans 6
L Simple Example for PFMEA / Control Plan Training Training - Internal, External, Online and Distance Learning 1
J Functional group / area responsible on a Control Plan IATF 16949 - Automotive Quality Systems Standard 1
T Should Testing be a separate operation in the Control Plan? FMEA and Control Plans 5
M Annual Layout requirements for PPAP/Control Plan FMEA and Control Plans 6
T IATF 16949 Control Plan and Process Monitoring Requirement(s) IATF 16949 - Automotive Quality Systems Standard 1
J Why Control Plan Review needs to be Approved by the Customer IATF 16949 - Automotive Quality Systems Standard 1
B PFMEA and Control Plan Links APQP and PPAP 2
A Corrective Action Column in Control Plan and aligning PFD, PFMEA and Control Plan FMEA and Control Plans 6
M Control Plan MSA's - Pressure Gages IATF 16949 - Automotive Quality Systems Standard 2
S Family / Generic type of FMEA & Control Plan and Symbols FMEA and Control Plans 3
V Do I need to add everything on print to control plan? FMEA and Control Plans 1
H Control plan example format for CNC machining activities FMEA and Control Plans 3
M Mention "according to Work Instruction" in Control Plan FMEA and Control Plans 3
W Does TS16949 require MSA on all measurement systems in the Control Plan? Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 5
T Software for linking Process Flow Diagram, Process FMEA and Control Plan APQP and PPAP 9
S Attribute G&R for all Visual Controls in Control Plan Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 1
I Any recommendations on software for managing the APQP, PPAP, PFMEA, Control Plan etc? Quality Assurance and Compliance Software Tools and Solutions 2
F What goes into a Control Plan? FMEA and Control Plans 1