Suppose i have many quality characteristics that i need to inspect in the product and I can choose to design a series of inspection processes and allocate how many of these check items each station whould check.
How would you answer this question: What is the optimum number of check items should an inspector look into a product?
Example: 40 check items.
Should i do one inspection process where an inspector would look at the product if it deviates any of the 40 check items
or
should i do a series of 4 inspection stations each station owning 10 of the check items?
What should be done to answer that question?
Thanks
Reynald
How would you answer this question: What is the optimum number of check items should an inspector look into a product?
Example: 40 check items.
Should i do one inspection process where an inspector would look at the product if it deviates any of the 40 check items
or
should i do a series of 4 inspection stations each station owning 10 of the check items?
What should be done to answer that question?
Thanks
Reynald
.