M
Monica Lewis
Hello Don and Marc,
I have been working with the production people (only 3) for the last two weeks and to be honest I almost got a heart attack. Why? Because there are too many signatures and dates on the batch record, which do not make any sense. The same operator records, signs and dates each step on the batch record
(15 steps per page).In order to reduce the number of signatures, dates and make life easier for the poor operator I would like to have the following text on the end of each page or the last page: Step 1 to 15 has been performed on the same day by: _ _ _ (sign) Date: _ _ _ and step 2,3, 10 has been verified by: _ _ _ (sign) Date: _ _ _
Any comments on how to make life easy?
I have been working with the production people (only 3) for the last two weeks and to be honest I almost got a heart attack. Why? Because there are too many signatures and dates on the batch record, which do not make any sense. The same operator records, signs and dates each step on the batch record
(15 steps per page).In order to reduce the number of signatures, dates and make life easier for the poor operator I would like to have the following text on the end of each page or the last page: Step 1 to 15 has been performed on the same day by: _ _ _ (sign) Date: _ _ _ and step 2,3, 10 has been verified by: _ _ _ (sign) Date: _ _ _
Any comments on how to make life easy?