1. What is exact definition on Engineering Drawing?
One customer give us one CAD drawing about wiring harness when we have no design responsiliblity. Only what the customer attend such as shape of connector was defined in drawing. The color of connector is not defined. Does such CAD drawing be considered as customer's Engineering Drawing mentioned in APQP?
In the example mentioned above, if we also make one more particular CAD drawing for this wiring harness, does both drawing be considered as Engineering Drawing mentioned in APQP.
We design a part when we have design responsilibility. We design a CAD drawing for this part. Does such CAD drawing be considered as our Engineering Drawing mentioned in APQP?
2. What shall we do on Engineering Drawing in APQP
We have one excel form which name is "Engineering Drawing Validation". Do you have such similar form?
We are confuse how to roundly fill this form. This form include fields of validation item, drawing number, customer's requirement to product quality/technology, organization's requirement to product quality/technology, validation result.
Whose Engineering Drawing must been validated?
Who shall validate Engineering Drawing, customer or organization or both?
One customer give us one CAD drawing about wiring harness when we have no design responsiliblity. Only what the customer attend such as shape of connector was defined in drawing. The color of connector is not defined. Does such CAD drawing be considered as customer's Engineering Drawing mentioned in APQP?
In the example mentioned above, if we also make one more particular CAD drawing for this wiring harness, does both drawing be considered as Engineering Drawing mentioned in APQP.
We design a part when we have design responsilibility. We design a CAD drawing for this part. Does such CAD drawing be considered as our Engineering Drawing mentioned in APQP?
2. What shall we do on Engineering Drawing in APQP
We have one excel form which name is "Engineering Drawing Validation". Do you have such similar form?
We are confuse how to roundly fill this form. This form include fields of validation item, drawing number, customer's requirement to product quality/technology, organization's requirement to product quality/technology, validation result.
Whose Engineering Drawing must been validated?
Who shall validate Engineering Drawing, customer or organization or both?