I am working in a project as a process control engineer. I need to check the calibration certs issued by our subcontractor. Could you please let me know how to ensure that proper calibratin of the instruments has been done. The subcontractorhas got the calibration done from the third party & the report includes
NIST Std , Uncertanity level (k=2, 95% confidence level). Do I have to ask for Acuracy Ratio (TUR or TAR). Appreciate if you could let me know what to check, as I have to certify that calibration has been done properly.
Prasanna
I am working in a project as a process control engineer. I need to check the calibration certs issued by our subcontractor. Could you please let me know how to ensure that proper calibratin of the instruments has been done. The subcontractorhas got the calibration done from the third party & the report includes
NIST Std , Uncertanity level (k=2, 95% confidence level). Do I have to ask for Acuracy Ratio (TUR or TAR). Appreciate if you could let me know what to check, as I have to certify that calibration has been done properly.
Prasanna