SBS - The Best Value in QMS software

When there is a 2 year lapse in production, is a full FAI required?

#1
When there is a 2 year lapse in production, is a full FAI required? If the customer drawing has not changed, and there has been no change in process or tooling, can a Delta FAI be issued stating that no characteristics were impacted by the lapse?
 
Elsmar Forum Sponsor

Al Rosen

Staff member
Super Moderator
#2
When there is a 2 year lapse in production, is a full FAI required? If the customer drawing has not changed, and there has been no change in process or tooling, can a Delta FAI be issued stating that no characteristics were impacted by the lapse?
Yes, if the requirement is AS9102.
 

outdoorsNW

Quite Involved in Discussions
#3
The underlying reason for the two year rule is the concern that a series of small changes over time could add up to a significant change.

Keep in mind in AS9012, two years is measured from the end of production to the start of the next batch. If you have a long production process you may be able to gain a week to several weeks additional time before the FAI trigger.

The two year requirement only applies to AS9102 or if otherwise specified by the customer.

ISO9001 and AS9100 do not have a two year requirement (My company is certified.) And from what I have heard on elsmar and elsewhere, I don't believe it is a IATF-16949 or ISO13485 requirement either.
 
Thread starter Similar threads Forum Replies Date
WCHorn AS9102 Paragraph 5.3-5 - Lapse in Production - FAI Requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 9
T Definition Lapse in Production - Definition (AS9102) Definitions, Acronyms, Abbreviations and Interpretations Listed Alphabetically 2
I AS9102 lapse in production requirements - Customer FAI request AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 7
T Would my AS 9110 certificate lapse due to non availability of auditors ? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 11
C Lapse between ISO 13485 certificate expiring and new audit ISO 13485:2016 - Medical Device Quality Management Systems 9
R Quality Management System not active for 6 months. Registration let it Lapse or Fail? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
DuncanGibbons Pre FAI production terminology AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
C Validation of process for production and servicing 5.7.1.5 API Spec Q1, 9th Edition Oil and Gas Industry Standards and Regulations 3
O Production run inventory sell-by expiration date? APQP and PPAP 3
A ISO 9001 Internal Audits - No production right now due to furloughs Internal Auditing 5
DuncanGibbons Process flow & PFMEA for production planning and simulation activities? Process Maps, Process Mapping and Turtle Diagrams 7
D 6.1.2.3 Contingency Plan - Dispositions to restart production after an unplanned stoppage IATF 16949 - Automotive Quality Systems Standard 2
S Production Work Order Procedure 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 3
Techilady Ford Special Characteristics Communication and Agreement Form (SCCAF) provides production requirements? FMEA and Control Plans 4
thisby_ Post Market/Production Risk Assessment ISO 14971 - Medical Device Risk Management 0
Felony Melony Project Milestone Plan-Development to Mass Production APQP and PPAP 2
M Difference between "Production Trial Run" and "Run at Rate" IATF 16949 - Automotive Quality Systems Standard 8
M Material incoming to the production process reflected in PFMEA FMEA and Control Plans 9
C Scrapping on production floor - Setup parts 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 4
G Dealing with non conformity caused by Supplier Components detected in the production line IATF 16949 - Automotive Quality Systems Standard 14
T IATF Rules for sharing production space with another company IATF 16949 - Automotive Quality Systems Standard 10
qualprod Best practice to ensure inputting of data in production Lean in Manufacturing and Service Industries 19
R Monitor production quality - Internal KPIs Manufacturing and Related Processes 5
E Routine production tests - dielectric voltage withstand test IEC 60601 - Medical Electrical Equipment Safety Standards Series 4
P Conformity assessment based on a quality management system or production quality assurance EU Medical Device Regulations 3
Anonymous16-2 Dietary Supplement Raw Material/Component Storage and Production Manufacturing and Related Processes 1
L Significant Production Run - How 300 was determined to be the minimum quantity APQP and PPAP 2
Q ISO 9001 8.5.1 - Control of production and service performance ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
C Production and Post Production feedback - ISO 13485 ISO 13485:2016 - Medical Device Quality Management Systems 4
DuncanGibbons How is the arrangement between Design and Production organisation envisaged? EASA and JAA Aviation Standards and Requirements 4
J Production Line Test Brasil - High Voltage Dielectric Strenght Test Other Medical Device Regulations World-Wide 5
J Iterative design and production for custom made products ISO 13485:2016 - Medical Device Quality Management Systems 3
M Production approval testing - Alternative ideas for Validation Reliability Analysis - Predictions, Testing and Standards 4
S How do you record your Nonconforming product? Batch production of staged processes Nonconformance and Corrective Action 2
P Definition of production tooling in IATF16949 clause 8.5.1.6 IATF 16949 - Automotive Quality Systems Standard 4
Moncia Production Planning procedure ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
D Pre-Production Capability Assesment Reliability Analysis - Predictions, Testing and Standards 5
N Calibration Requirements for Production Equipment ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
A Production of raw materials in university labs? Lean in Manufacturing and Service Industries 11
D How long should we keep the spare parts available for our medical device, after we have stopped the production? ISO 13485:2016 - Medical Device Quality Management Systems 0
V ISO 9001: 2015 Production drawing Control ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
D Determining Calibration Frequency schedule for items used in production Manufacturing and Related Processes 2
T Customer audit demands - that I state in my QM who can shut down production AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 14
R IATF 16949 Clause 8.5.1.6 a) maintenance and repair facilities - Production tooling management and personnel IATF 16949 - Automotive Quality Systems Standard 4
Ed Panek Bringing Production In house ISO 13485:2016 - Medical Device Quality Management Systems 10
Q IATF 16949 certification without automotive products in "production" IATF 16949 - Automotive Quality Systems Standard 5
Ed Panek Small Medical Device company - Bring production in-house ISO 13485:2016 - Medical Device Quality Management Systems 1
Mr Skeleton PV (Production Validation) test plan responsibility APQP and PPAP 21
D Valeo 5 Axes and VPS (Production System) Lean in Manufacturing and Service Industries 1
C Medical Device Stability Studies - Non-validated pilot production Other Medical Device Related Standards 1

Similar threads

Top Bottom