SBS - The Best Value in QMS software

When to complete FAA Form 337 (Major Repair and Alteration)

D

darkopsghost

#1
Hello everyone!

Been a while since I have even been able to browse through the forum. Lots of work, military and corporate coming through the door and we are getting ready to complete our Stage 1 AS9110 in a few weeks.

I had an interesting request from a customer yesterday...

they said they required an FAA Form 337 completed on each of the parts sent to them.

Does no one read or understand Part 43 Appendix A or Appendix B? :frust:

We are a FAR 145 Repair Station and we provide an 8130-3 and when applicable, an 8110-3 for R.T.S.

Just real aggravating, plus it takes quite a bit of time to fill out 6, 7, and 8 on the form, plus when I get it back from the customer, I'll have to submit that with-in 48 hrs.

I have never filled out a 337 in almost 10 years, but we also do not have any FAR 121 or 135 customers either.


Has anyone else ran into this before?

Thanks in advance!

P.S. Marc; Hope all goes well with the surgery!
 
Elsmar Forum Sponsor
D

darkopsghost

#3
I found this, but you probably already have it.
.
Thanks Marc :thanks: and yes I do.

We're Airframers and our Ops Spec rating is "Limited Airframe" so it's not like we are going to go out and do Prop work or calibrate radio equipment.

Usually, I have the most problem with Receiving Inspectors that are not up to speed on Appendix A and B. Appendix B, ? (3) is what they fail to see.

Just makes for a long day and I think I'm having some BP issues because of it.
 
J

Jenkibm

#4
Haven't ran into this before. Most customers are satisfied with an 8130-3. Based on the context of your post, it doesn't sound like they understand what a Form 337 is.

My recommendation would be to contact your FSDO and get their take on it. I definitely wouldn't just start issuing a large number of 337's without talking to them...
 
D

darkopsghost

#5
Yeah Jenkibm :bigwave:, I called my PMI and he said basically the same thing.

I have always tried to explain a 337 as a "Hanger Document". Sometimes they get it; sometimes I have to lead them by the hand.

I haven't gotten anything back, so maybe they decided they didn't need them, but a call would have been nice. I was kinda dreading a call from my FSDO asking what I was doing. :bonk:

Maybe they read up on it on the Cove?! :cool:
 
Thread starter Similar threads Forum Replies Date
N Actor registration EUDAMED restricted: got no Email to complete the registration EU Medical Device Regulations 5
A How much does a complete biocompatibility test package cost? Other ISO and International Standards and European Regulations 1
A Is there a better way to do a complete assessment of our QMS? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 8
A Document Change Notice vs complete System re-write Manufacturing and Related Processes 4
G Best Practices for IT auditing - Is a session-id necessary for a complete audit trail? IEC 27001 - Information Security Management Systems (ISMS) 0
M How to complete structure Analysis and Function analysis sections' columns of AIAG-VDA DFMEA form FMEA and Control Plans 0
S New AIAG FMEA Process - How to complete the new format FMEA and Control Plans 32
D China - Where I can get NMPA complete structure/organogram chart and GB/YY format list China Medical Device Regulations 1
J0anne 90 Day Limit Imposed by NB to complete NCs raised at audit Preventive Action and Continuous Improvement 6
S What is considered the complete software medical device? Medical Information Technology, Medical Software and Health Informatics 6
L A Complete Control Chart Decision Tree Statistical Analysis Tools, Techniques and SPC 5
N Interesting Discussion How to Deal with Suppliers Who Refuse to Complete our ISO Survey? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 51
H FMEA sample for complete CNC machining process FMEA and Control Plans 1
B New to Metrology and told to complete Gage R&R with AIAG compliant software Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 16
P Searching for a complete audit check list based on ISO14001:2004 ISO 14001:2015 Specific Discussions 1
D What is a reasonable consulting fee for preparation of a complete traditional 510k? Consultants and Consulting 11
E Is Design Transfer to Production be complete prior to Release of first production lot 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 2
K Partial FAI on Semi-Complete Parts question ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
Q Complete Company Restructuring & Impact on ISO 9001 Certification ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 8
D Steps to Complete Quality Control Plans and Work Instruction Manufacturing and Related Processes 4
E Auto Populate Date and Time in an adjacent cell to one the user will complete..... Excel .xls Spreadsheet Templates and Tools 7
F Process Maps as a complete QMS Manual ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
S Calibration conducted to 3 steps only of the std instead of complete 5 steps General Measurement Device and Calibration Topics 4
2 Complete Cycle for Complaint Process - Idea Searching Customer Complaints 7
A AS9100 rev C Skill Examiner Audit to complete my RABQSA Auditor certification Career and Occupation Discussions 3
S AS9100C Complete Internal Audit Software Package Recommendations Quality Assurance and Compliance Software Tools and Solutions 13
optomist1 Complete list of all Default Conditions for Y14.5M 1994 Inspection, Prints (Drawings), Testing, Sampling and Related Topics 4
E List of Complete EMC Test Requirements consisting of IEC, EN, Cispr, etc. General Measurement Device and Calibration Topics 2
L ISO 9001 Clause 7.3.2 Design & Development Input - Adequacy, Complete, Unambiguous ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
M Requirement to complete an MSA when doing Comparative Tests Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 2
N The Gap Analysis is complete - From which clause do I begin? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
V Issue: Suppliers charge for complete Level III PPAP package - Heat Treated Parts APQP and PPAP 16
Hami812 Minitab and Control Charting Time to Complete each Repair Over Time Using Minitab Software 8
L Records Register is not maintained and is far from complete ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 14
S Required Complete calibration SOP, calibration Plan and master list template! IATF 16949 - Automotive Quality Systems Standard 3
S AS9102 Form 1 Item 19 FAI Complete / Not Complete Box - Requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 9
F Importance of Complete Inspection Records in Aerospace Manufacturing Inspection, Prints (Drawings), Testing, Sampling and Related Topics 5
G Help needed to complete a Financial Audit of a Nonprofit Organization Various Other Specifications, Standards, and related Requirements 7
J ISO9001:2008 - What a complete joke! ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 85
L 5S Auditing & Accountibility - Keeping our 5S tool boards complete and accounted for Lean in Manufacturing and Service Industries 13
R Creating Quality System and using it before it is complete ISO 13485:2016 - Medical Device Quality Management Systems 8
P Help Needed to complete audit hours under a Certified Lead Auditor - ISO 9001 General Auditing Discussions 5
N Basic MSA - A simple way to complete an MSA study on Dial Calipers Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 5
C Complete ISO idiot on a steep learning curve - Quality Manual Review appreciated ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
A Complete change of the ISO 9001 Quality Management System ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 12
P Earned Value Calculation when you have moved forward but work is not complete Quality Tools, Improvement and Analysis 1
B Is it Compulsory to complete Management Review before Stage 1 Audit? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 22
R Requirement to Complete Missing Documentation - Changing Registrars Quality Manager and Management Related Issues 6
T 21 CFR Part 11 Compliance - Generation of Complete Copies of Records Qualification and Validation (including 21 CFR Part 11) 3
SteelMaiden Surveillance Audit Complete ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5

Similar threads

Top Bottom