Hi there. I have a question that I know does not have a black or white answer, but I'm basically looking for any interesting insights.

One of the metrics we use to measure supplier performance is supplier PPM, calculated in the conventional way or reject rate per million.

Now our systems are similar to B3, where we require our suppliers to submit a PPAP before starting production and then we have a further Job#1 date of the new product, which usually happens 3-4 months after our suppliers submit their PSWs. In this period of time we run our pre-production, which are saleable units to the customer.

Our current process is that anything that is rejected in the plant (IQ or in process) is considered in the supplier PPM calculation.

However, there is a question to whether we should only consider rejected parts after the Job1, since the first pre-production lots have a greater risk of quality issues (though supplier PSW should have been signed at this point of time).

Then the question is, considering the following two alternatives, which one is the one that represents more the supplier quality:
1) A metric that includes every rejected part when calculating the reject rate (this could include pre-series, prototypes, etc)?
2) A metric that include rejected parts after a 'stabilization period' of 3-4 months after supplier PSW?

The two options actually measure different things, Any of you see any particular benefit of using either one of the methods?

Javier
 
Elsmar Forum Sponsor

Kales Veggie

People: The Vital Few
#2
Re: When to start counting supplier PPM?

All rejects. Very simple. Why is it OK for supplier to send in rejects during the first 4 months?

If APQP/FMEA/Control Plan/PPAP/GP12(or similar) are done effectively, why would there be any rejects from your supplier?

A reject is a reject.....same goes for proto-types.
 

Jim Wynne

Staff member
Admin
#3
Re: When to start counting supplier PPM?

All rejects. Very simple. Why is it OK for supplier to send in rejects during the first 4 months?

If APQP/FMEA/Control Plan/PPAP/GP12(or similar) are done effectively, why would there be any rejects from your supplier?

A reject is a reject.....same goes for proto-types.
The reason for rejection is important; sometimes in the prototype or pre-production phase the design is fluid and things get thrown out that aren't necessarily the fault of the supplier. During this period of time, the objective should be design validation, and the less finger-pointing and blame-seeking the better.

As to the OP's question, I don't think that PPM makes any sense at all unless you're actually dealing with millions of things. We ask suppliers to insure that their processes are stable and capable, but both of those things are based on the concept of randomness. If there's (for example) only a chance of 100 in 1,000,000 that any defect will occur, it doesn't mean that 1,000,000 individuals must be created in order to see the 100 defects. This means that if a supplier's PPM rate is 1000 today, it might not be 1000 after a million iterations. The point is that if we can't know what the actual rate might be after a million chances, there's no sense in using estimates that don't take long-term randomness into account.
 

Kales Veggie

People: The Vital Few
#4
Re: When to start counting supplier PPM?

The reason for rejection is important; sometimes in the prototype or pre-production phase the design is fluid and things get thrown out that aren't necessarily the fault of the supplier. During this period of time, the objective should be design validation, and the less finger-pointing and blame-seeking the better.

As to the OP's question, I don't think that PPM makes any sense at all unless you're actually dealing with millions of things. We ask suppliers to insure that their processes are stable and capable, but both of those things are based on the concept of randomness. If there's (for example) only a chance of 100 in 1,000,000 that any defect will occur, it doesn't mean that 1,000,000 individuals must be created in order to see the 100 defects. This means that if a supplier's PPM rate is 1000 today, it might not be 1000 after a million iterations. The point is that if we can't know what the actual rate might be after a million chances, there's no sense in using estimates that don't take long-term randomness into account.
Very simple again. Then it is not the fault of the supplier, but engineering or purchasing or whoever.

A supplier reject is a supplier reject.
 

Jim Wynne

Staff member
Admin
#5
Re: When to start counting supplier PPM?

Very simple again. Then it is not the fault of the supplier, but engineering or purchasing or whoever.

A supplier reject is a supplier reject.
What you don't seem to understand is that in the early stages, things can be very ambiguous, and move so quickly that it's difficult (and senseless) to try to ascribe blame. What's the point in starting the PPM clock when the product might be substantially different when real production begins? We all know that part of what got the US auto industry in trouble was (is?) their inveterate finger-pointing and blame-seeking. Why encourage it?
 
Thread starter Similar threads Forum Replies Date
R Power Failure or Cold Start Situation in PFMEA FMEA and Control Plans 6
U Examples of Quality Objectives for a Medtech start up ISO 13485:2016 - Medical Device Quality Management Systems 4
J ISO 13485 System 'soft start' - How to best reflect this in initial audits, management review minutes and other records? ISO 13485:2016 - Medical Device Quality Management Systems 3
A AS9100 Training - Where do I start? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 14
mike10 QMS Update - Rev. up or start over? Document Control Systems, Procedures, Forms and Templates 5
N China - Start manufacturing before change approval? China Medical Device Regulations 3
S How to start with ISO process in project based team - Documentation Document Control Systems, Procedures, Forms and Templates 4
A Implementing ISO 20000-1 - Where to start Other ISO and International Standards and European Regulations 2
T CE mark start date for a device EU Medical Device Regulations 7
qualprod Statistics - Where to start in ISO 9001? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
W My company is looking to start a materials testing lab that conforms to ISO17025:2017 ISO 17025 related Discussions 3
G Start and main steps of API Q1 Certification Process Various Other Specifications, Standards, and related Requirements 5
M Error trying to Start a New Thread Elsmar Cove Forum Suggestions, Complaints, Problems and Bug Reports 2
H Transferring an ISO 13485 certificate to a new CB - Do I have to start from scratch? ISO 13485:2016 - Medical Device Quality Management Systems 2
M Start-Up Company looking for ISO 13485 Certification Body and Medical Device CE Mark Notified Body Registrars and Notified Bodies 6
Marc Basic - How to Start a New Discussion Thread Elsmar Xenforo Forum Software Instructions and Help 1
TheMightyWife Can not start Personal Conversations Elsmar Cove Forum Suggestions, Complaints, Problems and Bug Reports 18
E Is it possible to start an ISO 9001 QMS from scratch (Really) ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 13
M AS9100 - Where to start - Small company (10 employees) and I am the Quality Dept. AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 45
M How do you start a calibration/anything company? Career and Occupation Discussions 11
E ISO 9001 certification of the new plant before start of production ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 18
B Gap analysis of new start-up company technical documentation CE Marking (Conformité Européene) / CB Scheme 1
qualprod How to start with Lean? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 8
R QMS and ISO - Where to start? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 18
S ISO 17025 - Help in Getting accreditation- Where to start from ISO 17025 related Discussions 12
H Need to Start an R&D Laboratory, what to do? Design and Development of Products and Processes 6
O Start Up Approval Dimension Records IATF 16949 - Automotive Quality Systems Standard 5
V Product Development - When to start calculating Process Capability Capability, Accuracy and Stability - Processes, Machines, etc. 3
Moncia Design FMEA - Where to Start FMEA and Control Plans 20
M Where does Document Revision Control Start? Rev 0 or Rev 1 Document Control Systems, Procedures, Forms and Templates 19
M How to Start SPC from the ground up! Statistical Analysis Tools, Techniques and SPC 8
A Start Up of a small AS9100 Machine Shop AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
P CA,PA, Continual Improvement - How to start in a Service Company Quality Tools, Improvement and Analysis 1
P Where to start to helping other companies to get ISO IEC 27000? Consultants and Consulting 1
A How best to start revising an existing ISO 9001:2008 system in a company ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
M APQP and PPAP for Beginners - Where do I start? APQP and PPAP 48
S How to Start SPC in a Shaft Grinding Section Statistical Analysis Tools, Techniques and SPC 1
M Start New Machine Shop OR BUY Business Continuity & Resiliency Planning (BCRP) 9
K Disaster Recovery and Business Continuity Planning - Where to start? Business Continuity & Resiliency Planning (BCRP) 20
Hershal ILAC is preparing to start the possible revision to ISO/IEC 17025 ISO 17025 related Discussions 2
S How do I start "Risk Management" ISO 14971 - Medical Device Risk Management 3
L Where to Start to Completely overhaul a QMS ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 11
D Which ASQ Certification should I start with? Career and Occupation Discussions 9
A Start Compliance to RoHS, SCHV and REACH RoHS, REACH, ELV, IMDS and Restricted Substances 10
M Where to start Maintenance Function Kaizen Lean in Manufacturing and Service Industries 4
J ISO 13485 and ISO9001 Quality Management Implementation Start ISO 13485:2016 - Medical Device Quality Management Systems 6
A ISO 9001 to ISO 17025 where to start ISO 17025 related Discussions 3
J Major Nonconformance on Stage 2 Audit causes to start over Stage 1? IATF 16949 - Automotive Quality Systems Standard 2
M General Guidelines on how to start a Quality Campaign Misc. Quality Assurance and Business Systems Related Topics 2
P Alternative Procedures to DOA: How to start? EASA and JAA Aviation Standards and Requirements 3

Similar threads

Top Bottom