Search the Elsmar Cove!
**Search ALL of Elsmar.com** with DuckDuckGo including content not in the forum - Search results with No ads.

Which batches should or could be considered for design validation and design verification?

#1
product development can be considered from various phases viz.,
Prototype - Pilot/scale up - exhibit/submission(pivotal) - commercials

my question is, justification required for considering following
1. prototype / scale up for design verification.
2. submission/.exhibit batches be considered for both verification and validation in sequence.
3. for Design Verification & Validation, can certain parameters/characteristics be split between pilot and pivotal batches.
 
Top Bottom