Why there is no initial evaluation in OHSAS 18001:1999?

Elsmar Forum Sponsor
D

David Mullins

#2
Sorry - please explain your question.
And then explain why it's funny.
Clearly I have no sense of humour today!
 
S

s_warin

#3
Who knows, please tell.

In BS 8800 figure 1. Elements of successful health & safety management based on the approach in BS EN ISO 14001, there begin with initial status review.

I would like to know the reasons why there is no initial status review in OHSAS 18001.

Actually, when we talk about Deming Circle we begin with p-plan. Most of the organizations run the business for years before implement the standard. So why not begin with E-evaluation of the status before beginning implementation of the standard? Sorry, the evaluation is initial status review.

Why there is no initial status review in OHSAS 18001?

:bonk:
 

Randy

Super Moderator
#4
Maybe because it's an voluntary standard with no guidance document like IAF Guide 66 for ISO 14001, and it's application is totally up to the organization and any registering body (if any).

You make the rules up as you go. It's not rocket science.;)
 

Randy

Super Moderator
#6
Yes I have. I bought it from BSI-CEEM.

OHSAS 18002 works like ISO 14004, it provides guidance for implementing a safety management system.
 
Thread starter Similar threads Forum Replies Date
A API Q1 5.6.1.2 - Initial Supplier Evaluation Oil and Gas Industry Standards and Regulations 9
I ISO 10993-1:2009 Sensitization (Initial Evaluation Test) vs. USP Other Medical Device Related Standards 3
quality1 Initial Supplier Evaluation Method - 7.4.1 Purchasing Process ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
B Chrysler requirement of Initial Risk Evaluation IATF 16949 - Automotive Quality Systems Standard 2
D Subcontractor Evaluation - Require onsite visit after the initial audit? Misc. Quality Assurance and Business Systems Related Topics 5
J How much to charge for helping a startup company with initial ISO 13485 certification? Consultants and Consulting 3
J ISO 13485 System 'soft start' - How to best reflect this in initial audits, management review minutes and other records? ISO 13485:2016 - Medical Device Quality Management Systems 3
H CQI-15 2nd Edition - Date of initial assessment? IATF 16949 - Automotive Quality Systems Standard 3
MrTetris How to qualitatively assess initial probability ISO 14971 - Medical Device Risk Management 4
S Private Label Requirements, Manufacturer's Registration & Initial Importers 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 2
S Medical Device Initial Importer (DII) Requirements - Delivery Address 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 0
J AIAG PPAP: 2.2.11.3 Acceptance Criteria for Initial Study (page 9, 4th edition) APQP and PPAP 1
L Why is initial production units, lots, or batches, or their equivalents required for Design Validation? US Food and Drug Administration (FDA) 3
S Initial Importer and ISO 13485 (MDSAP) - Will the US company be included? ISO 13485:2016 - Medical Device Quality Management Systems 1
S Should an Initial Importer separately do Establishment Registration? US Food and Drug Administration (FDA) 1
Y Time gap for First Surveillance Audit of AS9100D after initial certification AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 13
J Initial capability for injection molding part Capability, Accuracy and Stability - Processes, Machines, etc. 6
T Customer special status and initial IATF certification IATF 16949 - Automotive Quality Systems Standard 12
A Setting initial Expiry Date of an IVD per BS EN 23640:2015 Other Medical Device Related Standards 12
S Registration/Listing; Initial Importer - Private Label w/ Foreign Establishment 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 7
V Inspection of Initial Importer/ Distributor Products and Materials 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 1
GURU SDI Cleanliness Requirements for Initial Samples Customer Complaints 4
dubrizo Initial Supplier Identification, Review and Controls ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
dubrizo Initial Impressions of Newly Released IATF 16949 Standard IATF 16949 - Automotive Quality Systems Standard 43
C Service and maintenance in an initial importer facility USA 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 4
A We passed our ISO TS 16949 initial certification Covegratulations 3
K Initial Samples with dimensional deviation in Serial Production Inspection, Prints (Drawings), Testing, Sampling and Related Topics 2
E Addition of Label by Initial Importer 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 3
S Struggling with definition of Initial Importer and First Title 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 2
W AS9100C registration - How long does the system have to run before initial audit? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 9
J Required Audit Days for TS 16949 Initial Certification Audit IATF 16949 - Automotive Quality Systems Standard 1
JodiB Is DCR (Document Change Request) Needed for Initial QMS Procedures? Document Control Systems, Procedures, Forms and Templates 16
4 Initial Environmental Review and Gap Analysis, difference? Miscellaneous Environmental Standards and EMS Related Discussions 8
C DCN or ECN for Initial Release of FMEA & CP and subsequent changes? FMEA and Control Plans 3
JoCam NADCAP Initial Audit Cancellation AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 11
E Initial Registration of an Establishment with FDA US Food and Drug Administration (FDA) 5
W Contract Initial Importer and Order Handling for a Class I Medical Device Service Industry Specific Topics 2
L How to change the status of "Initial Importer" on the FURLS site US Food and Drug Administration (FDA) 1
Q Engineering purchased a new Caliper - 7.6 - Initial Calibration Required? General Measurement Device and Calibration Topics 6
J Customer wants a P-value with our initial Process Studies Statistical Analysis Tools, Techniques and SPC 4
C Is an Initial Environmental Review a must while implementing ISO 14001 ISO 14001:2015 Specific Discussions 5
M 7.5.1.3 Should mentioned examples such as initial run be verified or validated? IATF 16949 - Automotive Quality Systems Standard 1
W How do you determine the initial recall date for instrumentation? General Measurement Device and Calibration Topics 1
K 820.180(b) Record Retention - Does it apply here? We act as the initial Importer 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 4
X General Motors' initial process study requirements APQP and PPAP 1
H Design Control Requirement - Initial Distributor of a Class I Video Laryngoscope US Food and Drug Administration (FDA) 4
M AS9100 Rev C Initial Certification - Determination of Competence AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
N Initial Status Review - Certification to OHSAS 18001 Occupational Health & Safety Management Standards 4
S What's the difference between prototype and initial samples? APQP and PPAP 5
B Fabricated Dry Powder Storage Tank - Initial Cleaning Food Safety - ISO 22000, HACCP (21 CFR 120) 5

Similar threads

Top Bottom