The Elsmar Cove Business Standards Discussion Forums More Free Files Forum Discussion Thread Post Attachments Listing Elsmar Cove Discussion Forums Main Page
Welcome to what was The Original Cayman Cove Forums!
This thread is carried over and continued in the Current Elsmar Cove Forums

Search the Elsmar Cove!

Wooden Line
This is a "Frozen" Legacy Forum.
Most links on this page do NOT work.
Discussions since 2001 are HERE

Owl Line
The New Elsmar Cove Forums   The New Elsmar Cove Forums
  QS-9000
  Inventory Control and Production Planning and QA

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   Inventory Control and Production Planning and QA
Michael
Lurker (<10 Posts)

Posts: 1
From:Perth,WA,Australia
Registered: Sep 98

posted 01 September 1998 08:16 PM     Click Here to See the Profile for Michael   Click Here to Email Michael     Edit/Delete Message   Reply w/Quote
Does anyone have steps/information/etc on the writing of an Inventory Control Procedure? In particular things to include in the document?

I am also after the same type of information for a Production Planning procedure.

I wish to make sure that I address all the required elements or issues.

IP: Logged

Marc Smith
Cheech Wizard

Posts: 4119
From:West Chester, OH, USA
Registered:

posted 09 October 1998 03:44 AM     Click Here to See the Profile for Marc Smith   Click Here to Email Marc Smith     Edit/Delete Message   Reply w/Quote
The biggest thing I look for in material control is first in-first out, how you deal with date sensitive materials and how you deal with temperature sensitive materials. I don't have any sample procedures but then again, material control procedures tend to be quite company/facility specific.

As far as a production planning procedure, write it with consideration to the APQP manual. You should be looking at a high level document and you may have lower level (department specific) procedure(s).

Anyone else with comments?

IP: Logged

Arturo Rosales
Lurker (<10 Posts)

Posts: 9
From:Dallas, Texas
Registered: Sep 98

posted 09 October 1998 09:56 AM     Click Here to See the Profile for Arturo Rosales   Click Here to Email Arturo Rosales     Edit/Delete Message   Reply w/Quote
Of course do not forget how are you going to handle customer supplied product, mil spec material, etc.

IP: Logged

barb butrym
Forum Contributor

Posts: 637
From:South Central Massachusetts
Registered:

posted 09 October 1998 05:30 PM     Click Here to See the Profile for barb butrym   Click Here to Email barb butrym     Edit/Delete Message   Reply w/Quote
especially important is the HSPPD thing on assessing the condition of stored stuff for deterioration etc.

IP: Logged

Douglas Purdy
Lurker (<10 Posts)

Posts: 9
From:Hanover Park, IL, USA
Registered: Oct 98

posted 20 October 1998 12:23 PM     Click Here to See the Profile for Douglas Purdy   Click Here to Email Douglas Purdy     Edit/Delete Message   Reply w/Quote
And do not forget the obvious, to specify how material "enters" and "exits" your designated storage and stock areas. Add the mechanism used by your company that accounts for the material "needs" or "requirements" and you have an inventory management system.

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!